Appendix F Coastal development and Tidal Works · MCU20/0090

of 8

Text shows just the words. Original shows the document exactly as it was published.

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




Appendix F: State Code 8: Coastal development and tidal works
Table 8.2.1: All development
  Performance outcomes                                               Acceptable outcomes                               Response
  Development in the erosion prone area
  PO1 Development does not occur in the erosion prone area           No acceptable outcome is prescribed.              Complies - extension relates to existing marine craft
  unless the development:                                                                                              hire business located on the site and is coastal
      1. is one of the following types of development:                                                                 dependant.
               a. coastal-dependent development; or
               b. temporary, readily relocatable or able to be
                   abandoned; or
               c. essential community infrastructure; or
               d. redevelopment of an existing permanent
                   building or structure that cannot be
                   relocated or abandoned; and
      2. cannot feasibly be located elsewhere.
  PO2 Development other than coastal protection work:                No acceptable outcome is prescribed.              Complies – extension is located on existing jetty deck
      1.   avoids impacting on coastal processes; and                                                                  and does not impact on coastal processes. No
      2.   ensures that the protective function of landforms                                                           vegetation or landform altered by proposed works.
           and vegetation is maintained.

  Note: In considering reconfiguring a lot applications, the state
  may require land in the erosion prone area to be surrendered
  to the State for coastal management purposes under the
  Coastal Protection and Management Act 1995. Where the
  planning chief executive receives a copy of a land surrender
                                                                                                                                              Page 1 of 8
Full text of the other 7 pages

Page 2

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                                Acceptable outcomes                              Response
  requirement or proposed land surrender notice under the
  Coastal Protection and Management Act 1995, this must be
  considered in assessing the application.
  PO3 Development is located, designed and constructed to             No acceptable outcome is prescribed.             Complies – extension located on existing jetty and
  minimise the impacts from coastal erosion by:                                                                        incorporated into existing structures on site. Part of the
      1. locating the development as far landward as                                                                   extension is located in proximity to the foreshore and
          practicable; or                                                                                              both areas do not impact on coastal processes as they
      2. where it is demonstrated that 1 is not feasible,                                                              are located on the existing jetty.
          mitigate or otherwise accommodate the risks posed
          by coastal erosion.
  PO4 Development does not significantly increase the risk or         No acceptable outcome is prescribed.             Complies – the extension is to be used to house
  impacts to people and property from coastal erosion.                                                                 equipment and administration areas currently existing
                                                                                                                       within the existing building and lease area. The
                                                                                                                       extension
  PO5 Development other than coastal protection work avoids           No acceptable outcome is prescribed.             Complies – the extension is located on the existing jetty
  directly or indirectly increasing the severity of coastal erosion                                                    and will not impact on coastal erosion.
  either on or off the site.
  PO6 In areas where a coastal building line is present,              No acceptable outcome is prescribed.             Not applicable – no coastal building line
  building work is located landward of the coastal building line
  unless coastal protection work has been constructed to
  protect the development.
  Artificial waterways
  PO7 Development of artificial waterways, canals and dry-            No acceptable outcome is prescribed.             Not applicable – not an artificial waterway
  land marinas minimises impacts on coastal resources by:
      1. maintaining the tidal prism volume of the natural
           waterway to which it is connected
      2. demonstrating a whole-of-life strategy for the
           disposal of dredged material.
  Coastal protection work

                                                                                                                                               Page 2 of 8

Page 3

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                            Acceptable outcomes                                  Response
  PO8 Works for beach nourishment minimise adverse                No acceptable outcome is prescribed.                 Not applicable - not beach nourishment works
  impacts on coastal processes and avoid any increase in the
  severity of erosion on adjacent land by:
      1. sourcing sand from an area that does not adversely
           impact on the active beach system
      2. ensuring imported sand is compatible with natural
           beach sediments and coastal processes of the
           receiving beach.
  PO9 Erosion control structures are only constructed where       No acceptable outcome is prescribed.                 Not applicable – no erosion control structures
  there is an imminent threat to buildings or infrastructure of                                                        proposed. Works located on existing jetty.
  value, and there is no feasible option for either:
      1. beach nourishment; or
      2. relocation or abandonment of structures.

  Statutory Note: The monetary value of buildings or
  infrastructure should be more than the cost of associated
  erosion control structures.
  PO10 Erosion control structures minimise interference with      No acceptable outcome is prescribed.                 Not applicable – no erosion control structures
  coastal processes, or any increase to the severity of erosion                                                        proposed. Works located on existing jetty.
  on adjacent land by:
      1. locating the erosion control structure as far
           landward as practicable and directly adjacent to the
           structure it is intended to protect
      2. where required and feasible, importing sand to the
           site to mitigate any increase in the severity of
           erosion
      3. the design of the structure.
  Water quality



                                                                                                                                              Page 3 of 8

Page 4

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                           Acceptable outcomes                                   Response
  PO11 Development:                                              No acceptable outcome is prescribed.                  Complies – extension will not change the existing water
      1.   maintains or enhances environmental values of                                                               quality of the receiving waters.
           receiving waters
       2. achieves the water quality objectives of Queensland
           waters
       3. avoids the release of prescribed water
           contaminants to tidal waters.
  Note: See Environmental Protection (Water) Policy 2009 for
  the relevant water quality objectives.
  Category C and R areas of vegetation
  PO12 Development:                                              No acceptable outcome is prescribed.                  Complies – no vegetation affected as all works located
      1.   avoids impacts on category C areas of vegetation                                                            on existing jetty.
           and category R areas of vegetation; or
      2.   minimises and mitigates impacts on category C
           areas of vegetation and category R areas of
           vegetation after demonstrating avoidance is not
           reasonably possible.
  Public use of and access to state coastal land
  PO13 Development maintains or enhances public use of and       No acceptable outcome is prescribed.                  Complies – extension does not alter public use area on
  access to and along state coastal land (except where this is                                                         the foreshore as all works are located within the lease
  contrary to the protection of coastal resources or public                                                            area and on the existing jetty.
  safety).
  PO14 Private marine development ensures that works:            No acceptable outcome is prescribed.                  Complies – extension located within lease area and on
      1.   are used for marine access purposes only                                                                    existing jetty and does not interfere with waterways or
      2.   minimise the use of state coastal land                                                                      adjoining properties.
      3.   do not interfere with access between navigable
           waterways and adjacent properties.



