2020-08-17 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 17 AUGUST 2020
17. Prior to sealing of the plan of survey, the Applicant is to install a flood height gauge and
siren, between 0.5m and 0.75m AHD, at a suitable low point on the common property
to indicate depth of flooding to residents and occupiers of the site as required by the
FEMP. The gauge and siren will be installed to Bureau of Meteorology (BOM)
specifications. This is to allow for site specific flood monitoring in conjunction with
reviewing the BOM weather warnings consistent with the FEMP, in particular Table 3-
2.
18. The Body Corporate is responsible for the ongoing operation, management,
maintenance (which includes replacement) and testing of the flood height gauge and
siren (on an annual basis) and will enter into a contract with a suitable service
contractor to maintain the flood height gauge and siren to BOM specifications. The
Body Corporate is responsible for ensuring such maintenance contract is in force at all
times.
19. The Body Corporate is responsible for advising all owners of the proposed lots of the
requirement for a service contract and of funding arrangements associated with the
ongoing operation, management and maintenance of the flood height gauge and siren
required to be constructed within the common property. The Body Corporate is
responsible for ensuring there are adequate funds at all times to operate, manage and
maintain the flood height gauge and siren.
20. All dwellings must be constructed in accordance with the minimum floor level
requirements, with the minimum habitable floor level above the probable maximum
flood level of 3.43m (AHD).
21. The Body Corporate is responsible for the overall communication, implementation, and
periodic update of the FEMP. A regular review of the FEMP shall be undertaken (at
least once every two years), which is regarded as an essential part of the risk
awareness-raising process.
22. The Body Corporate is responsible for ensuring that there is an active procedure for
notifying the owners and occupiers of the proposed lots of the potential for a flood and
a heavy rainfall event, and developing, maintaining and implementing emergency flood
procedures, in accordance with the FEMP.
23. The Body Corporate is responsible for advising the owners and occupiers of the
proposed lots that they are responsible for ensuring they have enough food, water, and
medical supplies to shelter in place for a minimum of three days.
External Road Works
24. Prior to sealing of the plan of survey, the Applicant is to upgrade part of Lake Weyba
Drive fronting the proposed development and extending to the north as shown on the
Plan of Development, Drawing No. 7623-SK100, Revision F prepared by TOD
Engineers and Project Managers, dated 6 August 2020.
25. The new roadwork will achieve a minimum reduced level of RL 1.5m (AHD) when
travelling to the north for approximately 23.2m, starting from the southern edge of the
access driveway, as shown on the Plan of Development, Drawing No. 7623-SK100,
Revision F prepared by TOD Engineers and Project Managers, dated 6 August 2020.
26. The roadwork will transition over a distance of approximately 11.3m to match the
existing pavement to the south of the access driveway, as shown on the Plan of
Development, Drawing No. 7623-SK100, Revision F prepared by TOD Engineers and
Project Managers, dated 6 August 2020.
Page 9 of 12