Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-10-28 Special Meeting Agenda - Item 1 - Attachment 3 - RAL18-0023 - Master Plan Stage 1

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1                                                                           19

SUB-     PRIMARY              SECONDARY OBJECTIVE                                  STRATEGIC PLAN            INTENT & PERFORMANCE STANDARDS
PRECINCT FUNCTION             FUNCTION                                             PROVISIONS (with
                                                                                   direct influence)
E2            Employment      Educative     Provision of a key                     19.3.1.2, 19.3.1.9,       Sub-Precinct E2 comprises a central employment node with an educative theme. It is expected
                              Research (3.3 employment node based on               19.3.1.12                 that there will be business associations formed between this node and that of Sub-Precincts E1
                              ha.)          the educative research area.                                     and E3 and its proximity to Sub-Precincts B1, B2 and E1 are key factors.
                                            PROCESS PRINCIPLES:                                              a.   Specific floor space allocations will be considered as part of Stage 2 of the Master Plan and
                                               Code assessment – Material                                         on any relevant development application, however by way of guide, the ratio of TUA (for all
                                               changes of use (new                                                functions) to area of the sub-precinct up to 0.2:1.
                                               development) and                                              b.   Most vehicular parking will be provided as part of central parking facilities beneath Sub-
                                               reconfiguration (land)                                             Precincts B1, B2 and E2.
                                               Self assessment – Material                                    c.   Building heights of 1 and 2 storeys (over basement parking).
                                               changes of use (existing                                      d.   Development to have strong visual linkages with Sub-Precincts B1, OS2 and OS4.
                                               development)
                                                                                                             e.   Development to have strong pedestrian and bikeway connectivity with Sub-Precincts B1 and
                                                                                                                  OS4.
                                                                                                             f.   As a general principle, there will be few ground level vehicular traffic movements.
                                                                                                             g.   Development expected to be staged consistent with need, however the first stage of
                                                                                                                  development will proceed at the same time as the first stage of development within Sub-
                                                                                                                  Precinct B1.
                                                                                                             h.   Development in this sub-precinct will have significant relationships to the tertiary education
                                                                                                                  sector and with development in Sub-Precincts E1 and E3.




J C:\Documents and Settings\oludvigsen\Local Settings\Temporary Internet Files\OLK7\Master Plan.doc Final,                   endorsed                    by                   Council                    24/05/2001
Log in to download the original file

2019-10-28 Special Meeting Agenda - Item 1 - Attachment 3 - RAL18-0023 - Master Plan Stage 1(PDF, 1MB).pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.