                                                                                                                                              Page 4 of 8

Page 5

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                            Acceptable outcomes                                  Response
  PO15 Development ensures erosion control structures are         No acceptable outcome is prescribed.                 Not applicable – no erosion control structures
  located within the premises they are intended to protect                                                             proposed
  unless there is no feasible alternative.
  Matters of state environmental significance
  PO16 Development:                                               No acceptable outcome is prescribed.                 Complies – no mapped matters of state significance.
      1.    avoids impacts on matters of state environmental
            significance; or
       2. minimises and mitigates impacts on matters of state
            environmental significance after demonstrating
            avoidance is not reasonably possible; and
       3. provides an offset if, after demonstrating all
            reasonable avoidance, minimisation and mitigation
            measures are undertaken, the development results
            in an acceptable significant residual impact on a
            matter of state environmental significance.
  Statutory note: For Brisbane core port land, an offset may
  only be applied to development on land identified as E1
  Conservation/Buffer, E2 Open Space or Buffer/Investigation
  in the Brisbane Port LUP precinct plan. For the Brisbane Port
  LUP, see www.portbris.com.au.
  Note: Guidance for determining if the development will have
  a significant residual impact on the matter of state
  environmental significance is provided in the Significant
  Residual Impact Guideline, Department of State
  Development, Infrastructure and Planning, 2014. Where the
  significant residual impact is considered an acceptable
  impact on the matter of state environmental significance and
  an offset is considered appropriate, the offset should be
  delivered in accordance with the Environmental Offsets Act
  2004.



                                                                                                                                              Page 5 of 8

Page 6

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                               Acceptable outcomes                               Response




Table 8.2.2: All operational work
  Performance outcomes                                               Acceptable outcomes                               Response
  Private marine development
  PO17 Private marine development does not require the               No acceptable outcome is prescribed.              Not applicable   - extension is for an existing
  construction of coastal protection work, shoreline or                                                                commercial use and is not private marine work
  riverbank hardening or dredging for marine access purposes.
  Disposal of solid waste or dredged material from artificial waterways
  PO18 Solid waste from land and dredged material from               No acceptable outcome is prescribed.              Not applicable – no dredging proposed
  artificial waterways is not disposed of in tidal water unless it
  is for beneficial reuse.
  Disposal of dredged material other than from artificial waterways
  PO19 Dredged material is returned to tidal water where             No acceptable outcome is prescribed.              Not applicable – no dredging proposed.
  this is needed to maintain coastal processes and
  sediment volume.
  PO20 Where it is not needed to maintain coastal                    No acceptable outcome is prescribed.              Not applicable – no dredging proposed
  processes and sediment volume, the quantity of
  dredged material disposed to tidal water is minimised
  through beneficial reuse or disposal on land.
  All dredging and any disposal of dredged material in tidal water
  PO21 All dredging and any disposal of dredged                      No acceptable outcome is prescribed.              Not applicable – no dredging proposed
  material in tidal water is:
                                                                                                                                              Page 6 of 8

Page 7

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                       Acceptable outcomes                                       Response
      1. demonstrated to be safe with regard to
         protection of the marine environment and by
         meeting the National Assessment Guidelines
         for   Dredging     2009,    Department   of
         Environment and Energy, 2009, or later
         version; and
      2. supported by a monitoring and management
         plan that protects the marine environment and
         that complies with the National Assessment
         Guidelines for Dredging 2009, Department of
         Environment and Energy, 2009, or later
         version.

  Reclamation
  PO22 Development does not involve reclamation of           No acceptable outcome is prescribed.                      Not applicable – no reclamation proposed
  land below tidal water, other than for the purposes of:
      1. coastal-dependent    development, public
         marine      development    or  community
         infrastructure; or
      2. strategic ports, priority ports, boat harbours or
         strategic airports and aviation facilities, in
         accordance with a statutory land use plan or
         master plan, where there is a demonstrated
         net benefit for the state or region and no
         feasible alternative exists; or


                                                                                                                                              Page 7 of 8

Page 8

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                        Acceptable outcomes                                          Response
      3. coastal protection work or work necessary to
         protect coastal resources or coastal
         processes.

Table 8.2.3: Operational work which is not assessed by local government
  Performance outcomes                                        Acceptable outcomes                                          Response
  PO23 Works are located and designed such that they          AO23.1 Tidal work is designed and located in accordance      Complies – Extension located on top of existing
  continue to operate safely during and following a defined   with the Guideline: Building and engineering standards for   approved jetty. All buildings will comply with relevant
  storm tide event.                                           tidal works, Department of Environment and Heritage          standards.
                                                              Protection, 2017.




                                                                                                                                                 Page 8 of 8

Used in these records

About this file

File size
167 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix F Coastal development and Tidal Works.pdf · 167 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.