Council archive · source document
08/1128 - Response to Information Request [As Published] · 132008.1128
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
‘ — |.8, Goodwin, Midson & Partners (Business name of Hillmir Pty. Ltd.) ABN 75 009 728 634 Website: www.goodwinmidson.com.au BRISBANE 64 Sylvan Road, Toowong, Qid 4066 P.O. Box 92, Toowong Brisbane, Qid 4066 Ph: (07) 3870 2161 Fax: (07) 3870 3944 Email: [email protected] SUNSHINE COAST 1/12 Technology Drive, Kawana Waters, Qid 4575 Ph: (07) 5493 1707 Fax: (07) 5493 4860 Email: [email protected] HERVEY BAY 2/449 Charlton Esplanade, Hervey Bay, Qld 4655 P.0. Box 5397, Torquay, Qld 4655 Ph: (07) 4125 1855 Fax: (07) 4125 1955 Email: [email protected] BOONAH 2 Park Street, Boonah, Qld 4310 Ph/Fax: (07) 5463 1596 Email: [email protected] Our Reference Sunshine Coast:DW 13011:Blue Care Sunrise Beach Directors P.I.Midson $,J.Grehan A. Byrom R.A. Fulloon Consultant J.B. Goodwin Associates O.P, Stephens K.]. Jordan \ J.B. Goodwin, Midson & Partners Consulting Surveyors, Town Planners and Development Consultants. Friday 28"" November 2008 The Chief Executive Officer Sunshine Coast Regional Council - Tewantin Office Locked Bag 72 a8 NOV 5888 Sunshine Coast Mail Centre Qld 4560 ' one = Tewantin Front Goyal? ATTENTION: Tracy Jones (Senior Planning Officer) Development Assessment Dear Tracy Re: DA for ROL (1 into 2) and MCU (Retirement & Special Needs) at Grasstree Court, Sunrise Beach Q 4567 (Council ref: 2008/1128) We refer to Council's letter dated 11" August 2008, requesting further information in regard to the above development application. In accordance with Section 3.3.8 of the integrated Planning Act 1997, the following items address and correspond to the numbered items in the Information Request. Several attachments including an addendum of plans prepared by smith+tracey architects (S+T) accompany this response. Refer to page 8 of this letter which sets out the list of attachments. Land Use General 1. A set of A1 scale plans is provided by smith+tracey architects. 2. Two (2) hard copies of the Codes have since been mailed to Council. Building Heights and Roof Forms 3. Refer to Building Height & Roof Form Plan no. DA ADD43 prepared by smith+tracey. 4. Refer to addendum of plans prepared by smith+tracey architects. 5. The site layout has been designed so as to provide single storey villas adjacent to and in keeping with surrounding existing detached residential development to the east of the site. Furthermore, for the most of this part of the site, the land is relatively flat which enables ease of movement through minimal increase in grade across the land. However, to maintain this grade across the site, especially along the western portion where the land increases in slope, it has been necessary to increase the building heights. Git BRISBANE SUNSHINE COAST HERVEY BAY BOONAH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 115 pages
Page 2
Page 2 As such, the Central Facilities and Apartment buildings along the western portion of the site exceed the building height of 8 metres as they are elevated above natural ground level to enable pedestrian and wheelchair mobility across the site from east to west. The buildings remain 2 storeys of useable floor area but may appear as three storeys from the western-most elevation point. This is clearly evident on the drawing by smithttracey architects Site Cross Section A plan no. DA ADD44 which shows this occurrence on both buildings. To minimise the impact of this, landscaping of the lower level areas is proposed and at no point does the building height appear out of keeping with surrounding development and vegetation. It is not expected that the height of the buildings in these areas will cause any significant impacts on the visual amenity or privacy of others as a result. The overriding need to provide at grade mobility is essential in a development such as this and the benefits of this attribute far outweighs any minor negative impacts of having buildings partially over 8 metres high. 6. Refer to roof plans in the attached addendum of plans prepared by smith+tracey architects. The roof pitch exceeds 5 degrees throughout the development with exception of the suspended concrete roof deck to RAC supporting plant and LMR. Roof overhangs apply to greater than 75% of all buildings. Bullding Setbacks 7. The ILU villas are set back at least 6 metres from the northern (front) property boundary facing Grasstree Court. The ILU apartment 4 building is set back a minimum of 3.65 metres from the adjacent northern (side) boundary. These both comply with Schedule 1 minimum boundary setbacks for development in a Community Services Zone. Apartment building 4 Is also set back a minimum of 0.65 metres from the proposed 3 metre wide access easement. 8. Refer to Master Plan Building Setback Plan no. DA_ADD42 prepared by smith+tracey architects Site Cover 9. Please refer to the s+t Site Cover Calculations Plan no. DA ADD46 showing a site cover of 40% for lot 6 (RAC) and 32% for lot 9 (Retirement Village). Landscaping 10. Please refer to the st+t Landscaping Calculations Plan no. DA ADD 45 showing the relevant soft and hard landscaping areas and respective percentages.
Page 3
Page 3 11. The ILU villas are setback an average of 11 metres from the eastern property boundary, which fronts onto Ben Lexcen Drive. An acoustic and screening fence will be located within the 3 metre wide landscaping buffer along the eastern property boundary to provide security and privacy to the residents as well as visual amenity for both internal and external residents alike. Landscaping of the buffer is proposed to both screen the fence and improve the local streetscape. It is a waste of flat developable land to setback the villas any further back from the existing road pavement of Ben Lexcen Drive as it is already a significant distance from the property boundary given the broad road reserve. The villas in this location will have convenient access to the nearby shops and public transport, whilst enjoying a high level of amenity and privacy. As this area will be a visual approach to the retirement village, the landscaping of the development along this road way is particularly important to maintain and ensure the use remains appealing and safe. It is expected that a more detailed landscaping plan (including proposed fencing) will be provided to Council during the operational works stage of development. 12. The conveniently located short term visitor and staff car parking spaces immediately adjacent to the Grasstree Court road reserve in front of the RAC are a minimum 1 metres from the property boundary. These spaces will be substantially and appropriately landscaped to buffer the visual impact of them from the nearby pedestrian path and roadway. The importance of doing so, so as to ensure the appearance of the facility is of a high standard is fully appreciated and we are confident this can be achieved in the narrow area. It is expected that a more detailed landscaping plan will be provided to Council during the operational works stage of development. Car Parking / Access 13. Car parking has been allocated as shown on Parking Calculations Plan no. DA_ADD 47 and as scheduled on DA_05/P1 by smith+tracey architects. 13.1. the attached letter from Blue Care sets out the expected number of employees relevant to proposed use. 13.2 Refer to the attached report prepared by Arup for a reduced requirement. 13.3 Respite care and RAC share a common emergency vehicle space. ILUs have a single emergency space at the Central facilities, and parking is available at the entrance to individual ILUs (at a maximum gradient of 1:20 throughout). 13.4 Visitor parking has now been identified on Parking Calculations plan DA_ADD 47 by smith+tracey architects. 13.5 Parking has been deleted from the road reserve as requested and as shown on revised master plans. Git
Page 4
Page 4 13.6 Car spaces have been numbered on all basement plans and a coloured Parking Calculations plan is provided which clearly defines the proposed uses. 14. The car parking allocations for staff at the RAC building has been revised as shown on plan DA_11/P1 by smith+ttracey architects. Biodiversity 15 — 18 Refer to attached letter and attachments by Place dated 25" November 2008 responding to these items. 19. The estimated nutrient loads are as follows: Post- Load based Pre- Post- . developed, reduction developed developed mitigated (%) Flow (ML/year) 24.9 46.6 32.5 30.3 TSS (kg/yr) | 5860 4520 893 80.2 TP (kg/yr) 619 12 4.23 64.8 TN (kg/yr) 46.2 95.8 40.2 58.0 GP (kg/yr) 94.1 1030 4.34 99.6 The load based target reductions for TSS (80%), TP (60%) and TN (45%), are achieved. The increase in mean annual runoff volume is not considered to be detrimental to the local environs. 20. The impact of the proposed development, including earthworks, to onsite and offsite hydrology is essentially addressed in current report. Bushfire 21. Please refer to attached fetter and map of development from LandGraphics showing fire break and fire trail locations. 22. Please refer to attached letter from LandGraphics in response to this point regarding Queensland Fire and Rescue Service requirements. Cultural Heritage 23. A search of the subject site for artefacts of cultural and heritage significance was conducted in April 2008 and a shell midden has been identified on existing lot 1 approximately 1km west of the subject site (refer to attached email and aerial photo dated 23 April 2008). Land Development Rainwater Tanks 24. Rainwater tanks were sized in accordance with the Noosa Planning Scheme Policy 22 — Water Tanks. Gut
Page 5
