SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 11 MAY 2021
Image 1 & 2: Sea Eagle Drive, Tewantin - Footpath Construction
2. COVID Recovery Funding Program
The $4.6m received by Council from COVID stimulus funding has been allocated to a total of 25
projects across the Shire. Of the total 25 projects, 19 are either taking place or completed.
Expenditure actuals and commitments exceed $3.4m as at 27 April 2021.
Additionally, reseal projects, comprising sealing the gravel section of Tinbeerwah Road and
pavement repairs and bitumen seal of Green Gate Drive, Cooroibah, have now also been completed.
These projects were funded as part of the Local Roads Community Infrastructure (LRCI) grant.
Reseal works on David Low Way, Peregian Beach (Image 3) are currently underway. The 1.6km
section from Peregian Esplanade to Mahogany Drive was identified as requiring remediation in the
recent road condition survey. The completion of these reseal works is expected by 15 May 2021.
Image 3: David Low Way, Peregian Beach – Road Reseal Night Works
Page 27 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.