Noosa Council documents
18. The area of land between the front fence and the boundary must be landscaped to screen
the fencing.
Landscaping
19. The development site must be landscaped. The works must be undertaken in accordance
with an Operational Works approval and Noosa Plan 2020 Planning Scheme Policy PSP2
Landscaping for the Coastal Communities area and, in particular, include (but not limited to):
a. a 1.5m wide garden for the full length of the western boundary;
b. screening vegetation for the full length of the western boundary; and
c. vegetation within the front 6 metres of the property.
20. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
21. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
22. Street trees at a maximum of one every 8 metres must be provided along the Park Crescent
frontage, or as determined in conjunction with a Council delegate prior to the issue of an
Operational Works approval.
23. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Community Management Statement
24. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
25. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice.
Environmental health
26. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy PSP9 - Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably screened from
public places and neighbouring properties.
27. A bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer,
via a bucket trap. The drain outlet is to be designed to prevent storm water entry to the
sewerage system and this can be achieved with a nib wall 50mm high and up to 700mm x
700mm wide (max 0.5m²), or alternatively the waste area can be roofed, or any other design
approved by Council.
28. Noise emission from mechanical equipment shall comply with the following requirements:
a. Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A);
10pm to 7am: Maximum background + 3dB(A);
b. Pumps
Page 4 of 12
Document Set ID: 21313305
Version: 5, Version Date: 08/12/2020 Print Date: 8 December 2020, 2:48 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.