Page 5 25. The term “Residential Unit Dwellings” refers to independent living units, apartments and serviced apartments. The Queensland Development Code requires at least 3000L for a Class 1 building other than a detached Class 1 building. Based on 129 dwelling units including the independent living units, apartments and serviced apartments, 387 kL storage would be required. The Residential Aged Care facility has a roof area of 3768 m?*, Based on the QDC storage requirement of 15 Lim? roof area, this equates to 55kL. A total storage capacity of 387 + 55 = 442m? is required to comply with the Qoc. The re-use demand for the proposed development was determined as follows: e¢ Maximum Hour (MH) potable water demand (Noosa Planning Scheme Policy 6) = 3.3 L/sec/ha. « Assume 80% site area developed = 4.676 x 0.8 = 3.74 ha. « MH potable demand = 12.34 L/s. e Assume MH peaking factor = 4.5 x Average Day demand (in accordance with the Natural Resources and Water Planning Guidelines for Water Supply and Sewerage), thus AD = 2.74 L/s. « Based on 20% toilet consumption, 15% laundry consumption, and a 5 kLUday allowance for external use, the adopted re-use demand was 88 kLiday. « Based on rainfall data for the 10 year period, from 1989 to 1998, the adopted re-use demand would provide a 37% potable demand reduction with 95.6% reliability. 26. Please refer to above response demonstrating compliance with QDC. Earthworks 27. Detailed design of batters and banks will be undertaken as part of the Operational Works application. Primary retaining has been identified on the master plans and Site Cross Section no. DA_LADD 44 by smithttracey architects. This plan shows typical cut and fill requirements to achieve the requisite 1:20 gradients. Stormwater Modelling 28. Nambour rainfall and precipitation data was used only for water quality modelling. Stormwater quantity modelling undertaken based on site- specific Noosa IFD data. Gu
Page 6
Page 6 29. Sealing bio-retention basin is not considered necessary. Stormwater is treated through infiltration in the bio-retention basin to meet water quality objectives. Thus deep seepage may occur with minimal environmental disruption and act to minimise the ecological impact of the proposed development. 30. Indicative construction checklists and maintenance schedules were extracted from the Healthy Waterways Guidelines. Please refer to attached copy of these Guidelines. Also attached are the Bioretention Construction and Bioretention Maintenance Guidelines also extracted from the Healthy Waterways Guidelines dated 1% June 2006. 31, The natural surface contours were used to determine the pre- developed peak stormwater discharges. The estimated time of concentration was 18 minutes for Lot 6 and 22 minutes for Lot 1. The time of concentration is reduced to 8 minutes, post-development. The resulting increases in rainfall intensities were used for design purposes. Rainwater tanks were assumed to be full at the onset of critical storms, for worst-case scenario assessment. 32. Stormwater modelling was reviewed. The areas used for calculation were as reported in Section 2.6.2. The areas reported on Dwg 2383-01 SK01 are slightly larger due to variation in alignment of catchment boundary, including areas which are not impacted by the development. 33. The freeboard requirements were determined in accordance with the Queensland Urban Drainage Manual (QUDM) Table 5.06.1. 34. The anticipated pH range for treated stormwater is 4 — 6.5. It is proposed that water quality monitoring be undertaken as part of regular maintenance schedule, ongoing maintenance be undertaken as required to ensure the desired treatment functionality is maintained. 35. MUSIC modelling has been undertaken in accordance with the Gold Coast City Council MUSIC modelling guidelines. This provides the best available assessment of water quality objectives. Further review of analyses and RPEQ certification will be undertaken as part of the Operational Works application. 36. Stormwater discharge is proposed to be treated through the use of rainwater tanks, multiple gross pollutant traps and the bio-retention basins. 37. Road network forms major overland drainage channels. Suitable overland channels are proposed where major flow paths not confined to roadway. Overland flow paths were included in the XPSWMM model, and set to convey major flow when the minor piped drainage system became overloaded. 38. At initiation of overflow to National Park, depth of flow in channel is 4.0m. Cross sectional area is 3.0m?. Gil
Page 7
Page 7 From Table 2.10 of the Engineering Report: Peak 100 year ARI discharge from southern basin is 0.28 m/s, which gives velocity = 0.09 m/s. Peak 100 year ARI discharge from northern basin is 0.05 m/s, which gives velocity = 0.017 mis. The model was reviewed. The model indicated that the peak velocity in the southern basin would be 0.135 m/s and the peak velocity from the northern basin would be 0.025 m/s. Scour due to flow velocities is considered to be negligible. 39. It is proposed that grease and oil filtration devices will be installed on GPTs. 40. All basement car parks, including the RAC basement will drain by gravity means to the bioretention basins. Refer to attachment for further details. 41. RAC basement plans now include gated drains to facilitate gravity feed of stormwater as per item 40 above. Ecological Impacts 42. It is suggested that single high ARI events (Q1 and above) have minimal long term ecological impact. The bio-retention basin acts to attenuate the peak discharges for high ARI events such that flow volume in equals flow volume out, less minor infiltration or evaporation losses. Refer to attached letter from Place dated 25"" November 2008. 43. This item has been addressed fully in the attached letter by Place dated 25'" November 2008. 44. The proposed spreader channels will act to redistribute collected stormwater in a manner which, as much as possible, emulates the natural runoff conditions for the site. 45. The proposed pergola (open nature) would not impact on MUSIC modelling or bio-retention treatment functionality providing adequate light is allowed for plant requirements. Shade tolerant species may be used as outlined in the Healthy Waterways Guidelines. 46. The location of the bio-retention basin has been constrained by the development layout. Construction and vegetation management plans to be conditioned as part of the Operational Works application. External Traffic Generation 47 - 52 Please refer to the attached report prepared by Arup addressing these points. Gui
Page 8
Page 8 Internal Traffic Generation and Vehicular Access 53. All internal roads have been increased in width to a minimum of 5.5 metres as requested to allow for two way traffic flow. Refer to st+t drawing DA_ADD42 and DA_ADD47 and Arups report. 54. Refer to attached report from Arup. 55, All pathways have been increased to a minimum of 1.5 metres as requested with majority increased to 2 metres wide. Refer to the Building Setbacks and Easement plan no DA_ADD42 by smith+tracey architects. 56. The service bay has been increased to the RAC with revised maneuvering capabilities as shown on the RAC ground floor plan no ADD_ DA11/P1. The service bay to the central! facilities will require service vehicles to back up to the loading bay for ease of loading/unloading. Therefore the exiting from the Central facilities loading bay will be in a forward motion. 57. The bin storage is now indicated on Parking Calculations plan no. DA_ADD47 by smith+tracey architects. Refer also to the attached report by Arup. 58, Road widths have been increased to 5.5 meters. Refer to s+t drawing no DA_ADD42 and Arup’s report. Car Parking 59-63 Refer to the attached report prepared by Arup. 64. The disabled spaces are clearly identified on drawing no. DA_ADD 47 by smith+tracey architects. External Infrastructure Agreements 65. It was agreed in principle at the prelodgement meeting on 14” February 2008 by Council’s engineer and Tracy Jones that it was inappropriate that the road remain, and that it was to be taken out of the site. 66. Not applicable — this will be addressed at Operational Works stage. 67. All pathways have been revised as required with the proposed maximum gradients of 1:20 throughout. 68. Subject to discussions with Council's Water and Sewerage Capital Works Manager, all easements have been clearly identified on the Building Setbacks and Easement plan DA_ADD42 by smith+tracey architects. Sewerage 69. Location of easements is shown. Gin?
Page 9
Page 9 Water Supply 70. Water Supply modelling analyses were undertaken based on the boundary conditions, provided by Worley Parsons on 7" May 2008, which were determined using the SCRC Water Supply Network Model! (refer to attached email from Worley Parsons). It is considered all of the information requested has been provided. However if the Assessment Manager considers only part of the information requested has been provided, then in accordance with Section 3.3.8 of the Act, we hereby request the Assessment Manager to contact us immediately for further clarification and also proceed with the assessment of the application. Yours faithfully J B Goodwin Midson & Partners D, Mek, frorew Westbrook (B.Ec. G.D.U.R.P.) Senior Town Planner (MPIA CPP) Attached: Addendum of plans prepared by smith+tracey architects (November 2008) Extract from Healthy Waterwise Guidelines (1*t June 2006) Letter and attached plans from LandGraphics (29" September 2008) Email from Worley Parsons to Cardo (7 May 2008) Letter by Blue Care outlining the anticipated number of employees for the proposed use. Report by Arup in relation to internal and external traffic.
