PLANNING REPORT 25 Pavillion 1 into 10

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Internal road in accordance with the Noosa Plan      Engineering drawings prepared by an RPEQ
2020                                                 that demonstrates the Pavilion Street
                                                     intersection complies with all relevant standard
                                                     and policies are provided.
A cul-de-sac or other suitable turning area at the   The applicant has made a significant change
western end of the new road. It is noted that a      because of this feedback and reduced the lot
“Y” or “T” may be a suitable alternative and         yield and provided for a future access to the
provide access for the subject subdivision and       northern adjoining lot. As part of amendment, a
provision of a road reserve for any potential        ‘T’ section has been provided suitable for waste
future development of the properties to the          collection etc.
north.
A site-specific Stormwater Management Plan           The applicant has taken on board Council’s
that addresses stormwater quantity and quality.      feedback and reduced the lot yield, so the
The SWMP must also include measures to               stormwater infrastructure is above the 1% AEP.
convey runoff from external catchments. It is        A SWMP has been provided as part of the
noted that the concept plan submitted for the        submitted documentation.
meeting indicated a detention basin below the
1% AEP flood level. Any necessary
detention/treatment basin must be located
above the 1% AEP flood plain.
Any development of the site must not impact on       Lot yield has been reduced to ensure there are
the ability of the property to convey flood waters   no offsite flood impacts.
for up to and including the 1%AEP event and
must not create any adverse flooding impacts
on upstream and downstream properties
Any application must include sufficient detail to    Preliminary engineering drawings are provided
demonstrate that suitable connections can be         and verbal Unitywater approval to ensure the
provided to urban services (sewer, water,            lots west of the sewer main can utilise a low
electricity and telecommunications)                  pressure main. Noting that Unitywater’s forward
                                                     planning allows for 18 dwellings accommodated
                                                     on this site. The Rural zoned lot is also
                                                     proposed to be fully serviced.




                                                                                           Page 7 of 12
Log in to download the original file

PLANNING REPORT 25 Pavillion 1 into 10.pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.