Original source · versioned page text
2020-08-17 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 17 AUGUST 2020
Plan No. Rev Plan/Document Name Date
60669 E Plan of Development (Proposed Community Title 31 July 2020
Subdivision of Lot 1 on RP36729) – Aerial by
Murray & Associates
17623-SK100 F Preliminary Plan of Development (Sheet 1 of 2) 6 August 2020
by TOD
Figure 4 Bushfire Mitigation Plan by Land and 31 July 2019
Environment Consultants (LEC)
To be revised pursuant to condition 26
Flood Emergency Management Plan by Water 27 February 2020
Technology
Bushfire Management Plan to be approved
pursuant to condition 26
Vegetation Management Plan to be approved
pursuant to condition 39
Draft Covenant 22 June 2020
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Currency Period
5. The Currency Period for this development approval lapses if all conditions have not
been complied with, and the plan of survey lodged with Council for endorsement by 30
August 2024, unless an application to extend the currency period is approved by
Council.
Plan of Development
6. All future dwellings on proposed Lots 1, 2 & 4 must be sited and constructed in
accordance with the approved building envelopes and dwelling controls as shown on
the Approved Plans. A copy of the approved Plan of Development and other
management plans (referred to in this development approval) and maximum building
height requirements must be included in any contract of sale for the proposed lots,
together with a clause which requires all dwellings to be constructed in accordance
with the development approval.
7. The Applicant must prepare a metes and bounds building envelopes plan indicating
building pad areas for the proposed lots. The areas must be in accordance with Plan
of Development, Drawing No. 17623-SK100, Revision F prepared by TOD Engineers
and Project Managers, dated 6 August 2020. The plan must be submitted in both hard
copy and digital format (dwg) on GDA 94 zone 56 coordinates. The Applicant must
submit the plan to Council for approval prior to the endorsement of the Plan of Survey.
8. Dwellings and outbuildings are to be located within the building envelopes provided for
the proposed lots consistent with Plan of Development, Drawing No. 7623-SK100,
Revision F prepared by TOD Engineers and Project Managers, dated 6 August 2020.
9. Dwellings must not exceed a maximum building height of 9 metres measured from the
natural ground level as defined by the Noosa Plan 2006.
10. The Body Corporate is responsible for maintaining the access to the proposed lots in
accordance with the Plan of Development, Drawing No. 7623-SK100, Revision F
Page 7 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.