Appendix 9 - Detailed assessment against the Noosa plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPART 14 – ASSESSMENT CRITERIA FOR DEVELOPMENT FOR A STATED
PURPOSE OR OF A STATED TYPE
Division 14 – Earthworks Code
Table 14-52 Earthworks
Column 1 Column 2 Column 3
Specific Outcomes Probable solutions Response
(if code assessable)
14.119 Effects of works
Drainage
O1 Finished surface levels ensure S1.1 The finished surface gradient of any Complies
land is free draining. filled or excavated area is within the range Refer to the stormwater
0.5% to 1.5% and drains to Council’s management report
stormwater infrastructure where available or
where stormwater infrastructure is not
available, toward the street.
Hydraulics
O2 Any change to the level of the No solution provided. Complies
land does not have an adverse
flooding impact on the flooding and
drainage characteristics off-site.
Geotechnical considerations For assessable development—
O3 Earthworks do not result in S3.1 Filling works are undertaken in Complies
geotechnical instability on the accordance with Section 2.8- Filling of Site The site is relatively flat, and
premises or nearby premises. of Council’s PSP5 - Engineering Design earthworks would be minimal
Standards- Roads and Drainage & and mainly restricted to
Earthworks replacing the existing fuel
storage tanks
S3.2 Where the filling is for residential
commercial or industrial purposes the
works comply with Australian Standard -
Guidelines for earthworks on commercial &
residential development.
Local amenity
O4 Earthworks do not cause S4.1 The following control Complies
disturbance to the amenity of the measures are implemented— This can be conditioned as part
neighbouring land. a) regular water spraying of of the approval
exposed areas to suppress dust;
b) provision of dust stabilised or sealed
internal roads;
c) protective covering of exposed areas that
are left for more than 2 weeks; and
d) if there is no valid development permit for
the site, disturbed areas are revegetated
using species identified in PSP3 -
Landscaping Plants and Guidelines;
S4.2 Earthworks are undertaken only during Complies
the hours of 7am to 6pm, Monday to Friday This can be conditioned as part
and 7am to 6pm on Saturday. No work is of the approval
undertaken on Sunday or public holidays.
Vegetative Waste
O5 Vegetation cleared from a S5.1 Cleared vegetation is transported off-
development site is disposed of in an site for disposal in an approved green waste N/A
environmentally responsible manner. disposal facility;
OR
S5.2 Cleared vegetation is mulched on-site
and reused for landscaping of the finished
development; N/A
OR
S5.3 Cleared vegetation is disposed of for
the purpose of firewood. (Note: Disposal of
vegetative waste by burning off is not an
acceptable method of disposal). N/A
Managing contamination risk
Part 14 – Assessment Criteria – Codes (The Noosa Plan) Page 12 of 28