Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment 9- Amended Bushfire Assessment Report MCU12/0208

of 77

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Noosa on Weyba
Bushfire Assessment Report



2.       Where a perimeter road is not proposed, 6m wide fire maintenance trails will be established between
         proposed residential lots and adjacent areas of potentially hazardous vegetation.           The fire
         maintenance trails will have access points at either end, a vehicle passing bay every 200m and a
         vehicle turnaround every 400m.
3.       Maintenance of an existing network of property maintenance trails through areas of retained native
         vegetation that will be used to facilitate management of that vegetation, by the Noosa on Weyba Body
         Corporate, including management of bushfire for both ecological and property protection purposes.
The proposed network of formed roadways, perimeter and internal fire maintenance trails is illustrated in
Figure 4.
In addition to the network of roadways and firetails, vegetation management will be required to maintain
effective firebreaks between proposed building sites and areas of hazardous vegetation. In this respect the
vegetation within some sections of the proposed Open Space reserves that currently support
grazed/maintained pasture with scattered trees (e.g. Vegetation Type 8) will be maintained in this condition
to preserve habitat for native fauna such as the eastern grey kangaroo and to provide opportunities for public
recreation. Such areas, the locations of which are illustrated in Concept Bushfire Management Plan
presented in Figure 4, will form part of the fire break between proposed urban development areas and
adjacent areas of hazardous vegetation that are to be retained or established as part of the Noosa on Weyba
environmental offsets program.

4.5                Access/Egress Arrangements
The ability of both landowners and fire fighters to access all areas of a property can be a vital factor in
determining whether a fire can be fought successfully or not. Secure access also allows for safe
performance of management actions and safe exit should evacuation be required.
In recognition of this the SPP 1/03 Guideline states that, for development that will result in multiple buildings
or lots, roads are designed and constructed in accordance with applicable local government and State
government standards and:
            a)          have a maximum gradient of 12.5%; and
            b)          exclude cul-de-sac, except where a perimeter road isolates the development from hazardous
                        vegetation or the cul-de-sac are provided with an alternative access linking the cul-de-sac to
                        other through roads.
As illustrated in Figure 4, the Noosa on Weyba Concept Master Plan has an internal road system that would
have maximum gradients less than 12.5% and makes provision for a combination of perimeter roads and fire
maintenance trails located between residential lots and potentially hazardous vegetation.
The Noosa on Weyba proposal also involves the upgrading of the external road network which will also
improve the capacity to access/egress the locality in the event of a bushfire. Specifically the Noosa on
Weyba proposal involves the establishment of a new round-about off Walter Hay Drive and proposed
upgrading of Tidswell Road, which will substantially improve the capacity to deploy fire management
equipment and personnel in the event of a bushfire.
The proposed road network servicing the Noosa on Weyba development provides multiple avenues of
entry/exit from all of the proposed urban development areas to facilitate the deployment of fire fighting
resources and/or the evacuation of residents.




Northbrook Corporation Pty Ltd                            Version 2                                     11 October 2013
Bushfire Assessment Report v2.docx                  Commercial in Confidence                                   Page 14

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 9- Amended Bushfire Assessment Report MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.