PLANNING REPORT 25 Pavillion 1 into 10
4.0 Pre-lodgment lodgment
On 17 June 2021 the applicant met with Council Officers for a pre-lodgment meeting. As a result of
that meeting, the applicant has taken on board Council’s feedback and changed the proposed layout
to reduce the lot yield by 1 lot. The following Table provides Council’s feedback and the development
response and reduced the development yield.
Table 1 - Pre-lodgement response
Planning Officer feedback Development response
The minimum lot size in Low density residential All lots are proposed connected to reticulated
zones in this location is 1000m² if connected to sewer and water. Each lot is greater than
sewerage 1,000m².
The proposed Rural zoned lot is heavily Each lot is level and can readily fit a dwelling
constrained and will be required to include a house and associated structures. Lot sizes
building envelope marked on the proposal plan range between 1,000m² and 1,069m² which is
that demonstrates that there is an area consistent (and code compliant) with the
sufficient to accommodate the intended character of historic Pomona lots in the
purpose of the lot, that is not subject to the surrounding area.
constraint or valuable feature or that The development has been amended so that
appropriately responds to the constraint or the lots step down with the slope of the land
valuable feature. It is recommended the lot be without the need for any significant retaining
connected to water and sewer, however should walls.
the lot not be serviced, information will be All lots are fully serviced including Lot 10. Lot 10
required regarding onsite effluent disposal the Rural zoned lot is provided with a large
designated building envelope outside the flood
affected area of the land.
No onsite effluent disposal is required.
It is understood retaining is proposed in order to The lots step down with the slope and include
create flat lots. Noosa Plan 2020 requires that some retaining between 7, 8, 9 and 1, 2, 3.
development does not result in significant Considering the 30m+ width of the lots, there is
modification to natural landform or landscape sufficient space between the building pads to
features. Any application should address provide for landscaping within the setbacks to
impacts on natural landform, landscape allow for vegetated screening of the retaining
features and amenity (overshadowing, privacy walls. The wide lots will also not result in
etc). overshadowing or result in privacy concerns.
The lots step down the sloping site and is not
readily visible from Pavilion St consistent with
the relevant outcomes.
The application material will need to address Two of the easements are proposed to be
the existing north/south easement that is extinguished with the existing sewer easement
located on the lot. running along the western boundary of lots 1 &
9 and the southern boundary of lot 1. These lots
still have a large developable area exclusive of
the easement.
Engineering Officer feedback Development response
Pavilion Street intersection – suitable grades The applicant has taken on board the feedback
and transitions, filling, drainage etc. and provided engineering drawings prepared by
It is noted that the sight lines to the north may an RPEQ that demonstrates the Pavilion Street
be impacted by the property boundary of the intersection complies with all relevant standard
adjoining property. A truncation of the adjoining and policies.
property may be required. Sight lines comply with the relevant standards
without the need to truncate the northern lot.
An engineering report is provided as part of the
submitted documentation.
Page 6 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.