AS PUBLISHED Negotiated Report (Representations made) MCU23 0094 · MCU23/0094
g. Replacement of dead or poorly performing plants.
h. Repair and replacements of damaged landscape infrastructure (furniture and fixtures).
Off Maintenance
51. Prior to requesting an Off Maintenance inspection the following must be provided:
a. Written request of bond release.
52. Off Maintenance Inspection must be requested:
a. By contacting Council.*
b. Only after lodgement of a completed Landscape Checklist and all other required
certification and documentation.
c. Only after all works are confirmed in good order including:
i. Remulching, fertilising and aeration of garden areas.
ii. Replacement of plant material.
iii. Removal of plant material impeding regulation sightlines.
*(Refer to Advisory Note)
Detention Tanks
53. Underground detention tanks are to be provided with the detention sizes and volumes and
outlet configurations as shown in the concept on drawing 33132-SW1.3 Rev E by SCG
Consulting. Certification is to be provided by the tank manufacturer prior to installation that
the tanks incorporate all features required by AS3500.3:2021 Section 7.10.2.
Bioretention Basins – Construction
54. During construction and establishment of the bioretention devices, the supervising RPEQ
must ensure that the device was constructed in accordance with the document Construction
and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
Design, 2009) and that the forms contained in section 3.15 including the associated
supporting information and data are completed. These forms and certification from the RPEQ
that the device has been constructed in accordance with the Construction and Establishment
Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009), all
conditions of approval, and the approved engineering drawings must be submitted to Council
prior to commencement of use.
55. A construction hold point with a council delegate shall be established once the bioretention
device underdrainage pipe work is installed. At the time of inspection, a sample of the
drainage layer, transition layer, and filtration media materials must be stockpiled on-site.
Laboratory results must be provided for the filter media which demonstrate that the media
complies with the specifications contained in the latest version of the “Guidelines for Soil
Filter Media in Bioretention Systems” (produced by the Facility for Advancing Water
Biofiltration) and that the minimum hydraulic conductivity specified on the approved
engineering plans will be achieved. In addition laboratory results must be provided
demonstrating that the transition layer and drainage layer meet the following bridging criteria:
(a) D15 (drainage layer) ≤ 5 × D85 (transition layer)
(b) D15 (transition layer) ≤ 5 × D85 (filter media)
The drainage layer, transition layer, and filtration media materials shall not be installed until
the catchment draining to the bioretention device has 70% groundcover as determined by
Council’s delegate.
56. Prior to issuing of a final compliance certificate, council must receive evidence that the results
for the in-situ hydraulic conductivity testing conducted in accordance with FAWB PRACTICE
NOTE 1: In Situ Measurement of Hydraulic Conductivity Belinda Hatt, Sebastien Le
Coustumer April 2008 for the bioretention filter media achieve the design criteria.
Page 19 of 25
Document Set ID: 22926712
Version: 8, Version Date: 13/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
AS PUBLISHED Negotiated Report (Representations made) MCU23 0094.pdfRelated documentApplication case desk ↗
About this file
- File size
- 932 KB (small file)
- File type
No other editions are linked here.