STORMWATER MANAGEMENT PLAN Client: Thomco (No 2087) Pty Ltd Location: 215 David Low Way, Peregian Beach 2.2 Land-use, Topography and Drainage The development area is currently vacant land and represents the balance lot from the Peregian Village Market. The lot is currently being reconfigured, as per application No. 152010.627.03. A plan sealing application is currently with NSC (PS16/0034) and is expected to be released imminently. The site is approximately 2.312 ha in area, with the development area being approximately 1.165 ha. The site slopes at approximately 5% from the east (David Low Way) to the west (Noosa National Park). The site will ultimately drain to Lake Weyba. 2.3 Proposed Land-use The proposal is for a residential development consisting of a total of 58 accommodation units comprising the following: 20 one-bedroom motel units (visitor accommodation); 12 one and two-bedroom dual use units (visitor and/or residential accommodation); and, 26 three and four-bedroom detached dwellings. The remainder of the development area will comprise service roads, parking and landscaped areas. Refer to the Proposed Development Plan in Appendix A. 3.0 WATER QUALITY AND TREATMENT OBJECTIVES This section of the Stormwater Management Plan (SMP) will demonstrate how the proposed stormwater quality management strategy complies with the requirements of the NSC and the SPP (2016) in terms of demonstrating how the relevant stormwater pollutant reduction objectives will be met. Stormwater runoff generated from the site must achieve pollutant load reduction targets (Table 1) and be demonstrated through the use of appropriate modelling software. Table 1 – Pollutant Reduction Targets for South East Queensland Pollutant Type Reduction Objective Toal Suspended Solids (TSS) 80% reduction in average annual load of pollutants Total Phosphorus (TP) 60% reduction in average annual load of pollutants Total Nitrogen (TN) 45% reduction in average annual load of pollutants Gross Pollutants (GP) 90% reduction in average annual load of pollutants 3.1 Water Quality Objectives The site ultimately drains to Lake Weyba. Table 2 outlines the specific performance criteria required within receiving waters for Lake Weyba as identified in ‘Noosa River Environmental Values and Water Quality Objectives Basin No. 140 (part)’, including Kin Kin Creek, Teewah coastal creeks, Lakes Cooroibah, Cootharaba, Doonella and Weyba (Environmental Protection Water Policy, 2009). Lake Weyba is identified on Plan WQ1401 of the Environmental Protection (Water) Policy (2009) Southeast Queensland Map Series as being fresh water wallum tannin-stained Streams. Covey Associates Pty Ltd 4 Project No: 162042 Consulting Engineers 100949Rpt Issue A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.