Page 10
ADDITIONAL INFORMATION FOR ITEM 40 - STORMWATER The basement level of the proposed Residential Aged Care facility is RL 27.6mAHD. The base level of the bio-retention basin to which its basement drains (Lot 6) is RL 27.0mAHD. Therefore, the basement would drain under gravity. The pipe grade would be 0.8%, which is above the 0.5% minimum as specified in the QUDM Table 7.12.1. The 2 year ARI tail water level in the Lot 6 basin would be RL 27.8mAHD (Depth=0.8m) which would result in 200mm flood depths for the 2 year ARI event. Therefore, a non-return device is recommended to stop return flow into the basement. This will be detailed at Operational Works. The basement level of the proposed apartment buildings ranges from is RL 23.6 to 24.8 mAHD. The base level of the bio-retention basin to which the apartment buildings drain (Lot |) is RL 19.5mAHD. The grade would range from 5-13% which is acceptable under QUDM Table 7.12.1. The 100 year ARI tail water level in the Lot 1 basin would be RL 23.16mAHD (Depth=3.66m), which provides a minimum 0.44m freeboard to level of each apartment basement. Information provided by Cardo 27" November 2008 $:1301 1:081128inReqCardno
Page 11
“o 9 S% t Anthony Morris From: Page, Kevin (Bisbane) [[email protected]] Sent: Wednesday, 7 May 2008 9:11 AM To: Anthony Morris Subject: RE: Water Supply Retic Analysis Boundary Conditions Follow Up Flag: Foltow up Flag Status: Completed Anthony The boundary conditions at the junction of Ben Lexcen Drive and Grasstree Court are as follows. Node 3747 Peak Hour 19,00 Existing With adopted demand of 550EP HGL 74.77m 73.66m Pressure 42.73m 41.62m Elevation 32.04m 32.04 Should you require any further information please do not hesitate to contact me. Regards Kevin Page Team Leader Demand Management Worley Parsons Tel: (07) 3319 3726 Email: kevin.page @ Worle yParsons.com From: Anthony Morris [mailto:[email protected]] Sent: Tuesday, 6 May 2008 9:28 AM To: Page, Kevin (Bisbane) Subject: Water Supply Retic Analysis Boundary Conditions Cardno (Qld) Pty Ltd | ABN 57 051 074 992 Level 1, 9 Maud St Maroochydore Qld 4558 Ca rianio PO Box 152, Maroochydore QLD 4558 Tel: 07 54432555 | Fax: 07 $443 5642 eae Kevin As discussed, we are undertaking a Water Supply Reticulation Analysis for Blue Care, a not for profit organisation who are developing an aged care facility in association with the Sunshine Coast Regional Council (Noosa Council). The site location is highlighted in the attached Locality Plan. The Equivalent Person demand of the site is approximately 5SOEP. There is a DN200 trunk main running along Ben Lexcen Dr which I'm told has spare capacity. We are after a Peak Hour HGL at the corner of Ben Lexcen Dr and Grasstree Ct to adopt as a boundary condition for the analysis. Can you provide this? Please call if you have any queries. Regards, Anthony. Anthony Morris 1
Page 12
Water Supply and Sewerage Engineer For Cardno (QId) Pty Ltd a el The infarmation contained in this email and any attached files is strictly private and confidential and Cardno do not warrant the accuracy of information supplied electronically. The intended recipient of this email may only use, reproduce, disclose or distribute the information contained in this email and any attached files with Cardno's permission and should undertake an examination of electronically supplied data against an applicable hard copy version which shall be the only document for which Cardno warrants accuracy. If you are not the The . intended recipient, you are strictly prohibited from using, reproducing, adapting, disclosing or distributing the ies enguatty information contained in this email and any attached files or taking any action in retiance on it. If you have ace Company received this email in error, please email the sender by replying to this message, promptly delete and destroy Australia ISO9001 Ger ez any copies of this email and any attachments. Virus scanning software is used by this organisation to prevent file and system attacks, however the recipient is responsible for their own virus protection. Cardno accepts no liability whatsoever for any possible subsequent loss or damage arising from the use of this data or any part thereof. NOD32 3076 (20080505) Information This message was checked by NOD32 antivirus system. http://www.eset.com *** WORLEYPARSONS GROUP NOTICE *** "This email is confidential. If you are not the intended recipient, you must not disclose or use the information contained in it. If you have received this email in error, please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the views or opinions of any company in the WorleyParsons Group of Companies.” NOD32 3076 (20080505) Information This message was checked by NOD32 antivirus system. http://www.eset.com *** WORLEYPARSONS GROUP NOTICE *** “This email is confidential. If you are not the intended recipient, you must not disclose or use the information contained in it. If you have received this email in error, please notify us immediately by return email and delete the email and any attachments. Any personal views or opinions expressed by the writer may not necessarily reflect the views or opinions of any company in the WorleyParsons Group of Companies.” NOD32 3080 (20080506) Information This message was checked by NOD32 antivirus system. http://www.eset.com
Page 13
eS Chapter,5— Bioretention Basins
Asset ILD.
Basin Location:
Hydrautics: Minor Flood (m/s) Major Flood ims):
Area: Catchment Area (ha): 'Bioretention Area (ha):
TREATMENT . . Y iN
Treatment performance verified from curves?
BIORETENTION MEDIA AND UNDER-DRAINAGE . Y IN
Design documents bioretention area and extended detention depth as defined by treatment performance requirements.
Overall flaw conveyance system sufficient for design fload event(s)?
Where required, bypass sufficient for conveyance of design flood event?
Where required scour protection provided at inflow point to bioretention?
Bioretention media specification includes details of filter media, drainage layer and transiton layer {if required)?
Design saturated hydraulic conductivity included in specification?
Transition layer provided where drainage tayer consists of gravel (rather than coarse sand)?
Perforated pipe capacity > infittration capacity of filter media?
Selected filter media hydraulic conductivity > 10 x hydraulic conductivity of surrounding soil?
Liner provided if selected filter media hydraulic conductivity < 10 x hydraulic conductivity of surrounding soil?
Maximum spacing of collection pipes <1.5m?
Collection pipes extended to surface to aliow inspection and flushing?
“Maximum upstream flood conveyance complies with QUOM?
“Overflow pit has set down of at least 50mm below kerb invert? (where conventional gullyAintel used downstream of
bioretention then no overflow pit required)
BASIN . ° “ly N
Bioretantion area and extended detention depth documented to satisfy treatment requirements?
‘Overtlow pit crest set at top of extended detention?
Maximum ponding depth will not impact on pubiic safety?
Maintenance access provided to surface of bioretention system (for larger systems)?
Protection from coarse sediments provided (where required) with a sediment forebay?
Protection from gross pollutants provided {where required)?
LANDSCAPE : . Y “IN
Plant species selected can tolerate extended dry periods, periodic inundation and design velocities?
Bioretention design and piant species selected integrate with surrounding landscape or built environment design?
*Pianting design conforms with acceptable sight line and safety requirements?
COMMENTS
*Streetscape application only
Ti
Pe sine
<1 WSUD Technical Design Guidelines for South East Queensland - Version 1 June 2006 5-28
Page 14
2 8
Inspected By:
Site:
i. Aw
Constructed By:
During Visit:
rh meng fo et
DURING CONSTRUCTION & ESTABLISHMENT == . ;
AL FUNCTIONAL INSTALLATION : Structural components
Preliminary Works tesa and configuration of inflow systems as
apse” and sediment contro! plan 16. Location and levels of overflow pits as designed
17, Under-drainage connected to overflow pits as
2. Temporary traffic/safety control measures designed
3. Location same as plans 18. Concrete and reinforcement as designed
19. Set down to correct level for flush kerbs
{streetscape applications only)
Earthworks and Filter Media 20. Kerb opening width as designed
4. Site protection from existing flows.
5. Bed of basin correct shape and slope
6. Batter slopes as plans B. SEDIMENT & EROSION CONTROL {IF REQUIRED)
21. Stabilisation immediately following earthworks
and planting of terrestrial landscape around basin
8. Confirm surrounding soil type with design 22. Silt fences and traffic control in place
9. Confirm filter media specification in
accordance with Step 4
9, Provision of liner {if required}
7. Dimensions of dioretention area as plans
23. Temporary protection tayers in place
10. Under-drainage installed as designed C. OPERATIONAL ESTABLISHMENT
. 7 . 24. Temporary protection layers and associated silt
11, Drainage layer media as designed removed
12. Transition layer media as designed lif .
tequired) Vege
14, Extended detention depth as designed 25. Planting as designed (species and densities)
26. Weed removal and watering as required
FINAL INSPECTION « a * ~ ty . . Sy
4. Confirm levels of inlets and outlets 6. Check for uneven settling of banks
2. Confirm structural element sizes 7. Under-drainage working
3. Check batter slopes 8. Inflow systems working
4. Vegetation as designed 9. Maintenance sccess provided
5. Bioretention filter media surface flat and
free of clogging
COMMENTS ON INSPECTION - - ee Lo : og :
ACTIONS REQUIRED ~ . . “ . vrs e
Inspection officer signature:
EES WSUD Technical Design Guidelines for South East Queensland - Version | June 2006 8-29
Page 15
Chapter, 5 —
BIOR
Inspection 1 to 6 monthly
Location: = -
Description: |;
LD.
Site Visit by: . «
INSPECTION ITEMS: . i
Sediment accumulation at inflow points?
Litter within basin?
Erosion at inlet or other key structures?
‘raffic damage present?
Evidence of dumping (e.g. buitding waste)?
Vegetation condition satisfactory (density, weeds etc)?
Watering of vegetation required?
Replanting required?
Mowing/slashing required?
Clogging of drainage points {sediment or debris}?
Evidence of ponding?
Oamage/vandalism to structures present?
Surface clogging visible?
Drainage system inspected?
Resetting of system required?
