Council archive · source document
Attachment 9- Amended Bushfire Assessment Report MCU12/0208
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa on Weyba
Bushfire Assessment Report
Based on the previously presented information, an assessment of the levels of compliance that the proposed
Noosa on Weyba development achieves with the requirements of the Maroochy Plan Code for Development
in Bushfire Hazard Areas is presented in Table 5-4.
Table 5-4 Maroochy Plan Code for Development in Bushfire Hazard Areas compliance assessment
Performance Criteria Acceptable Measures Noosa on Weyba Response
Element 1: Fire Management Plan (for Assessable Development only)
P1 The fire mitigation methods A1 The development complies with a Complies. This document has been
used at the site must be Bushfire Management Plan prepared in prepared in accordance with Planning
adequate for the potential accordance with Planning Scheme Policy Scheme Policy No. 13 - Preparation of
bushfire hazard rating of the No. 13 - Preparation of a Bushfire a Bushfire Management Plan.
2
individual site, having regard to: Management Plan.
(a) vegetation type; It is recognised that some more
(b) slope; detailed Bushfire Management Plans
(c) aspect; will be required to support
(d) on-site and off-site fire development applications for specific
hazard implications of the precincts. This approach is consistent
development; with SPP 1/03 Appendix 8 –
(e) bushfire history; Undertaking a Bushfire Management
(f) conservation values of the Plan which recognises that “If the
site; and application must be followed by
(g) ongoing maintenance. another application before works can
commence (e.g. a Material Change of
Use application that must be followed
by a Reconfiguration of a Lot
application), then matters of detail
could be dealt with at the later
application stage.”
Element 2: Lot Layout, Land Use and Access (for Assessable and Self-Assessable Development)
P1 The lot layout of new A1 The proposal demonstrates building Complies – As detailed in Section 4,
developments must be designed envelopes are designed to have a setback the Noosa on Weyba Concept Master
to mitigate any potential bushfire of: Plan make provision for appropriate
hazard and provide safe sites. • 1.5 times the height of the predominant building setbacks to areas of
tree canopy or 10m, whichever is greater; potentially hazardous vegetation.
and
• 10m away from any retained vegetation
strips or small areas of vegetation.
P2 With the exception of uses A2.1 With the exception of uses permitted Complies. The Noosa on Weyba
permitted by an existing by an existing approval, the following uses Precinct One (refer Appendix A) will
approval, any material change of are not located within a medium or high provide a variety of uses including
use must not result in a high potential bushfire hazard area: detached residential living,
concentration of people living or (a) educational establishment; recreational community centre, local
congregating in a medium or (b) hospital; neighbourhood centre and multiple
high potential bushfire hazard (c) aged persons accommodation housing. The uses within Precinct One
area. (including Retirement Village and are designed to support a diverse
Residential Care Facility); community, with land parcels
(d) caravan park; identified for retirement and aged care
(e) child care centre; uses, medium density residential
(f) community centres; living, and premium lakefront
(g) community residence; residential lots. All of these uses are
(h) high security correctional facilities; or located within that part of Lot 11 on
(i) development involving the manufacture SP250714 that is classified as Low
or storage of hazardous materials in bulk. Hazard areas on Regulatory Map 1.7
– Bushfire Prone Areas (see Table 5-
3).
P3 Vehicular access must be A3.1 For development proposed in a Complies – As detailed in Section 4
designed to mitigate against medium or high potential bushfire hazard herein the Noosa on Weyba
bushfire hazard by: area, the development design incorporates: development concept makes provision
(a) ensuring adequate access (a) a perimeter road that is located within for measures that are consistent with
for fire fighting and other the development site between the A3.1- A3.3 and thereby complies with
emergency vehicles; boundary of the proposed lots and the P3.
(b) ensuring adequate access adjacent bushland having a minimum
for the evacuation of residents cleared width of 20 metres; or
Northbrook Corporation Pty Ltd Version 2 11 October 2013
Bushfire Assessment Report v2.docx Commercial in Confidence Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 9- Amended Bushfire Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.