Appendices 6 SMP, 7 Bushfire & 8 Noise impact - Email 3 of 4 - MCU16/0153 & REC16/0041

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                        STORMWATER MANAGEMENT PLAN
Client: Thomco (No 2087) Pty Ltd                               Location: 215 David Low Way, Peregian Beach



The following mitigation measures are proposed for the overall stormwater management at the site.
All three (3) bioretention basins discussed below will have filter media established to a depth of 0.5
m depth, with a 0.1 m and 0.2 m transition and drainage layer respectively. The extended detention
depth is 0.3 m. Refer to the Preliminary Stormwater Management Layout in Appendix B for details.
Catchment A: This catchment includes runoff from the ‘entry’ portion of the road, the roof area of the
hotel building and associated ground area. The catchment is treated by Bioretention Basin A, which
has a surface area of 29 m2 and a filter area of 20 m2.
Catchment B: This catchment includes runoff from the roof areas and associated ground areas of
the units in the central island (1 to 9) and five (5) of the terrace units (22 to 26). The catchment is
treated by Bioretention Basin B, which has a surface area of 15 m2 and a filter area of 10 m2.
Catchment C: This catchment includes runoff from the roof areas and associated ground areas of
the units on the northern edge of the site (10 to 16) and five (5) of the terrace units (17 to 21). The
catchment is treated by Bioretention Basin C, which has a surface area of 71 m2 and a filter area of
50 m2.
Refer Figure 2 for the MUSIC model layout.




Figure 2 - MUSIC Model Layout


Table 3 identifies the catchments applicable to each of the treatment devices.


                     Table 3 – Type and Size of Proposed Stormwater Treatment Device
                 Stormwater Treatment
                                                                       Detail
                 Device
                 Catchment A
                 Bioretention Basin A              Surface area of 29 m2 and a Filter area of 20 m2
                 Catchment B
                 Bioretention Basin B              Surface area of 15 m2 and a Filter area of 10 m2
                 Catchment C
                 Bioretention Basin C              Surface area of 71 m2 and a Filter area of 50 m2

Covey Associates Pty Ltd                                 6                                            Project No: 162042
Consulting Engineers                                                                                   100949Rpt Issue A
Log in to download the original file

Appendices 6 SMP, 7 Bushfire & 8 Noise impact - Email 3 of 4 - MCU16_0153 & REC16_0041.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.