COMMENTS
.|Action Required (details)
Eas WSUD Technical Design Guidelines for South East Queensland ~ Version 1 June 2006
Page 16
wt Page 1 of 2 From: Ahern Lyn [[email protected]] Sent: Wednesday, 23 April 2008 1:50 PM To: [email protected] Subject: Cultural Heritage Search - 6 RP901384, 5 RP8790947, 1 SP177650 | refer to your application in which you requested advice on Aboriginal cultural heritage places recorded on the above location. | wish to advise that the search has been performed on the inventory of recorded Aboriginal sites as per your description. Attached is a list which highlights the identified Aboriginal cultural heritage sites, as recorded for the search area. However, it is not possible to conclusively guarantee the accuracy of these recordings (in particular, the longitude and latitude location description for each site) and extra diligence is required when operating in these locations. Site [D Latitude Longitude Attribute IKC:E89 -26.41289 _153.090301/SHELL MIDDEN All significant Aboriginal cultural heritage in Queensland is protected under the Aboriginal Cultural Heritage Act 2003, and penalty provisions apply for any unauthorized harm. Under the legislation a person carrying out an activity must take all reasonable and practical measures to ensure the activity does not harm Aboriginal Cultural Heritage. This applies whether or not such places are recorded in an official register and whether or not they are located in, on or under private land. Aboriginal cultural heritage, which may occur on the subject property, is protected under the terms of the Aboriginal Cultural Heritage Act 2003 even if Natural Resources & Water has no records relating to it. Please refer to our website www.nrw.qid.gov.au/cultural_heritage/index.html for a copy of the gazetted Cultural Heritage duty of care guidelines, which set out reasonable and practical measures for meeting the duty of care. In order to meet your duty of care, any land use activity within the vicinity of the recorded cultural heritage, should not proceed without the agreement of the Aboriginal Party for the area or a Cultural Heritage Management Plan undertaken pursuant to Part 7 of the Aboriginal Cultural Heritage Act 2003. The Aboriginal party for the area is: QC99/35 - Q6034/99 Gubbi Gubbi Peopie #2 Ms Eve Fesl 29 Fountain Rd BURPENGARY QLD 4505 0419 023 610 Should you have any further queries, please do not hesitate to contact me on (07) 3238 3839. Kind Regards Lyn Ahern A/Policy Officer | Cultural Heritage Coordination Unit Department of Natural Resources and Water Level 5 Landcentre | Cnr Main & Vulture Sts | Gabba Q 4102 P 323 83839 | F 323 83842 | www.nrw.gld.gov.au 19/11/2008 pay ed ee Te
Page 17
The information in this email together with any attachments is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any form of review, disclosure, modification, distribution and/or publication of this email message is prohibited, unless. as a necessary part of Departmental business. If you have received this message in error, you are asked to inform the sender as quickly as possible and delete this message and any copies of this message from your computer and/or your computer system network. ates renee 19/11/2008 Page 2 of 2
Page 18
iy a -26.412898153.090301 . ro Le? ROLL Pee tera ke kets) TEPC Me COMA eu) iran
Page 19
2 BlueCare Head Office 56 Sylvan Road Toowong Q. 4064 PO Box 1539 24 November 2008 Milton Q. 4064 P: 07 3377 3377 F: 07 3377 3366 £: [email protected] Drew Westbrook www. bluecare.org.au JB Goodwin Midson & Partners 1/12 Technology Drive Warana Qld 4575 Dear Drew DA for ROL (1 into 2) and MCU (Retirement and Special Needs) at Grasstree Court Sunrise Beach Q 4567 (Council ref: 2008/1128) In response to Sunshine Coast Regional Council's letter of 11 August 2008 requesting further information in regard to the above development application, please find attached a table indicating intended staff numbers for each of the care related services on site. Yours sincerel Louise Thorp Project Manager Blue Care Property Development Unit Ormmay Queensiand » Blue Nursing « Respite Services « Residential Aged Care Services » Community Aged Care Packages » Extended Aged Care in the Home » Allied Health Services « Disability Services » Education Services * Carer Support Services » Pastoral Care & Support » Volunteer Services « Specialist Advisory Services » Palliative Care » Independent Living Units
Page 20
Estimated Number of Biue Care Employees staff Location Discipline Details no work hrs Residential Aged Care Facility (RAC) | RAC - admin/gen | Residential administration 2 | 9am-5pm RSO 1 | 8am-4pm WHSO (part time on site) 1 | 8am-4pm DON 1 | 8am-4pm Chaplain (part time on site) 1 Reception 1 | 9am-5pm Maintenance 1 | 8am-4pm RAC - care AIN 13 | 7am-3pm AIN - shift 9 | 3pm-11pm AIN - shift 4 | 11pm-7am CNC 1 | 9am-5pm EEN/RN 3 | 7am-3pm EEN/RN - shift 3 | 3pm-11pm EEN/RN - shift 1 | 11pm-7am DT 1 | 8am-4pm Activities officers 3 | 8am-4pm Hospitality Meals 4 | 6am-2pm Meals - shift 2 | 4pm-8pm Hospitality Manager 1 | 8am-Spm Kitchen manager 1 | Gam-2pm Cleaning 4 | 7am-3pm Laundry 2 | 6am-2pm Allied Health Clinics 2 | 8am-4pm AH staff (professionals & assistants) 4 | 8am-4pm Community Nurses (part time on Community _ site) 5 | 7am-3pm Respite Staff 5 | 8am-4pm TOTALS 76 Page 2 of 2
Page 21
LandGraphics Landscape Architects Principal: Robert J. Burrell B.Sc. G.D.LA. AA.LL.A. A.U.D.LA. Studio Location: 104 Camp Flat Road, Bli Bli, Qld 4560 Correspondence: P.O. Box 18 Maroochydore 4558 Qld. Australia Telephone (07) 5450 8088 Facsimile (07) 5450 8077 Email: anthony@!andgraphics.com.au LAND GRAPHICS 29 September 2008 Attn: Tracy Jones Sunshine Coast Regional Council PO Box 141 TEWANTIN Q 4565 Dear Tracy RE: APPLICATION NO:2008/1128. MATERIAL CHANGE OF USE FOR MULTIPLE HOUSING TYPE 2 RETIREMENT & SPECIAL NEEDS, COMMERCIAL BUSINESS TYPE 2 MEDICAL & WELLBEING 1 HEALTH — 2 GRASSTREE COURT, SUNRISE BEACH | refer to items 21 and 22 of Councils Information Request for the abovementioned development dated 11 August. We have considered Council request and provide the following information in regard to bushfire mitigation for the proposed development. This response should be read in conjunction with the submitted plans and the Bushfire Assessment Report Issue 8 prepared for the development by LandGraphics. Item 21- Mapping of Bushfire Mitigation Measures Please find attached a map of the development which illustrates the locations of the various bushfire mitigation measures that can be illustrated spatially. Item 22 — Standard of Fire Trails Fire trails on the development should be constructed to the following standard: A minimum carriageway width of 4m; At least one passing bay along each section of trail with a minimum width of 6m; e Is made of regularly mowed turf or material which is trafficable by 4wd vehicles at all times; Crossfall is not more than 10 degrees; Maximum grade is 10 degrees; All corners allow for turning of a medium rigid vehicle; and The trails are unobstructed by landscaping including a minimum vertical clearance of 4m to any over-hanging obstructions such as tree branches.
Page 22
These details should be demonstrated at the time of Operational Works (Engineering) application and could be easily achieved in the development. In relation to Queensland Fire and Rescue Service (QFRS) fire trail standards, The QFRS does not have a standard of fire trail construction to the authors knowledge. This is due in most part as the QFRS is not a land management organisation and does not control bushfire prone lands. The standards of fire trail construction are the responsibility of the various land owners. Standards between organisation can vary. The existing fire trails in the National Park are the responsibility of the Queenstand Parks and Wildlife Service. QPWS would manage the trails in accordance with their own standards and objectives. As stated in the bushfire assessment report QPWS should be encouraged to maintain the trails annually and especially prior to each fire season. The trails have been used successfully in the past by the fire service (Noosa Fire Station. (Pers. Comm.). To assist in understanding how the trails may be used and by what equipment, a poster sheet has been prepared which illustrates the key concepts of their use in bushfire mitigation. The concept of the ‘fire controi line’ is critical. The trails within the development provided they are constructed to the abovementioned specification will be of a suitable standard to assist in an adequate QFRS response. With Kind Regards, ANTHONY POWER BUSHFIRE SPECIALIST / ENVIRONMENTAL PLANNER LandGraphics Landscape Architects a
Page 23
a Fire Breaks to National Park. Minimum 10m as per section3.1 of the Bushfire Report. Please note that some landscaping is allowed within these breaks as per section 3.10 of the bushfire assessment report. a f LAND GRAPHICS Grassed Fire Truck Access 4WD Fire Vehicle Fire Trail Connection to Existing Ped Fire Trail Network in National Park. Existing Fire Trail Network (ean Hydrants to be located on southern and western side of this road in accordance with Australian Standards. Hydrants on this side prevent hoses being laid across road where they can be otherwise run over by vehicles. Building which is to be fitted with First Aid Fire Fighting Hose fitted to external building wall to ex- tinguish any spot fires as per section 3.8 of the Bush- fire Assessment Report. Clear Estate Signage Buildings are to be constructed to AS3959 as outlined in bushfire assessment report. FIRE BREAK & FIRE TRAIL LOCATION MAP—BLUECARE, GRASS TREE COURT SUNRISE BEACH
Page 24
GRASS TRAILS CAN BE USED A ‘CONTROL LINES’ TO ALLOW
FIRE FIGHTERS WITH APPLICANCES TO CONTROL ‘BACKING
FIRES’ LIT TOWARDS MAIN WILDFIRE OR
UNDERTAKE PRESCRIBED BURNING OPERATIONS OR
‘DIRECT ATTACK TECHNIQUE ON SMALL WILDFIRES
static
. " <
AND GRAPHICS
POSSIBLE FIRE FIGHTING STRATEGIES
The fire mitigation measures outlined in the bushfire assessment
report enable fire fighters to undertake the following possible fire
fighting responses to a wildfire threatening the development.
Direct Attack
This strategy involves fire fighters working directly on the fire line
typically using wet fire fighting methods such as the application of
water or foam. Direct Attack can generally only be used on low
intensity fires (i.e. below 4,000kW/m). The fire break and access
on the southern and western boundaries enable fire fighters
to easily use this technique as the fire approaches
Indirect Attack
In an indirect attack back burning is used as a method of suppres-
sion to control the fire within a defined area or boundary bounded
by existing or prepared fire control lines. Indirect attack is a likely
bushfire strategy used in this development if the development
was threatened. Existing fire control lines in the National Park may
be used for this purpose as an alternative to the trails provided in
this development. The figure to the left indicates how this may
occur.
