Original source · versioned page text
approval
Noosa Council documents
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Site Access and Driveways
43. A sealed access driveway must be provided from Park Crescent to all parking and
manoeuvring areas of the development. The works must be generally in accordance with
drawing number 30206-OW6.2 prepared by SCG Consulting Engineers dated July 2020 and
undertaken in accordance with an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Council’s Standard Drawing RS-051 and any
associated addendum
b. suitable safety measures, including warning signage, to improve driver awareness of
pedestrians and enhance pedestrian safety. Warning signage must be provided near
the exit from the parking area to warn motorists of pedestrian movement along the
frontage street
Car Parking
44. A minimum of nine car parking spaces must be provided and made available and accessible
at all times. The works must be generally in accordance with the approved plans and
undertaken in accordance with an Operational Works approval. The works must include in
particular:
a. One visitor parking space within the total, which is clearly marked for that purpose and
accessible at all times for visitor use
b. Dimensions, crossfalls and gradients in accordance with Australian Standard
AS/NZS2890.1:2004 Parking Facilities
45. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
46. Directional signage must be provided to direct visitors to the car parking spaces provided on
site.
Pedestrian and Bicycle Facilities
47. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. a 1.5 metre wide footpath within the road verge for the entire length of the site’s
frontage to Park Crescent;
b. be generally in accordance with drawings numbered 30206-OW6.3 Revision A and
30206-OW6.4 Revision A prepared by SCG Consulting Engineers dated 23 November
2020.
This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
48. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and be generally in accordance with drawing number 30206-SW1.1 prepared by SCG
Consulting Engineers dated July 2020
Services
49. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
50. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Page 7 of 12
Document Set ID: 21313305
Version: 5, Version Date: 08/12/2020 Print Date: 8 December 2020, 2:48 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.