Original source · versioned page text
Attachment 6 - Waste Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnAttachment 6 – Waste Management Plan
November 2020
• Waste storage area maintenance – The bins will be washed inside the enclosure that will be
drained to an approved sewerage connection point. A water tap and hose will be positioned inside
the enclosure. The maintenance and cleaning of the bin storages area is the responsibility of the
Maintenance Contractor engaged by the Body Corporate. It is the Maintenance Contractors
responsibility to ensure that the bin storage areas are kept clean and tidy, take all practicable
steps to prevent infestation of vermin and / or insects and is kept in a clean and sanitary condition.
The bin storage areas are to be maintained to a standard acceptable to the Body Corporate
committee.
Should you require anything further or wish to discuss any aspect of the above, please do not hesitate to
contact me.
Yours sincerely,
James Brownsworth
DIRECTOR
INNOVATIVE PLANNING SOLUTIONS
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.