Council archive · source document
AS PUBLISHED Negotiated Report (Representations made) MCU23 0094 · MCU23/0094
33132-SW1.5 - Bio Retention Layout Plan N/A
Show the subsoil drainage layout in plan view, clarify whether the
Amendments
150dia and 225dia collection pipes are slotted, and adjust the
drainage and transition layers as necessary to ensure that the
drainage layer achieves at least 50mm of cover over the largest
slotted pipe
Plan No. Rev. Plan/Document Name Date
33132-SW1.2 C Stormwater Details 5.12.2023
33132-SW1.5 - Bio Retention Layout Plan N/A
Update the underground detention tanks to comply with
Amendments
AS3500.3:2021 Section 7.10.2 and include minimum slope on base,
sump and access ladder, screen over orifice to prevent blockage.
Amend the storage volumes to match those stated on drawing
33132-SW1.1C
Applicant’s Representation
The applicant requests that the preliminary approved be converted to a Development Permit
following the submission of amended plans as detailed below:
Please find attached the updated landscaping and engineering drawings addressing Council’s plan
requiring amendments including:
- Bioretention layout plan updated - Detention tank details - Landscaping adjacent to Lot 2
includes syzigium and callistemon
- Headland Dr landscaping basin landscaping extended into road reserve
- Landscaping species updated A full Development Permit should be issued, and standard
conditions included.
Assessment of Representation
Council’s Senior Development Engineer and External Consultant confirm that the amended
documentation addresses the conditions and notes:
Plan SW1.5 has been amended. Underdrains joining into the collector pipe amended to show
45-degree joins.
An updated plan has been provided. The total volumes on drawing SW1.3 now match those
on SW1.1. Screens are shown over orifices. Access openings shown in the plans and fall is
shown on the base of the tanks.
A note has also been added to the drawings stating that the tank design is concept only.
A total storage volume of 32kL is shown over 3 tanks, which matches the volumes in the
SCG SWMP dated 12/03/2024.
A condition should be applied requiring the final tank supplier/manufacturer to certify
compliance with AS3500.3:2021 Section 7.10.2.
It is recommended that a Development Permit for Operational Works – Drainage Work,
Stormwater now be included.
Council’s Senior Environmental Officer has also reviewed the revised landscaping plans provided
and agrees with the changes and recommends that a Development Permit for Operational Works
– Landscaping is to be issued.
Page 12 of 25
Document Set ID: 22926712
Version: 8, Version Date: 13/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
AS PUBLISHED Negotiated Report (Representations made) MCU23 0094.pdfRelated documentApplication case desk ↗
About this file
- File size
- 932 KB (small file)
- File type
No other editions are linked here.