GENERAL COMMITTEE MEETING                                                         17 AUGUST 2020

    17.   Prior to sealing of the plan of survey, the Applicant is to install a flood height gauge and
          siren, between 0.5m and 0.75m AHD, at a suitable low point on the common property
          to indicate depth of flooding to residents and occupiers of the site as required by the
          FEMP. The gauge and siren will be installed to Bureau of Meteorology (BOM)
          specifications. This is to allow for site specific flood monitoring in conjunction with
          reviewing the BOM weather warnings consistent with the FEMP, in particular Table 3-
          2.
    18.   The Body Corporate is responsible for the ongoing operation, management,
          maintenance (which includes replacement) and testing of the flood height gauge and
          siren (on an annual basis) and will enter into a contract with a suitable service
          contractor to maintain the flood height gauge and siren to BOM specifications. The
          Body Corporate is responsible for ensuring such maintenance contract is in force at all
          times.
    19.   The Body Corporate is responsible for advising all owners of the proposed lots of the
          requirement for a service contract and of funding arrangements associated with the
          ongoing operation, management and maintenance of the flood height gauge and siren
          required to be constructed within the common property. The Body Corporate is
          responsible for ensuring there are adequate funds at all times to operate, manage and
          maintain the flood height gauge and siren.
    20.   All dwellings must be constructed in accordance with the minimum floor level
          requirements, with the minimum habitable floor level above the probable maximum
          flood level of 3.43m (AHD).
    21.   The Body Corporate is responsible for the overall communication, implementation, and
          periodic update of the FEMP. A regular review of the FEMP shall be undertaken (at
          least once every two years), which is regarded as an essential part of the risk
          awareness-raising process.
    22.   The Body Corporate is responsible for ensuring that there is an active procedure for
          notifying the owners and occupiers of the proposed lots of the potential for a flood and
          a heavy rainfall event, and developing, maintaining and implementing emergency flood
          procedures, in accordance with the FEMP.
    23.   The Body Corporate is responsible for advising the owners and occupiers of the
          proposed lots that they are responsible for ensuring they have enough food, water, and
          medical supplies to shelter in place for a minimum of three days.
    External Road Works
    24.   Prior to sealing of the plan of survey, the Applicant is to upgrade part of Lake Weyba
          Drive fronting the proposed development and extending to the north as shown on the
          Plan of Development, Drawing No. 7623-SK100, Revision F prepared by TOD
          Engineers and Project Managers, dated 6 August 2020.
    25.   The new roadwork will achieve a minimum reduced level of RL 1.5m (AHD) when
          travelling to the north for approximately 23.2m, starting from the southern edge of the
          access driveway, as shown on the Plan of Development, Drawing No. 7623-SK100,
          Revision F prepared by TOD Engineers and Project Managers, dated 6 August 2020.
    26.   The roadwork will transition over a distance of approximately 11.3m to match the
          existing pavement to the south of the access driveway, as shown on the Plan of
          Development, Drawing No. 7623-SK100, Revision F prepared by TOD Engineers and
          Project Managers, dated 6 August 2020.
                                                                                       Page 9 of 12
Log in to download the original file

2020-08-17 General Committee Meeting Notes(PDF, 606KB).pdf · 621 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.