Appendices 6 SMP, 7 Bushfire & 8 Noise impact - Email 3 of 4 - MCU16/0153 & REC16/0041
Very large file: it may take a few minutes
The original of this document is very large (13.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
STORMWATER MANAGEMENT PLAN Client: Thomco (No 2087) Pty Ltd Location: 215 David Low Way, Peregian Beach 5.0 MAINTENANCE PERIOD The proposed bioretention basins will be installed at the end of the building construction phase when the site is stabilised. 5.1 Maintenance During ‘Construction Period’ Erosion and sediment control devices will be installed at the commencement of the works to capture and treat runoff during construction works. The sediment control devices should be cleaned out as required and at the end of the works. During the construction stage, all sediment control devices are to be inspected weekly, after runoff generating rain events and prior and after prolonged site shut downs (e.g. holiday periods). 5.2 Maintenance During ‘Maintenance Period’ In order to establish vegetation and treatment functions in bioretention systems, the filter media must be protected from pollutants commonly generated in the construction phases. It is therefore recommended that the filter media be protected via geofabric and turf during construction. Upon completion of the construction phase, the protective measures can be removed. During the operational phase, regular maintenance of the bioretention system is required to ensure comprehensive vegetation establishment, a critical component in stormwater pollutant uptake. 6.0 CONCLUSIONS AND RECOMMENDATIONS This SMP has provided detail regarding the proposed stormwater treatment strategy for the Essence of Peregian development. The strategy makes use of bioretention basins to treat surface runoff prior to discharge to the Council Reserve to the west of the site. The proposed strategy achieves the required pollutant reduction targets required by NSC and the SPP (2016). Covey Associates Pty Ltd 8 Project No: 162042 Consulting Engineers 100949Rpt Issue A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.