                      Damage to infrastructure
               33.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
                      Vacant site
               34.    The site must be left clean and tidy free from debris such as concrete, wire, rubble, brick/s
                      and the like. If the site remains vacant for more than 30 days the lot/s must be turfed or
                      landscaped in accordance with Planning Scheme Policy PSP 2 – Landscaping and to the
                      satisfaction of Council so as to not cause nuisance to the surrounding area.
               35.    All waste materials must be removed from site.
                      Litter, erosion and sediment control
               36.    Litter, erosion and sediment control measures must be installed and maintained until soils
                      are stabilised by turf, vegetation or sealed.
                      Note: it is an offence under the Environmental Protection Act 1994 to deposit or potentially
                      allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
                      system (e.g. roadside gutter).
                      Asbestos
               37.    Removal of building materials containing asbestos must be undertaken by a licensed
                      asbestos removalist.
               38.    Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                      requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                      Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
                      commences. Notification must be made using Form 65: Notification of licensed asbestos
                      removal work, demolition work or emergency demolition.
               39.    All building materials containing asbestos products are wrapped and disposed of in
                      accordance with the Public Health Regulation 2006 and the Environmental Protection
                      Regulation 2008.
                      Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
                      businesses that transport asbestos waste, and landfills that accept this waste.
               40.    All building materials containing asbestos, including asbestos cement sheeting or roofing and
                      lagging are removed from the building prior to demolition/relocation.
                      Plumbing and Drainage
               41.    It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
                      demolition of a building, the existing sanitary drain upstream from the connection point for a
                      service provider’s sewerage system must be sealed water tight. This work is deemed as
                      notifiable Work and must be carried out by a suitably licenced plumber who must submit an
                      As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
                      Construction Commission) within 10 days of completing the work.
               ENGINEERING
                      External Works
               42.    Park Crescent must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      construction of a pedestrian footpath in accordance with the conditions of this Decision
                              Notice
                      b.      removal of the existing property accesses and reinstatement of the kerb, footpath and
                              verge area to match the balance of the site frontage, including the provision of topsoil
                              and turf where the existing verge is grassed



                                                                                                        Page 6 of 12
Document Set ID: 21313305
Version: 5, Version Date: 08/12/2020                                                              Print Date: 8 December 2020, 2:48 PM
Log in to download the original file

approval.pdf · 8.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.