Council archive · source document
Attachment 9- Amended Bushfire Assessment Report MCU12/0208
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa on Weyba
Bushfire Assessment Report
Performance Criteria Acceptable Measures Noosa on Weyba Response
and emergency personnel, on (b) if a) is not possible, a perimeter track
the event of an emergency, on a minimum cleared width of 6 metres
including alternative safe access within the development site to adjacent
routes should access in one bushland which has a grade not greater
direction be blocked in the than 12.5%;
event of a fire; and AND
(c) providing for the separation A3.2 The road design is capable of
of developed areas and adjacent providing access for fire fighting and other
bushland. emergency vehicles by incorporating
through roads only and road grades not
exceeding 12.5%.
AND
A3.3 Any perimeter track:
• incorporates access points at either end,
a vehicle passing bay every 200 metres
and a vehicle turnaround every 400 metres;
• has a formed width and gradient, and
erosion control devices to local government
standards;
• is either dedicated to Council, or within
an access easement that is granted in
favour of Council and Queensland Fire and
Rescue Service.
Element 3: Siting, Building Design and Construction 3
P1 Buildings and structures are A1.1 Buildings and structures are sited in Complies – As detailed in Section 4
sited to minimise potential the area of lowest bushfire hazard. the Noosa on Weyba Concept Master
bushfire hazard and associated AND Plan makes provision for measures
clearing of remnant vegetation. A1.2 Buildings and structures are located that are consistent with A1.1 and
away from the most likely direction of a fire A1.2.
front, or on a flat site at the base of the
slope. The Noosa on Weyba Concept Master
AND Plan would not require the clearing of
A1.3 No clearing of remnant vegetation remnant vegetation identified on
identified on Regulatory Map 1.1 Nature Regulatory Map 1.1 Nature
Conservation Management Areas Special Conservation Management Areas
Management Area is required. Special Management Area for bushfire
AND hazard mitigation purposes and is
A1.4 On properties where boundary fences thereby consistent with A1.3.
abutting native bushland areas,
construction of timber paling fencing should The Noosa on Weyba Concept Plan
not be permitted. The construction of does not proposed the construction of
colourbond steel fences is permitted. timber paling fencing along
boundaries adjacent to retained (or re-
established) bushland habitats and
conditions of approval to that effect
could be imposes. Therefore the
Noosa on Weyba proposal is
consistent with A1.4.
Element 4: Water Supply
P1 The development proposed A1.1 Each dwelling unit on the site with a Complies –
provides an adequate water gross floor area greater than 50m² has a
supply for fire fighting purposes reliable reticulated water supply that has a As detailed in Section 4.2, the Noosa
and the water supply provided minimum pressure and flow of 10 litres a on Weyba proposal complies with
for fire fighting purposes must be second at 200kPa at all times. A1.1 and compliance with A1.3 – A1.9
safely located and freely OR can be conditioned
accessible for fire fighting A1.2 Each dwelling unit on the site has an
purposes at all times. The water on-site water supply volume of not less
supply must be reliable, and than 20,000 litres available for the
have sufficient flow and pressure purposes of fire fighting.
requirements for fire fighting The water supply can be either:
purposes at all times. (a) a separate tank; or
(b) a reserve section in the bottom part of
the main water supply tank; or
(c) a swimming pool installed immediately
upon construction of the development.
Northbrook Corporation Pty Ltd Version 2 11 October 2013
Bushfire Assessment Report v2.docx Commercial in Confidence Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 9- Amended Bushfire Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.