Observe and Patrol
The observe and patrol technique involves fire fighters stepping
back from the main fire front, observing fire behavior and patrol-
ling for spot fires. This technique is used when the fire front is too
intense for an offensive technique. This is sometimes referred to
as an ‘ember defense’ or ‘backstop defense’. When the fire front
Passes crews re-enter the affected area and extinguish small spot
fires with a preference for preventing involvement of savable
property. The first aid firefighting and a prepared staff would also
ist in this fire fighting technique. Construction of bi ngs to
Australian Standards greatly increases the resilience of buildings
making this technique much easier to u
EXISTING TRAILS
The Queensland Fire and Rescue Service does not have a fire trail construction standard. Fire Trails in National Park s are constructed and maintained by the Queensland
Parks and Wildlife Service (QPWS). In this regard existing trails in the National Park and their condition are the responsibility of QPWS.
Communication with Noosa Urban Fire Station in June indicated that the existing trails in the National Park have been used by Fire Service vehicles with success in previ-
ous years. The existing trails within Council land on the western side of houses on Ben Lexcen Drive are in very good condition and could also be accessed by 2WD vehi-
cles.
As outlined in the Bushfire Assessment Report QPWS should be encouraged to maintain the trails annually and especially before each fire season. This may
involve slashing or grading the trails to clear any heath and or weeds that have colonized the trails.
VEHICLES OF THE QFRS
The following ve
of these vehicles could access the ex
use.
les are common 4WD fire fighting appliances used on the Sunshine Coast. All
ing trails in the National Park and are designed for off road
The Medium Response and Light Response vehicles belong to Rural Fire Brigades while the Urban
Pumper Tanker typically belong to Professional Urban or Auxiliary Brigades. 2WD drive tankers
are unsuitable for unsealed roads and would be employed along internal roads only, hoses from
these vehicles would be run along the side boundaries of buildings to their southern and western
sides.
Hoses may be connected directly to hydrants. Hydrants are also used as a water source to refill
tankers.
Medium Response Vehicle
Make | Isuzu
Weight | 6000kg
6000mm
Length
Water
Make Nissan Patrol
Weight 3700kg
Length 5300mm
Height 220mm
Width 1930mm
“Water =| G00 ites
Capacily (Nominal)
Pump Davey Twin Impeller
Urban Pumper Tanker 4x4 Medium
(Type 2)
Make Isuzu FTS750 |
Weight 13,000ka |
Length 7800mm |
Height | 3300mm _
Width 2460mm |
Walter Capacity 2000 litres
~ Pump a ___|__Hatz/Rosenbauer -
100 lives —_
Page 25
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request ARUP
Page 26
Arup Arup Pty Ltd ABN 18 000 966 165 Arup Level 4 108 Wickham Street, Fortitude Valley QLD 4006, GPO Box 685 Brisbane QLD 4001 Tel +61 7 3023 6000 Fax +61 7 3023 6023 www.arup.com Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request October 2008 This report takes into account the particular instructions and requirements of our client. it is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party Job number 86512/66
Page 27
TITLE\FINALIO004REPORT_RFI_V2.DOC Slue Care Sunrise Beach Response to Sunshine Coast Regional Counc! information Request Contents Page 1 Introduction 3 1.1 Limits of Report 3 1.2 Safety in Design 3 2 Car Parking / Access 4 2.1 Emptoyee Numbers 4 2.2 Parking for Different Uses 5 2.3 Emergency Vehicle Parking 6 3 External Traffic Generation . 7 3.1 Background Data and Assumptions 7 3.2 Intersection Anatysis 12 3.3 Summary 16 4 Internal Traffic Generation and Vehicular Access 17 4.1 Circulating Roadway Design 17 4.2 Service Vehicle Access 17 43 ILU Villa Driveways 18 § Car Parking 19 5.1 User Class and Dimensions 19 5.2 Design/Layout 20 5.3 Disabled Parking 20 5.4 Sightlines 20 6 Conclusion 21 Appendices Appendix A Sunshine Coast Regional Council Information Request Appendix B Proposed Development Plans Appendix C Traffic Impact Assessment Report Appendix D Predicted Eenie Creek Road Traffic Volumes Appendix E - Intersection Count Volumes Appendix F Swept Path Analyses J:\88000\86512\66\OOCUMENTSIREPORTSIREPORT Amp 15 October 2008
Page 28
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request Appendix G Typical Sightline JNS60001865 12\66\D OCUMENTS\REPORTSIREPORT Anp TITLE\FINAL\GOO4REPORT_RFI_V2.DOC 15 Octobar 2008
Page 29
Blue Care Sunshine Beach Response to Sunshine Coat Regional Council. Information Request 1 Introduction Arup was commissioned by Blue Care in.April 2008 to undertake a traffic impact assessment for the proposed Blue Care Facility to be located at Grasstree Court (and Ben Lexcen Drive), Sunrise Beach. Arup subsequently provided a Traffic Impact Assessment report, included as part of the development application. Upon review of this application, Sunshine Coast Regional Council has issued an Information Request, dated 11 August 2008. This document is included as Appendix A. Queries with the application relating to traffic and Arup’s Traffic Impact Assessment report were raised in items 13-14, 47-52, 53-58 and 59-64 of Council's Information Request. This report offers response to these issues. The plans for the development have been revised since submission of the development apptication. The revised plans, amended to reflect issues raised by Council in the Information Request, are included as Appendix B. Please refer to Arup’s Traffic impact Assessment Report, dated 24 Juné 2008 (included as Appendix C) for any traffic engineering issues relating to the proposed development not discussed in this report. 1.1 Limits of Report The above tasks have been carried out based on information supplied by other members of the project team. While Arup has taken care in the preparation of this report, it neither accepts liability nor responsibility whatsoever in respect of: — any use of this report by any third party; and — any third party whose interests may be affected by any decision made regarding the contents of this report. 1.2 Safety in Design Within the scope of our design activities, we have identified safety in design issues and potential hazards, whenever reasonably practicable within our field of expertise. Due to our limited and upfront rote on this project, it is not considered reasonably practicable to identify all potential hazards which may occur throughout the life of a project, including during construction activities. For any ensuing design stages, it is strongly recommended our advice regarding safety in design be reviewed and revised as required, to reflect any changes to the current design. JASBOOO\ES1Z\66\IOOCUMENTS\REPORTSIREPORT Page 3 Arup TITLEAFINAL\OO04REPORT_RFI_V2.00C 15 October 2008
Page 30
Blue Care Sunshine Beach Response to Sunshine Coat Regional Council Information Request Car Parking / Access This section responds to items 13 and 14 of Sunshine Coast Regional Council's Information Request, included as Appendix A. 2.1 Employee Numbers The following table, provided by Blue Care, outlines the staff numbers expected for the “proposed development. It also indicates what times the staff are expected on site. Table:2.1 —- Breakdown of Staff Numbers PROPOSED DEVELOPMENT STAFFING NUMBERS Bulldi Residential ILU Recreation Care Discipline RAC - Allied Heatth Commu: LU Details Residential administration RSO WHSO time on site) DON time on Maintenance AIN AIN- AIN - EEN/RN - OT officers Meals - shift Kitchen & assistants: Nurses time on site: Administration / Sales Café staff Café staff - shift Carers Staff No IND fa fa J fa fa fon don fe |r [rm [a Jo Jo [ro fo 7 o Work Hrs 9gam-' 8am-4, JN36000\85512\66\DOCUMENTS\REPORTSIREPORT TITLE\FINALIOOO4REPORT_RFI_V2.D0C Page 4 Arup 15 October 2008
Page 31
Blue Care Sunshine Beach Response to Sunshine Coat Regional Council Information Request 2.2 Parking for Different Uses Table 2.2, below, indicates the required parking numbers for the development. Component Use Quantity Suggested Required Parking Rate. Carparks RAC High Care Beds 98 beds i per 5 beds 20 Employees 60 staff 1 per 2 staff 30 Independent Living Unit Villas Residents 54 units 1 per unit 54 Visitors 54 units 4 per 4 units 14 Independent Living Unit Residents 54 units 1 per unit 54 Apartments Visitors $4 units 4 per 4 units 14 Serviced Apartments/Central Residents 20 units A per 4 units 5 Facilities Visitors 20 units iper4units 5 : Employees 9 staff 1 per 2 staff TOTAL REQUIRED _ 206 Suggested parking rates are based on those specified in the Noosa Planning Scheme, except for parking rates associated with the serviced apartment facilities which are not identified in the Noosa Planning Scheme. We have adopted parking rates of 1 bay per 4 units for residents and visitors based on the requirements of the Caloundra City Council and our previous experience on similar sites. The plans included as Appendix B include a masterplan layout showing colour-coded parking allocations for each of the different uses. The plan provides.a total of 286 parking bays, which is in excess of Council's requirements. The parking provisions allocated for each of the individual uses is as outlined below. The on-street car parks shown on GrassTree Court on the submitted plans have been removed from the plan. 2.2.4 Residential Aged Care As indicated on the colour.coded masterplan the following parking provisions are provided for the residential aged care facility: + 54 parking bays for staff (30 are required). These are provided in 90 degree-angle parking bays adjacent to RAC serving area and in the RAC building basement; and + 20 parking bays for visitors (20 are required). These are provided in 90 degree angle parking bays adjacent to RAC building and in the RAC building basement. 2.2.2 Independent Living Unit Villas As indicated on the colour coded masterplan the following parking provisions are provided for the independent living units: * 75 parking bays for residents (54 are required). These are provided in private garages, adjoining the villa; ¢ 30 parking bays for visitors (14 are required). These are provided.in both 90 degree angle bays and informal parallel on street parking in front of each villa. 2.2.3 Independent Living Unit Apartments . As indicated onthe colour.coded masterptan the following parking provisions are provided for the independent living. units: « 65 parking bays for residents (54 are required). These are provided in the basement carpark, underneath the apartment buildings; « 17 parking bays for visitors (14 are required). These are provided in both 90 degree angle bays located in front of the apartment buildings and in the basement carparks. J:\86000\86512\66\1DOCUMENTS\REPORTS\REPORT Page 5 Arup TITLE\FINAL\OOO4REPORT_RFI_V2.00C . 1 October 2008
Page 32
