STORMWATER MANAGEMENT PLAN Client: Thomco (No 2087) Pty Ltd Location: 215 David Low Way, Peregian Beach CONTENTS 1.0 INTRODUCTION 3 2.0 SITE DESCRIPTION 3 2.1 Site Location 3 2.2 Land-use, Topography and Drainage 4 2.3 Proposed Land-use 4 3.0 WATER QUALITY AND TREATMENT OBJECTIVES 4 3.1 Water Quality Objectives 4 3.2 Area of Treatment 5 4.0 WATER QUALITY MODELLING ASSESSMENT/APPROACH 5 4.1 Scenario Methodology 5 4.2 Proposed Stormwater Treatment Train 5 4.3 MUSIC Model Parameters 7 4.4 Land Use/Source Node Areas 7 4.5 Pollutant Reduction Results 7 5.0 MAINTENANCE PERIOD 8 5.1 Maintenance During ‘Construction Period’ 8 5.2 Maintenance During ‘Maintenance Period’ 8 6.0 CONCLUSIONS AND RECOMMENDATIONS 8 7.0 REFERENCES 9 LIST OF APPENDICES APPENDIX A Development Plan – Sprout Architects APPENDIX B Stormwater Management Layout – Covey Associates Pty Ltd Covey Associates Pty Ltd 2 Project No: 162042 Consulting Engineers 100949Rpt Issue A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.