Skip to the record
Beware of cheap imitations.

Council archive · source document

Appendix F Coastal development and Tidal Works · MCU20/0090

of 8

Text shows just the words. Original shows the document exactly as it was published.

Development Permit for Material Change of Use for an Office Ancillary to a Landing (extension to an existing jetty building) at 256 Gympie Terrace Noosaville described
as Lot 158 on SP1460413




  Performance outcomes                                            Acceptable outcomes                                  Response
  PO8 Works for beach nourishment minimise adverse                No acceptable outcome is prescribed.                 Not applicable - not beach nourishment works
  impacts on coastal processes and avoid any increase in the
  severity of erosion on adjacent land by:
      1. sourcing sand from an area that does not adversely
           impact on the active beach system
      2. ensuring imported sand is compatible with natural
           beach sediments and coastal processes of the
           receiving beach.
  PO9 Erosion control structures are only constructed where       No acceptable outcome is prescribed.                 Not applicable – no erosion control structures
  there is an imminent threat to buildings or infrastructure of                                                        proposed. Works located on existing jetty.
  value, and there is no feasible option for either:
      1. beach nourishment; or
      2. relocation or abandonment of structures.

  Statutory Note: The monetary value of buildings or
  infrastructure should be more than the cost of associated
  erosion control structures.
  PO10 Erosion control structures minimise interference with      No acceptable outcome is prescribed.                 Not applicable – no erosion control structures
  coastal processes, or any increase to the severity of erosion                                                        proposed. Works located on existing jetty.
  on adjacent land by:
      1. locating the erosion control structure as far
           landward as practicable and directly adjacent to the
           structure it is intended to protect
      2. where required and feasible, importing sand to the
           site to mitigate any increase in the severity of
           erosion
      3. the design of the structure.
  Water quality



                                                                                                                                              Page 3 of 8

Used in these records

About this file

File size
167 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix F Coastal development and Tidal Works.pdf · 167 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.