Blue Care . Sunshine Beach Response to Sunshine Coat Regionai Council Information Request 2.2.4 Central Facilities/Serviced Apartments As indicated on the colour coded masterplan the following parking provisions are provided for the central facilities building/serviced apartments: + Sparking bays for staff (5 are required). These are provided in 90 degree angle parking bays adjacent to central facility; and + 7 parking bays for residents (5 are required). These are provided in the basement of each apartment; and * 16 parking bays for visitors (5 are required). These are provided in 90 degree angle bays adjacent to the building. 2.3 Emergency Vehicle Parking Emergency vehicle parking facilities are provided for each of the different use areas. For the central facilities and serviced apartments, emergency vehicles will stop in the set down area (under the porte cochere) in front of the central activities area. This is indicate on the parking plan included in Appendix B. For the Residential Aged Care facility, parking for emergency vehicles is also on the porte cochere, located in the parking area in front of the main entrance to the residential aged care building. For the Independent Living Unit villas and apartments, emergency vehicles can stop on the circulation road near the appropriate dwelling (or the driveway), as would happen in normal suburban street situations. 44860001865 12\661DOCUMENTSIREPORTSIREPORT Page 6 Arup TITLEVFINALWO04REPORT_RFI_V2.D0C 15 October 2008
Page 33
Blue Care Sunshine Beach Response to Sunshine Coat Regional Council Information Request External Traffic Generation This section responds to items 47 to 52 of Sunshine Coast Regional Council's Information Request, included as Appendix A. 3.1 Background Data and Assumptions Assumptions used for the analysis included in Arup’s Traffic Impact Assessment Report, dated 24 June 2008 (included as Appendix C) are used in the following analysis unless otherwise specified. 3.1.1 Eenie Creek Road Traffic Distribution Council provided a summary of the predicted traffic volumes for the Ben Lexcen Drive/Eenie Creek Road/Heathland Drive, as determined by Maunsell. This is included as Appendix D. These volumes have been used in lieu of traffic count volumes in our SIDRA analysis of this intersection. 3.1.2 Development Traffic Distribution _ The assumed distributions of traffic from the site are unchanged from our previous report (included as Appendix C), with the exception of the Eenie Creek Road intersection. The new origin Destination sptit of the development traffic to the north is based on the traffic volumes provided by council and is as follows: ¢ — Arriving traffic: - 32% from West (Eenie Creek Road) - 34% from ‘North (Ben'Lexcen Drive) - 34% from South (Heathland Drive) + Departing traffic - 61% to West (Eenie Creek Road) -36% to North (Ben Lexcen Drive) - 3% to South (Heathiand Drive) This results in a traffic distribution as shown in Figure 3.1.2, over page. JN8B000\865 1 2166\DOCUMENTSIREPORTS\REPORT Page 7 TITLE\FINALIOOO4REPORT_RFI_V2.00C Arup 15 October 2008
Page 34
DOGZA 14N LYOdINPOCOTWNIAIS LLL. LHOdAMS LUOSMSLNANNOOMIS bsgeio00as:t
8002 eQ0KO SE NEO
dy 9 abeg
uoHNG ASIC Dyer, JUsWdoOjaAaq — Z"L'¢ eunBy4
[ang vordhy
.o—
zh os 8 0
uo ire} {
(enna uae e}-——sp-—F =P Peo aT
0 0 Q e 0 je— Oz g
— 6G
[unog uaaneiig|
dvd swe L
. Ln] o_3
7 0
9 t os w—y]o ao ¢ Oo
J u 93 Ole ob | -
BAUQ UdXxe7 Ueg = t © 0 a r Pye o 7 T r P feo (apg vez veg)
9 0 9 4 0 g oO j—— 6 6z é a 0 jt 0
Ob tm 9 j—— 0
8h ce
Lunog vasmen 9] L_pneg 204, sseig]
INV
jsanbey uoReuuoyut oun? jeuoiBey seo aulysung 0} ssuodsay
yoeag esuuns
Weed iy - UOREIaWsD sues) jUSUdOpN g
aueg ong
Page 35
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request 3.1.3 Annual Traffic Growth Rate The information provided by Council, included as Appendix D, also referred to an annual growth rate of 0.75%. We have adopted this compounding growth rate for our analysis. 3.1.4 Intersections Considered (5% rule) Figure 3.1.4, over page, shows the percentage increase caused by development traffic in 2022 for individual road links. This figure indicates that the percent of development traffic in the AM and PM peaks on all of the legs exiting the considered network are generally within 5%. Therefore the impact on the next intersection will be minimal (less than 5% of the approach). Although some minor movements beyond the network depicted are shown to be more than 5%, this represents between only 5 and 15 vehicles (or one vehicle every 4 to 12 minutes) which will easily be absorbed by the road network. Therefore the intersections considered in our analysis are the same as in our previous report. These are: + Bex Lexcen Drive, Grasstree Court and Litpon Court; « Ben Lexcen Drive and Girraween Court; + Ben.Lexcen Drive, Heathland Drive and Eenie Creek Road, Aged care facilities by. their nature are very low traffic generators. This is self evident from Figure 3.1.2. Notwithstanding this we have still completed intersection analysis using SIDRA 3.2. The results of which are included in Section 3.2 of this report. JABBO00186512\6E\DOCUMENTSIREPORTSIREPORT Page 9 ‘Arup TITLE\FINALO004REPORT_RFI_V2.D0C Draft 1 15 October 2008
Page 36
Blue Care Sunrise Beach
Response to Sunshine Coast Regional Council information Request
a crease = AM ARUP
Gress Tree Cont ae
Lipton Street
Development Traffic Increase - PM Peak
wraween Court
t 19% t 0%
59% 4 0%
11% —» 10% — 6% — %—
—______fiizandive]
— 4% — 16% — 12% — %
{ 9%
32% J [(N }-———
Figure 3.1.4 — Percentage Development Traffic on Surrounding Road Network
JA860001885 1 2\66\DOCUMENTSIREPORTS\REPORT TITLE\FINALWO04REPORT_RFI_V2.D0C Page 410
Arup
Draft 15 October 2008
Page 37
Blue Care Sunrise Beach Response to Sunshine Coast Regiona! Council information Request 3.1.5 Service Road from Ben Lexcen Drive to Grasstree Court A traffic count was conducted by Austraffic on Wednesday 18 Jun 2008 to measure the existing traffic using this service road during peak periods. The turning movements into the service road are shown in Table 3.1.5 below. The full count data is included in Appendix E. Table 3.1.5 —- One-way Service Road Traffic Turns from Ben Lexcen Drive into Service Road 7 AM | PM From South (left turn) 0 0 From North (right turn) 4 2 This count showed that no cars turned left into this service road in either the AM or PM peak period. There were 4 and 2 right turning vehicles in the AM and PM periods, respectively. Due to the very low volumes using this service road, if this service road were to be removed, the roundabout at Lipton Street would easily be able to absorb these few right turning vehicles. For completeness, they have been included in the volumes entered into our SIDRA analysis for the right turn movement from Ben Lexcen Drive southbound into Grasstree Court. As shown in section 3.2.1, below, the Ben Lexcen Drive/Grasstree Court/Lipton Court roundabout operates well within Council's required limits of operation to the 2022 design year, Although the inclusion of a two-way service road linking Grasstree Court and Ben Lexcen Drive may result in a better performance of this roundabout, the intersection analysis indicates that this tink is unnecessary. Ultimately, it is a decision for Council to determine if the service road is to be reinstated. It is an unreasonable request by Council to suggest that the applicant retain this link on their site and dedicate the land to Council. The traffic survey by Austraffic clearly demonstrates that this link is redundant and under-utilised. Furthermore, this application is in no way dependant upon this link to support the proposed development. JAB6000\86512\G5\DOCUMENTS\REPORTS\REPORT Page 11 TITLE\FINALIOOO4REPORT_RFI_V2.D0C Arup Drafi1 18 October 2008
Page 38
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request 3.2 Intersection Analysis The intersections have been analysed using SIDRA Intersection 3.2 for the 2022 design year, for both background traffic (without development) and design traffic (with development). Comparison of these two scenarios will determine the impact the development will have on the local traffic network. It has been assumed that the layout of the intersections will remain unchanged from 2008 to 2022. The results of the SIDRA analysis the intersections being considered have been summarised in tabular form below. Each table makes reference to three intersection performance criteria. A description of each follows: Degree of Saturation (%) — This is the ratio of demand flow to capacity. Average Delay (sec) — The average delay per vehicle in seconds incurred by vehicles over the modelled time period. 95" %ile Queue—A queue length measured in metres for which only 5% of queues are equal to or greater than this length. Sunshine Coast Regional Council has specified that roundabouts in the Noosa region require a maximum degree of saturation of 0.7. Whilst this is an unusual request, it has been taken into account in our analysis. JABBOOO\SES12\66\DOCUMENTS\REPORTSIREPORT Page 12 Arup TITLE\FINALWOO04REPORT_RFI_V2.00C Draft 1 15 October 2003
Page 39
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request 3.2.1. Ben Lexcen Drive, Grasstree Court and Lipton Drive This intersection was analysed with and without the proposed development for the 2022 design year in both the AM and PM peak period. It has been assumed the existing service toad between Ben Lexcen Drive and Grasstree Court will be closed and traffic associated with the service road has been included in this analysis. Table 3.2.1a — Intersection Analysis Results 2022 AM Peak +2022 AM Intersection Analysis Results Background Volumes Design Volumes Approach Direction Movement DOS (%) | Queue Delay (s) | DOS (%) |} Queue Delay (s) (m) (m) Ben Lexcen | N/B L 27 14 8 29 16 8 Drive T 27 14 7 29 16 7 : -R 29 14 14 29 16 14 Grasstree WB L 4 2 8 5 2 8 Court T 4 2 7 5 2 7 R 4 2 13 5 2 13 Ben Lexcen |. S/B L 24 14 6 26 16. 7 Drive T 24 14 6 26 16 | 4 R 24 14 12 26 16 12 Lipton eB L 9 4 8 14 7 8 Street T 9 4 7 14 7 7 R 9 4 13 14 7 13 Table 3.2.1b — intersection Results 2022 PM Peak 2022 PM Intersection Results Volumes * in Volumes Approach Direction Movement DOS (%) | Queue Delay (s) | DOS (%) | Queue Delay (s) m ™m) Ben Lexcen | N/B 11 13 Drive Court FF 1 1 13 We 3 4 4 4 Lexcen 1 Drive Lipton Street 21 1 7 7 17 12 The above results indicate that the operation of the intersection will not be adversely affected by the development in the 2022 design year. With the removal of the one-way service road between Grasstree Court and Ben Lexcen Drive the-intersection will still operate well within Council’s required degree of saturation. of 70%. The intersection operates comfortably with negligible delays, queuing etc. J:\86000\86512\66\DOCUMENTSIREPORTSIREPORT. Page 13 TITLE\FINALIOOO4REPORT_RFI_V2.D0C Arup Draft t 18 October 2008
Page 40
Blue Care
3.2.2
Ben Lexcen Drive and Girraween Court
Sunrise Beach
Response to Sunshine Coast Regional Council information Request
This intersection was analysed with and without the proposed development for the 2022
design year in both the AM and PM peak period.
