Original source · versioned page text
App B - Effluent Information
7.0 Design Drawings This plan is site specific for 122 Musa Vale Road, Cooroy 9000mm 6000mm Note: Correct installation of connectors in AES Manual page 9. Inlet 1350mm level Inspection Port Low Vent AES pipe pack sand under 300mm Ground level Area A 4000mm Infiltration Area (A) 9000 x 1350mm Area B Entire bed base is to be ripped Infiltration Area (B) 9000 x 2650mm 250mm parallel to AES Pipes Gypsum applied at 1kg / m2. Not to scale Inspection Port 150mm 300mm 300mm Imported sand (course washed) 150mm Backfill with site soil min 150mm cover over sand 300mm Sand and mound soil over bed to prevent water access. AES Sand Coverage Minimums IMPORTANT NOTES PLEASE READ. troP noitcepsnI mm003 The installer MUST refer to the Advanced Enviro-Septic Design & Installation Natural Ground Level 6 Manual provided. If you do not have a copy of this manual please contact Chankar % slope Inspection Port Environmental and a copy will be emailed FREE. 150mm 150mm Sections C, D, & E of the Design and Installation Manual are of particular relevance when installing an Advanced Enviro-Septic System. 300mm THIS IS NOT A SEPTIC TRENCH AND MUST BE INSTALLED AS PER THE 300mm AES DESIGN AND INSTALLATION MANUAL GUIDELINES. Rip 250mm parallel to pipes. Gypsum 1kg / m2 Ensure you have the correct sand and all fittings to complete the installation if you 2650mm are unsure of anything please contact Chankar Environmental (07) 54 744 055 or 1350mm Scale 1:30 @ A3 Biowater Designs 07 54 947 620 or 0407 887 321. C Lance Picton 2023 all rights reserved 6/11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (App B - Effluent Information.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.