Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2021-05-11 Services & Organisation Committee Meeting Agenda

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                             11 MAY 2021


BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                          THE NEXT QUARTER
Transport Strategy
Plan the implementation of the key             Collaboration on the Walking and           Schools program – ongoing;                 Ongoing actions include;
transport strategies in the Noosa               Cycling Strategy projects.                 Evaluate the results from 2020/2021        Investigation into paid parking.
Transport Strategy 2017-2027.                  Preparation for 2021 Easter Holidays        Peak Period Traffic Management             Noosa Junction parking demand
                                                Go Noosa program.                           plan taking COVID impacts into              analysis.
                                               Car Parking Management including            consideration.                             Scope initiatives for Go Noosa
                                                refinement of traffic control systems      Investigation into paid parking and         2021/2022 Christmas Holidays.
                                                during peak holidays.                       Noosa Junction parking demand
                                               Submission of grant application for         analysis.
                                                design of Noosa Drive walking and          Input into Noosa Traffic Study
                                                cycling upgrade.                            update.
Trial key transport strategy initiatives.      TransLink recommend to proceed to          Collaborative      approach      with      Ongoing      collaboration   and
Develop      a     memorandum          of       develop individual initiatives over         TransLink on Electric bus fleet.            negotiation with TransLink on
understanding with TransLink and other          MOU.                                       Scope          public       transport       identified Noosa public transport
key stakeholders.                                                                           improvements.                               projects.
                                                                                           Investigate    Demand      Response
                                                                                            Transport models to Kin Kin.
                                                                                           Investigate bus to Noosa National
                                                                                            Park and Noosa Spit as part of Go
                                                                                            Noosa program.
                                                                                           Investigate option for Free Weekend
                                                                                            Buses.
Business as Usual Activities                   Noosa Drive walking and cycling            Collaborative approach delivery            Report to PCG for approval to enter
                                                pathway concept planning complete.          team Walking/Cycling project and            into   funding    agreement     with
                                               Negotiation with TransLink for              High Priority Corridor Study team on        TransLink for Noosa Drive precinct
                                                funding into options analysis and           design outputs.                             planning (2021/22 Financial year).
                                                business case for upgrade of Noosa         Prepare scope for Noosa Heads              Commence        options     analysis
                                                head bus stop into a multimodal stop.       Multimodal Transport interchange            planning    for    Noosa     Heads
                                                                                            options analysis planning.                  Multimodal upgrade.




                                                                                                                                                            Page 43 of 96
Log in to download the original file

2021-05-11 Services & Organisation Committee Meeting Agenda(PDF, 10MB).pdf · 10.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.