Table 3.2.2a — Intersection Analysis Results 2022 AM Peak
2022 AM Intersection Analysis Results Background Volumes Design Volumes
Approach Direction Movement DOS (%) | Queue Delay (s) { DOS (%) | Queue Delay (s)
(m) (™)
Ben Lexcen | N/B L 36 20 9 38 22 9
Drive Tt 36 20 7 38 22 7
Ben Lexcen | S/B T 18 40 6 19 11 6
Drive R 18 10 11 419 11 11
Girraween eB L 10 5 8 10 5 8
Court R 10 5 13 10 5 13
Table 3.2.2b — Intersection Analysis Results 2022 PM Peak
2022 PM Intersection Analysis Results Background Volumes Design Volumes
Approach Direction Movement DOS (%) | Queue Delay (s) [| DOS (%) | Queue Delay (s)
(m) (m)
Ben Lexcen | N/B L 16 8 8 17 9 8
Drive T 16 8 7 17 9 7
Ben Lexcen | S/B T 21 14 6 23 13 6
Orive R 21 11 1 23 13 1
Girraween E/B L 1 5 7 1 5 7
Court R 11 5 12 11 5 12
The above results indicate that the operation of the intersection will not be adversely
affected by the development in the 2022 design year. The intersection also operates well
within Council's required degree of saturation of 70%, with the degree of saturation not
exceeding 21% for any movement.
J\860001865 1 2\6\DOCUMENTSIREPORTSIREPORT
TITLE\FINALIOOO4REPORT_RFI_V2.D0C
Page 14
Arup
Draft 1 15 October 2008
Page 41
Blue Care
Sunrise Beach
Response to Sunshine Coast Regional Council Information Request
3.2.3. Ben Lexcen Drive, Eenie Creek Road and Heathland Drive
This intersection was analysed with and without the proposed development for the 2022
design year in both the AM and PM peak period. A simple two-phase signal operation with
filter right turns was assumed.
Table 3.2.3a — Intersection Analysis Results 2022 AM Peak
2022 AM intersection Analysis Results Background Volumes Design Volumes
Approach Direction Movement DOS (%) | Queue Delay (s) | DOS (%) | Queue Delay (s)
{m) (m)
Ben Lexcen | N/B L 82 134 42 87 153 47
Drive T 82 134 34 87 153 39
R 5 5 33 6 5 33
Heathland WwiB L 52 105. 20 53 107 20
Drive T 52 105 12 53 107 12
R 30 31 34 30 31 24
BenLexcen | S/B L 18 30 32 20 32 32
Drive T 18 30 23 20 32 23
R 62 32 51 71 33 §3
Eenie E/B L 39 75 19 39 76 19
Creek Road T 39 75 1 39 76 11
R 81 97 42 84 105 46
Table 3.2.3b — Intersection Analysis Results 2022 PM Peak .
2022 PM Intersection Analysis Results Background Volumes Design Volumes
Approach Olrection Movement DOS (%) | Queue Delay (s) | DOS (%) | Queue Oelay (s)
(m) (m)
Ben Lexcen | N/B L 58 84 30 61 89 30
Drive T 58 84 21 61 89 22
R 5 4 27 5 _ 4 27
Heathland WIB L 47 82 21 46 82 21
Drive T 47 82 12 46 82 12
R 23 25 24 23 25 24
Ben Lexcen | S/B L 12 19 26 14 22 26
Drive T 12 19 18 14 22 18
R 25 19 37 27 19 37
Eenie E/B L 35 61 20 35 61 20
Creek Road T 35 61 12 35 61 12
R 60 57 29 63 61 30
The above results indicate that the development will not adversely impact on the
intersection operation in the 2022 design year in either the AM or PM peak periods.
JABEOON\8ES 1216610 OC UMENTS\REPORTSIREPORT
TITLE\FINALIOOO4REPORT_RFI_V2.D0C
Page 15
Arup
Draft 1 15 October 2008
Page 42
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request 3.3 Summary The preceding analysis results for the three intersections show that the intersections will operate within Council’s required limits of operation to the 2022 design year. The addition of development traffic will not have a significant impact on the operation of any of the three intersections. As expected, the proposed development is a very tow traffic generator which will have a negligible impact on the performance of the surrounding road network. Whilst the detailed SIDRA analysis confirmed this, it is self evident from Figure 3.1.2 and the following Table 3.3. Table 3.2.3 — Predicted Traffic Volumes by Intersection Intersection Development Traffic | 2022 Background Traffic | % Ben Lexcen Drive/Grasstree Court AM 81 807 10 PM 94 564 17 Ben Lexcen Drive/ Girraween Court AM 49 791 6 PM 56 640 9 Ben Lexcen Drive/Eeenie Creek Road | AM 49 2022 2 em 57 1614 4 As the above table demonstrates, the proposed development contributes little in the way of additional traffic toad on Council's road network. Notwithstanding this, the applicant is still required to pay road and infrastructure charges. These charges will offset any impacts associated with the development. 4J\86000\88512\66\DOCUMENTS\REPORTS\REPORT Page 16 Arup TITLE\FINAL0004REPORT_RFI_V2.00C Draft1 15 October 2008
Page 43
Blue Care ; Sunrise Beach Response to Sunshine Coast Regional Council Information Request 4 Internal Traffic Generation and Vehicular Access This section responds to items 53 to 58 of Sunshine Coast Regional Council's Information Request, included as Appendix A. 41 Circulating Roadway Design The internal roadway circulation has been amended in response to Council's Information Request and is now designed with two road types: « The shared areas or “Greenstreets”. These are the major circulation roads and are 7m wide; and « The back of house, driveway access roads. These are 5.5m wide and are for access to resident's driveways and waste collection. The two road types are clearly distinguished by their differing surface treatments. This design will encourage visitors to the site to remain on the main circulation roads. All roads will now be two-way. This-design will be very user friendly for those unfamiliar with the site. 4.2 Service Vehicle Access 4.2.1. Garbage Collection Waste collection for the Independent Living Units is proposed to be a kerb side collection by Council’s refuse collection vehicles. Kerb side collection will take place on the back of house streets, 4.2.2 Swept Path Analysis Swept path analyses. have been carried out for the various vehicles requiring access to the site. These are included as Appendix F, as indicated in the below table. _ Table 4.2.2 — Appendix Reference for Swept Path Analyses Service Vehicte.Access Shown in Appendix Waste collection access to ILU villas (back of house) F1, F2, F3 LRV access to ILU villas (front of house) F4 SRV (ambulance) access to Central Facilities FS Van servicing to central facilities F6 SRV (ambulance } access to RAC F7 MRV access to RAC service facilities Fs The included swept paths indicate that: « service vehicles are able to access the necessary areas; « all service vehicles can enter and leave in a forward gear; and * noreverse manoeuvres are required for a waste collection vehicle servicing the independent living units. 4860001885 12\66\IDOCUMENTS\REPORTSIREPORT Page 17 Arup TITLE\FINALOO04REPORT_RFI_V2.DOC Draft 1 15 October 2008
Page 44
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request 4.3 ILU Villa Driveways The design shows that Independent Living Unit villas are provided with either a single or double garage. This means that car parking does not occur on the driveway, but in the garage itself. Car ownership in these types of dwellings is generally low and therefore, provision for more than one parked car per residency would not be necessary. Adequate parking for visitors to the ILUs is available (refer to parking allocation plan included in Appendix B) and does not need to be provided in the driveway. Therefore, the individual driveways need not be of sufficient length to park a vehicle, JABGOOONBES 1 2\G6\DOCUMENTS\REPORTSIREPORT Page 18 Arup TITLE\FINAL\OOO04REPORT_RFI_V2.00C Draft1 16 October 2008
Page 45
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request 5 Car Parking This séction responds to items 59 to 64 of Sunshine Coast Regional Council’s Information Request, included as Appendix A. oa 5.1 User Class and Dimensions The plans included as Appendix B include a colour coded plan showing all parking spaces : numbered and identifying the section of the development and type of user associated with . each individual bay. 4 The following outlines the user class(es) defined in AS2890.1 relevant to the proposed , 4 development. : + 5.1.1. User Class 1/1A (staff, residents) . : Car parking bays dedicated for use by staff are considered User Class 1, in accordance with . AS2890.1, which specifies the dimensions for this user class to be 2.4m wide by 5.4m long. There are staff bays associated with: + the residential aged care building; « the serviced apartments; and + the central facilities area. These are clearly indicated in the plans, included as Appendix B. The staff only bays associated with the residential aged care component of the development are 2.4m wide by 5.4m tong, in accordance with AS2890.1. All other staff car parking bays are 2.6m wide by §.4m long, which is in exceedance of AS2890.1 requirements. .Resident parking is provided for the apartments in the basement of each building. These parking bays are 2.6m.wide by 5.4m long, which is in exceedance of AS2890.1 requirements. A lock up garage is provided as resident parking for each of the independent living units. 5.1.2 User Class 3 (visitors) Car parking bays dedicated for use by visitors are considered User Class 3, in accordance with AS2890.1, which specifies the dimensions for this user class to be 2.6m wide by 5.4m os long. Ps There are visitor bays associated with: « the residential aged care building; . « the serviced apartments; + the apartments; and « the independent living units. These parking bays are clearly indicated in the plans included as Appendix B. The visitor bays are all 2.6m wide by 5.4m long, in accordance with AS2890.1. 34860001885 12\661DOCUMENTSIREPORTSIREPORT Page 19 . Anup TITLE\FINAL\QOO4REPORT_RFI_V2,00C Draft 1 15 October 2008
