                              This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                              infrastructure.
                      Site Access and Driveways
               43.    A sealed access driveway must be provided from Park Crescent to all parking and
                      manoeuvring areas of the development. The works must be generally in accordance with
                      drawing number 30206-OW6.2 prepared by SCG Consulting Engineers dated July 2020 and
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      a driveway crossover in accordance with Council’s Standard Drawing RS-051 and any
                              associated addendum
                      b.      suitable safety measures, including warning signage, to improve driver awareness of
                              pedestrians and enhance pedestrian safety. Warning signage must be provided near
                              the exit from the parking area to warn motorists of pedestrian movement along the
                              frontage street
                      Car Parking
               44.    A minimum of nine car parking spaces must be provided and made available and accessible
                      at all times. The works must be generally in accordance with the approved plans and
                      undertaken in accordance with an Operational Works approval. The works must include in
                      particular:
                      a.      One visitor parking space within the total, which is clearly marked for that purpose and
                              accessible at all times for visitor use
                      b.      Dimensions, crossfalls and gradients in accordance with Australian Standard
                              AS/NZS2890.1:2004 Parking Facilities
               45.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
               46.    Directional signage must be provided to direct visitors to the car parking spaces provided on
                      site.
                      Pedestrian and Bicycle Facilities
               47.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      a 1.5 metre wide footpath within the road verge for the entire length of the site’s
                              frontage to Park Crescent;
                      b.      be generally in accordance with drawings numbered 30206-OW6.3 Revision A and
                              30206-OW6.4 Revision A prepared by SCG Consulting Engineers dated 23 November
                              2020.
                      This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Drainage
               48.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works approval
                      and be generally in accordance with drawing number 30206-SW1.1 prepared by SCG
                      Consulting Engineers dated July 2020
                      Services
               49.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               50.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.


                                                                                                        Page 7 of 12
Document Set ID: 21313305
Version: 5, Version Date: 08/12/2020                                                              Print Date: 8 December 2020, 2:48 PM
Log in to download the original file

approval.pdf · 8.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.