Noosa on Weyba
Bushfire Assessment Report
- improve road access and QFRS response times to existing residential properties to the south and
west of the Noosa on Weyba project site.
7. Establishment of a network of fire trails linked to the formal road network to provide additional safe
access to areas of potentially hazardous vegetation to facilitate bushfire management actions (e.g.
conduct of fuel reduction/ecological burn offs, wild fire suppression).
8. Establishment of a reticulated water supply to the Noosa on Weyba project that caters for fire
management requirements in respect of capacity and access to fire hydrants. The presence of a
reticulated water supply would also be of benefit to adjacent developments which are not currently
serviced by a reticulated water supply.
9. Management of urban residential areas under a Body Corporate arrangement which should ensure
that:
a. all buildings are designed and constructed in accordance with Australian Standard AS3959-
2009 Construction of buildings in bushfire prone areas;
b. the landscaping of common areas and bushfire hazard management infrastructure are
managed and maintained to ensure that residents and visitors are not exposed to unacceptable
bushfire hazard levels; and
c. general property maintenance actions are carried out on a regular basis, including:
> ensuring that firebreaks are in an appropriate condition;
> checking that fire hydrants are operational and that any necessary fittings to enable access
to the stored water are in good repair;
> cleaning all gutters and eves regularly, and removing debris from roofs;
> keeping yards tidy and regularly raking beds and landscaping close to structures clear of fine
fuel;
> checking that window shutters and screens fitted to openings are in good repair;
> making sure that adequate protective clothing (i.e. sturdy boots, overalls, and face-masks to
filter heavy smoke) is at hand for use in the event of a fire;
> ensuring all metal roofing sheets are securely in place or if the roof is tiled, ensuring there
are no loose tiles and that embers cannot be driven between them; and
> any dangerous and flammable materials are appropriately stored to guard against ignition
during a fire.
Other relevant features of the locality of the Noosa on Weyba site include:
1. Eenie Creek which traverses the Noosa on Weyba project site and which acts as a partial barrier to
the movement of fire between the relatively large tracts of forested land to the south and north of
Eenie Creek;
2. Walter Hay Drive which traverses the Noosa on Weyba project site and which acts as a partial barrier
to the movement of fire between the tracts of forested land to the east and west of Walter Hay Drive;
3. Lake Weyba which extends along the eastern boundary of the Noosa on Weyba project site;
4. the Eumarella Shores development, which encompasses approximately 40 hectares of privately
owned forested land within which are nestled approximately 14 dwellings, located on the south-
eastern boundary of Noosa on Weyba project site;
5. the Weyba Point Cottages development located immediately south of the Eumarella Shores
development;
6. the Weyba Downs residential development located approximately 300m to the south of the Noosa on
Weyba project site, on the southern boundary of the Eumarella Shores and Weyba Cottages
developments;
Northbrook Corporation Pty Ltd Version 2 11 October 2013
Bushfire Assessment Report v2.docx Commercial in Confidence Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 9- Amended Bushfire Assessment Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.