Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Appendix F Coastal development and Tidal Works · MCU20/0090

of 8

Text shows just the words. Original shows the document exactly as it was published.

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                                Acceptable outcomes                              Response
  requirement or proposed land surrender notice under the
  Coastal Protection and Management Act 1995, this must be
  considered in assessing the application.
  PO3 Development is located, designed and constructed to             No acceptable outcome is prescribed.             Complies – extension located on existing jetty and
  minimise the impacts from coastal erosion by:                                                                        incorporated into existing structures on site. Part of the
      1. locating the development as far landward as                                                                   extension is located in proximity to the foreshore and
          practicable; or                                                                                              both areas do not impact on coastal processes as they
      2. where it is demonstrated that 1 is not feasible,                                                              are located on the existing jetty.
          mitigate or otherwise accommodate the risks posed
          by coastal erosion.
  PO4 Development does not significantly increase the risk or         No acceptable outcome is prescribed.             Complies – the extension is to be used to house
  impacts to people and property from coastal erosion.                                                                 equipment and administration areas currently existing
                                                                                                                       within the existing building and lease area. The
                                                                                                                       extension
  PO5 Development other than coastal protection work avoids           No acceptable outcome is prescribed.             Complies – the extension is located on the existing jetty
  directly or indirectly increasing the severity of coastal erosion                                                    and will not impact on coastal erosion.
  either on or off the site.
  PO6 In areas where a coastal building line is present,              No acceptable outcome is prescribed.             Not applicable – no coastal building line
  building work is located landward of the coastal building line
  unless coastal protection work has been constructed to
  protect the development.
  Artificial waterways
  PO7 Development of artificial waterways, canals and dry-            No acceptable outcome is prescribed.             Not applicable – not an artificial waterway
  land marinas minimises impacts on coastal resources by:
      1. maintaining the tidal prism volume of the natural
           waterway to which it is connected
      2. demonstrating a whole-of-life strategy for the
           disposal of dredged material.
  Coastal protection work

                                                                                                                                               Page 2 of 8

Used in these records

About this file

File size
167 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix F Coastal development and Tidal Works.pdf · 167 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.