Log in to see the plans as drawnCHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1 22
SUB- PRIMARY SECONDARY OBJECTIVE STRATEGIC PLAN INTENT & PERFORMANCE STANDARDS
PRECINCT FUNCTION FUNCTION PROVISIONS (with
direct influence)
OS4, OS5, Open Space Environmental Provision of a areas serving 19.3.1.9, 19.3.1.10, Sub-Precincts OS4, OS5, OS6 and OS7 comprise the existing natural drainage paths through the
OS6 & OS7 Drainage (total as the primary drainage paths 19.3.1.11, 19.3.1.12 site. The intention is to retain these in their natural state where possible, however the need to
6.0 ha.) and stormwater polishing ensure that run-off waters are polished necessitates some engineering of the drainage works.
areas of the site, as well as a. While modification to the existing vegetation is expected within these sub-precincts, existing
providing key open space vegetation and existing surface levels are to be retained where possible. Re-vegetation of
spines for aesthetic purposes disturbed areas will use species consistent with that of the existing drainage paths.
through the site.
b. Pedestrian and bicycle access through these areas may be significant, particularly for Sub-
PROCESS PRINCIPLES: Precincts OS4 and OS7.
Impact assessment – Material c. Vehicular access will be controlled.
changes of use (new and
existing development) and
reconfiguration (land)
REC Recreation 1.9 ha. Provision of an area for the 19.3.1.2. 19.3.1.8, Sub-Precinct REC is intended as a recreation precinct. While other recreation facilities may be
location of both indoor and 19.3.1.9, 19.3.1.12 found within the Shire Business Centre site proper, Sub-Precinct REC will be dominated by
outdoor, formal and informal outdoor functions.
recreation activities. a. Specific floor space allocations will be considered as part of Stage 2 of the Master Plan and
PROCESS PRINCIPLES: on any relevant development application, however by way of guide, the ratio of TUA (for all
Impact assessment – Material internal functions) to area of the sub-precinct up to 0.2:1.
changes of use (new b. Building heights of generally 1 storey.
development) c. Significant care will need to be exercised in the treatment of drainage to the adjacent
Code assessment – Material National Park.
changes of use (existing d. Pedestrian and bikeway connectivity to the balance part of the site will be a key factor in the
development and, subsequent design of roads in the area, with a grade separated system necessary. Key connectivity will
to adoption of Stage 2 of the be required between Sub-Precinct REC and those of Sub-Precincts B1, B2 and E1.
Master Plan, new development)
and reconfiguration (land) e. Vehicular parking will be provided on-site.
f. Development expected to be staged, however it is expected that the site will be developed to
its potential at 2007.
J C:\Documents and Settings\oludvigsen\Local Settings\Temporary Internet Files\OLK7\Master Plan.doc Final, endorsed by Council 24/05/2001