Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 1                                                                                                                                                                                            6

19.3.1.6 The master plan will be prepared in                                                                                      •    Separate buildings, rather than large bulky
consultation with relevant stakeholders including the                                                                                  developments under a single roof.
developer, Noosa Council, State Government                                                                                        19.3.1.10 Drainage systems will be designed to
agencies and the local design community and key                                                                                   prevent water quality impacts in Eenie Creek. Such
stakeholders in the area. It will also include                                                                                    drainage systems will be designed for the collection
consultation with the general community. The plan                                                                                 of part of the runoff waters from the existing industrial
will require approval from Noosa Council and                                                                                      estate in order to improve runoff water quality from
relevant State Government agencies.                                                                                               that area.
19.3.1.7 The sequencing of development will be                                                                                    19.3.1.11 Dedication of a significant open space area
consistent with the master plan and the needs of the                                                                              adjacent to Eenie Creek, which connects to the
community.                                                                                                                        drainage system of the site and to the key gathering
Design Considerations                                                                                                             places and open space areas within the centre.
19.3.1.8 Whilst the development will have entry                                                                                   19.3.1.12 Development will meet the requirements of
statements on its access points, the overall                                                                                      the Environmental Management Aims and adhere to
development will have an internal focus and not be                                                                                Strategic Principles, 25.1-25.4 and Development
reliant on main road exposure. As a consequence,                                                                                  Principles 26.1-26.9.
significant landscape buffering will be provided to                                                                               External Traffic Movements
Eenie Creek Road and the Emu Mountain Road-
Eenie Creek Road route.                                                                                                           19.3.1.13 The development will contribute towards
                                                                                                                                  the construction of external roadworks through a
19.3.1.9 The design of the overall Shire Business                                                                                 construction and contributions strategy which has
Centre, together with individual elements within it,                                                                              regard to the sequencing requirements of 19.3.1.3
will be distinctive and unique. Its design will be                                                                                and 19.3.1.5. This strategy will recognise the staging
determined by its setting and will be recognisable as                                                                             programme and provide for the timing of any
a development within Noosa Shire.                                                                                                 construction and contributions consistent with that
To achieve this, the Shire Business Centre and                                                                                    programme.
particularly the retail, business, office and community
components will have an outdoor focus, with the                                                                                   19.3.1.14 Access points to and from Eenie Creek
site’s topographic, vegetation and local climatic                                                                                 Road and to any new route between Emu Mountain
features integrated into the development. Key                                                                                     Road-Eenie Creek Road will be minimised and
features will include:-                                                                                                           strictly controlled to avoid traffic hazards and
                                                                                                                                  congestion and to prevent ribbon development. It is
•    Retention of existing              vegetation                              as              key                               preferable that there be one point of access to each
     landscape elements;                                                                                                          road. Traffic movements at intersections will be
•    Existing drainage         paths                as                key     drainage                                            controlled by roundabouts.
     patterns;                                                                                                                    19.3.1.15 Traffic movements should be based on
•    A low rise form of mainly single storey buildings;                                                                           bringing traffic into the site away from the external
                                                                                                                                  roads and then dispersing that traffic to appropriate
•    Integrated approaches to establishing land use
                                                                                                                                  carpark areas. External roads will not form part of the
     arrangements, development designs and
                                                                                                                                  dispersal system.
     landscaping;
                                                                                                                                  19.3.1.16 A transport link should be provided
•    Energy efficiency in the design of buildings and
                                                                                                                                  between Production Street and the new route, Emu
     the operation of the centre; and
                                                                                                                                  Mountain Road-Eenie Creek Road.


FIGURE 22

ROAD                                                                                                  TARGET UTILITY CHARACTERISTICS
                                         Ultimate control authority




                                                                                                                                                                Local street and property




                                                                                                                                                                                                                            Suitability for school bus
                                                                                                       intersection approaches




                                                                                                                                                                                             suitability on or close to
                                                                                                        No. of lanes, excluding




                                                                                                                                                                                              Pedestrian and bicycle
                                                                            Speed environment




                                                                                                                                           Intersection type




                                                                                                                                                                                                   carriageway
                                                                                                                                                                         access




                                                                                                                                                                                                                                       route




Eenie Creek Road, plus
extension over Weyba Creek              State                         60-80 km/hr1                             4                        At grade               Limited                      Unsuitable                    Suitable1

Emu Mountain Road-Eenie
Creek Road                            Council                         60-80 km/hr1                           21                         At grade               Limited                      Unsuitable                    Unsuitable
                                  1
                                      Excluding urban areas.
                                                                                                                                                                                                                                          n
                                                                                                                                                                                                                                     a Pla s
                                                                                                                                                                                                                                   s
                                                                                                                                                                                                                              N o o uture
                                                                                                                                                                                                                            e        F
J C:\Documents and Settings\oludvigsen\Local Settings\Temporary Internet Files\OLK7\Master Plan.doc                                                                                                                       Th o s ing
                                                                                                                                                                                                                             o
                                                                                                                                                                                                                          Ch
Log in to download the original file

2019-10-28 Special Meeting Agenda - Item 1 - Attachment 3 - RAL18-0023 - Master Plan Stage 1(PDF, 1MB).pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.