Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendices 6 SMP, 7 Bushfire & 8 Noise impact - Email 3 of 4 - MCU16/0153 & REC16/0041

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                     STORMWATER MANAGEMENT PLAN
Client: Thomco (No 2087) Pty Ltd                            Location: 215 David Low Way, Peregian Beach


1.0 INTRODUCTION
This document contains information regarding the stormwater quality management of the proposed
Essence of Peregian Beach development at 215 David Low Way, Peregian Beach in support of a
Material Change of Use (MCU) application. The proposal consists of a total of 58 accommodation
units.
Noosa Shire Council (NSC) requires that stormwater quality be appropriately managed and treated
prior to discharge from the site. The Queensland State Planning Policy (SPP, 2016) also requires
that urban development projects demonstrate how the potential impacts to receiving environments
are mitigated. The objective of this report is to outline the requirements for effective stormwater
quality management at the site.
2.0 SITE DESCRIPTION
2.1 Site Location
The site is located at 215 David Low Way, Peregian Beach and is described as Lot 77 on
SP2316115. Refer Figure 1 for the locality map.




                                   Development
                                      Area




       Current RP
        Boundary
       (Lot 77 on
       SP231615)




Figure 1 - Locality Map
(Image courtesy of Noosa Shire Council Public Mapping System, accessed 8 December 2016)




Covey Associates Pty Ltd                             3                                 Project No: 162042
Consulting Engineers                                                                    100949Rpt Issue A
Log in to download the original file

Appendices 6 SMP, 7 Bushfire & 8 Noise impact - Email 3 of 4 - MCU16_0153 & REC16_0041.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.