Council archive · source document
07/0012 - Response to Information Request [As Published] · 132007.12
tiny Mixed Medical Office Extension Trattle Parking Acoustice © 2007 - TTM Consulting (SC) Pty Ltd Project No: 23566rep2 5. Road Network Performance 5.1 Current Intersection Performance The current performance of the roundabout at Goodchap Street and Eumundi-Noosa Road has been analysed using AaSidra and the results are summarised in the table below. - Table 5.1 Intersection Performance Summary 2006 (includes existing development) Approach PM Peak DoS(%) Delay (s) Los Q(m) Eumundi-Noosa Road (Nth) 39.6 5.9 A 23 School 13.8 10.4 B 6 Eumundi Noosa Road (Sth) 34.4 7.0 A 19 Goodchap Street 35.8 13.0 B 17 The degree of saturation for the Eumundi-Noosa Road approaches has improved since the last assessment in 2004 which would be due to network improvements. The Goodchap Street intersection has become slightly more congested which is partly due to the commencement of the development. 5.2 Future Intersection Performance The future performance of the roundabout without any additional development on the subject site is summarised in Table 5.2 below: Table 5.2 Intersection Performance Summary 2016 — Without Additional Development Approach PM Peak DoS(%) Delay (s) Los Q(m) Eumundi-Noosa Road (Nth) 60.0 6.2 A 44 School 20.1 11.6 B 10 Eumundi Noosa Road (Sth) 46.4 8.2 A 31 Goodchap Street 54.4 16.1 B 37 The intersection would be operating well with minimal delay at these volumes. www.ttmgroup.com.au ra T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected] Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0012 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.