Original source · versioned page text
2021-06-08 Planning & Environment Committee Meeting Agenda
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 JUNE 2021
Figure 3 – Plan of subdivision
2. SITE DETAILS
2.1. Background
A building approval was issued for the construction of a dwelling in 1999.
An application for a Development Permit for Material Change of Use of Premises - Infrastructure
Uses - Service & Utility Type 3 – Tower & Operational Works (access and waterway barrier works)
was decided by Council at its Ordinary meeting on 20 April 2017. The approval permitted the
construction of an NBN tower with a vertical height of 46m west of the existing waterway and outside
of the riparian buffer area.
The applicant made representations on 17 May 2017 to the development approval conditions. The
representations related to changes to conditions 4, 6, 12 & 16, regarding overall height, noise limits,
and exposure to electromagnetic emissions and landscaping. A negotiated decision notice issued 7
June 2017 via delegation approved changes to Conditions 12 and 16 relating to health and safety of
electromagnetic emissions and landscaping. Changes to conditions 4 and 6 were refused.
Page 21 of 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.