Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appendices 6 SMP, 7 Bushfire & 8 Noise impact - Email 3 of 4 - MCU16/0153 & REC16/0041

of 59

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                   STORMWATER MANAGEMENT PLAN
Client: Thomco (No 2087) Pty Ltd                          Location: 215 David Low Way, Peregian Beach


5.0 MAINTENANCE PERIOD
The proposed bioretention basins will be installed at the end of the building construction phase when
the site is stabilised.
5.1     Maintenance During ‘Construction Period’
Erosion and sediment control devices will be installed at the commencement of the works to capture
and treat runoff during construction works. The sediment control devices should be cleaned out as
required and at the end of the works. During the construction stage, all sediment control devices
are to be inspected weekly, after runoff generating rain events and prior and after prolonged site
shut downs (e.g. holiday periods).
5.2     Maintenance During ‘Maintenance Period’
In order to establish vegetation and treatment functions in bioretention systems, the filter media must
be protected from pollutants commonly generated in the construction phases. It is therefore
recommended that the filter media be protected via geofabric and turf during construction. Upon
completion of the construction phase, the protective measures can be removed. During the
operational phase, regular maintenance of the bioretention system is required to ensure
comprehensive vegetation establishment, a critical component in stormwater pollutant uptake.
6.0 CONCLUSIONS AND RECOMMENDATIONS
This SMP has provided detail regarding the proposed stormwater treatment strategy for the
Essence of Peregian development. The strategy makes use of bioretention basins to treat surface
runoff prior to discharge to the Council Reserve to the west of the site. The proposed strategy
achieves the required pollutant reduction targets required by NSC and the SPP (2016).




Covey Associates Pty Ltd                           8                                  Project No: 162042
Consulting Engineers                                                                   100949Rpt Issue A
Log in to download the original file

Appendices 6 SMP, 7 Bushfire & 8 Noise impact - Email 3 of 4 - MCU16_0153 & REC16_0041.pdf · 13.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.