Council archive · source document
07/0012 - Response to Information Request [As Published] · 132007.12
Mixed Medical Office Extension © 2007 - TTM Consulting (SC) Pty Lid Py Ipunwng esoon t 088 Goodchap St Zar \ 33 praydeyg poop Figure 5.1 Forecast Flows 2016 — With Total Development py !punuwngz esoon tiny Traltie Pueting Accuatiea Project No: 23566rep2 The roundabout was analysed in AaSidra for both future traffic conditions. The results are summarised in Table 5.3. Table 5.3 Intersection Performance Summary 2016 — With Total Development Approach PM Peak DoS(%) Delay (s) LOS Q(m) Eumundi-Noosa Road (Nth) 55.6 10.6 B 45 School 23.1 12.7 B 12 Eumundi Noosa Road (Sth) 65.5 6.9 B 49 Goodchap Street 65.7 17.3 B 52 All approaches of the roundabout continue to operate well within capacity and at a high Level of Service. www.ttmgroup.com.au — a” T: (07) 5479 2455 F: (07) 5479 3651 E: [email protected] Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0012 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.