Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Compiled Approved Plans - 132003.221152.8

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 STORMWATER DRAINAGE

           Stormwater will be collected by a conventional arrangement of gutters,
           slatted field drains and downpipes and piped through to the Council
           stormwater main in Park road. The stormwater will connect to the Council
           main gulley pit to limit surcharge.


CLEARING

           The proposed development retains all the significant trees on the
           property. Identified on the Tree Protection Plan Rev B 11/08/2017
           prepared by Myles Baldwin Design and in accordance with AS 4970—
           2009. Protection of Trees on Development Sites.
           A number of smaller trees previously planted by the owner of No. 12 Park
           Road will be removed to allow access and for construction of footings.
           (Refer to Survey/Engineering Plans). On completion a similar tree will be
           replanted in each original location on site and in the road reserve to provide
           and effective visual barrier to the undercroft of the proposed deck

           Prior to construction all trees will be clearly tagged and recorded on a
           survey plan. On completion the trees will be resurveyed to ensure full
           compliance with the conditions of the Development Approval.

           All work on the subject site is to be undertaken in accordance with the
           approved Tree Protection Plan, Development Permit for operational works
           (landscaping), construction management plan and conditions of council
           approval

           No regrading of the slopes within the Tree Protection Zone will be
           permitted. The regrading of the slopes (to improve overall long-term
           stability) beneath the terrace will disturb the existing vegetation. On
           completion it is proposed to replant beneath the terrace with shade
           tolerant native species.



Amendment 2.
As part of the Proposal to install a lift from the level of the previously approved terrace deck level,
to the main floor level of the existing house including a modest extension of the existing main
house deck the tree protection plan has been amended (Revision D) to cover an extra tree.
The Revised tree protection plan is to be submitted concurrently with this construction
management plan.
References to the tree management plan contained in this construction management plan are to
be interpreted as referring to the most recent version approved by Noosa Shire Council.
All work on the subject site is to be undertaken in accordance with the most recent approved Tree
Protection Plan, Development Permit for operational works (landscaping), construction
management plan and conditions of council approval
Log in to download the original file

Compiled Approved Plans - 132003.221152.8.pdf · 5.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.