Page 46
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request 5.2 Design/Layout The design and layout of the car park, servicing areas and access roads have been amended to reflect Council’s suggestions in points 62 and 63 of the Information Request. §.2.1. Servicing and Car parking areas Car parking and servicing areas have generally been kept separate in the proposed development layout. The exception is the loading area for the Residential Aged Care building; there are a small number of low turnover, staff carparks located near this area. As these parks are designated for staff only, this arrangement is appropriate from a traffic engineering viewpoint. 5.2.2 Turnaround facilities Turn around facilities have been provided in accordance with AS2890.1 in all blind aisle location. : 5.3 Disabled Parking According to AS2890.1:1993, 1-2% of parking bays should be designated for occupants with disabilities. Considering the nature of this development, at least 2% of bays should be designated as disabled bays, with disabied parking provided for each of the separate uses within the development. 5 bays have been provided for disabled parking on site. These include: * 2 bays for the Residential Aged Care; * 1 bay for the Central Facilities; and « 2 bays for the Independent Living Unit Apartments. 5.4 Sightlines The figures included as Appendix G indicate typical sightlines available for cars reversing from the Independent Living Unit villa driveways. Figure 3.2 of AS2890:1 identifies a required sight distance of 30m for domestic property access with a frontage road speed of 40km/nhr. it is unlikely that speeds of 40km/hr will be reached on the internal road network of the development; therefore, sight distances of 30 metres would be more than adequate. The figure indicates that, due to the setback of the villas from the circulation roadway, adequate sightlines are available for vehicles reversing from the driveways. JABGOO0\B65 12\65\DOCUMENTSIREPORTSIREPORT Page 20 Arup TITLE\FINAL\O004REPORT_RFI_V2.00C . Draf'1 15 October 2008
Page 47
Blue Care Sunrise Beach Response to Sunshine Coast Regional Council Information Request Conclusion The preceding discussion responds to traffic issues raised by Council in their Information Request: The plans have been amended to incorporate any necessary changes in required to - address Council issues. These changes have resuited in appropriate parking provisions for each of the individual uses and a layout design such that the circulation of service vehicles within the site meets Council's requirements. The report concludes that the traffic generation associated with the proposed use is very low. Intersection analysis has shown that the surrounding road network will not be adversely affected by the development. We therefore recommend that this application be approved from a transport planning viewpoint. JASB000\88512\86\DOCUMENTSIREPORTSIREPORT Page 21 Arup TITLE\FINALWOO04REPORT_RFI_V2.00C Orafi1 15 October 2008
Page 48
Appendix A Sunshine Coast Regional Council Information Request
Page 49
11/88/2888 17:61 61-74471862 NOOSA SHIRE COUNCIL PAGE 81/89 Sunshine Coast Facsimile Transmission Racional Counc | File No: 2008/1128 Date: Monday, 11 August 2008 Fax No: 07 5493 4860 To: JB Goodwin Midson & Partners Attention: Drew Westbrook From Tracy Jones Phone No: 5449 5228 Fax No: 07 5447 1062 Re: Information Request — Blue Care Please find attached Council’s Information Request for Blue Care. IMPORTANT AND LEGAL PRIVILEGE NOTICE. The information contained in this facsimile message is CONFIDENTIAL and may be subjact to lega! privilege. Hf you ere not the intended recipient, you are notified that any use of this message is prohibited. if you received this message in error, please notify us immediately by telephoning 07 54495200 and destroy tha original, Page: Tofi Original to follow: No Sunshine Coast Regional Council Tewantin Office. 9 Pelican Street TEWANTIN (PO Box 141 TEWANTIN 4665) Ph 07 6449 200 Fax _0?7 6447 1062
Page 50
11/88/2888 17:81 61-74471062 NOOSA SHIRE COUNCIL . PAGE 082/83 j Lork dB 72 : T 07 5475 7272 | Su nsh | ne Coast Sunshine Coast Mait Centre F 07 8475 7277 Regional Council Qld 4560 © E [email protected] ABN 37 876 973 913 wW ww.sunshinecoast.qid.gov.au Officar: Tracy Jones Direct Telephone: 5449 5226 : Response Address: PO Gox 141, Tewantin QLD 4565 Email: tracy [email protected] Our Reference: 2008/1128 Your Reference: 11 August 2008 Blue Care CARE J 8 Goodwin, Midson & Partners 1/12 Technology Drive WARANA QLD 4575 Dear Sir/Madam Information Request Integrated Planning Act 1997 | refer to your application and wish to advise that we require further information to satisfactorily : £ assess the proposal. Please provide six (8) copies of all information to be supplied, including an AS set of plans and a CD copy. : . : }4 APPLICATION'DETAILS:. 0". ee ee - Application No: 2008/1128 Proposal: ‘ “Material Change of Use for Multiple Housing Type 2 Retirement & . oo Special Needs, Commercial Business Type 2 Medical and Wellbeing 1 : _ Health . Street address: Cooyar Street, Noosa Heads and 2 Grasstree Court, Sunrise Beach Real property LOT: 6 RP: 901384, LOT: 7 RP: 890947, LOT: 8 RP: 901384, LOT: 1 description: SP: 177650 . Planning Scheme: The Noosa Plan j2'___ INFORMATION REQUIRED . - Te The information requested is set out below: Land Use General 1. Provide at least one set of A1 plans to scale. 2. Appendix F ‘Codes! was not included with the application material lodged. Building Heights and Roof Forms . 3, Provide a site plan showing finished ground levels and a roof plan of Residential Aged Care Facility, Central Facilities and Serviced Apartments and Independent Living Unit Apartments indicating finished RLs. Building height in metres shall be measured from natural and finished ground level. : . , 4. Elevation and section plans shall identify with notations, the proposed and maximum building * helghts of all buildings. Caloundra Office Maroochydore Office Nambour Office Tewantin Office 4 Omrah Avenue 11-13 Ocean Street Cnr Curric and Bury Streets. 9 Pelican Street Caloundra Qld 4551 Maroochydore Qld 4558 Nambour Old 4560 Tewantin Qid 4565 T 07 $420 8200 . T 7 $475 9501 T 07 5475 8504 T 07 5449 $200 “f 07 5420 ssuu F 07 5441 8338 F O07 5441 8336 F 07 S447 1062
Page 51
11/88/2088 17:01 61~74471@62 NGOSA SHIRE COUNCIL PAGE 43/89 -2- §. _ Provide justification for all buildings, which exceed the maximum height limit of 2 storeys and 8 metres. 6, Provide roof plans for the Residential Aged Care Facility, Central Facilities and Serviced Apartments, Independent Living Apartments and Villas, demonstrating roof pitching and roof overhangs. Justify roof pitches less than 6 degrees and roof overhangs to less than 75% of the building. . Bullding Setbacks 7. Demonstrate that the Independent Living Unit Apartments meet the required side (northern) boundary setbacks. 8. Provide plans, which demonstrate that the distance between buildings, as not less 1.6 metres plus 0.5 metres for each storey of the building with the greatest number of storeys. Site Cover 9. Provide a plan demonstrating site cover calculations, It is noted that maximum site coverage of 60% applies to the site, Site cover shall be determined in accordance with planning scheme definitions. Landscaping 10, Provide @ plan demonstrating landscaping calculations. It is noted that a minimum area of, . proposed population x 40m? is required, with 60% of the minimum area being available for soft landscaping. 11. A6 metre landscape setback is not provided to the front property boundary to Ben Lexcen Drive, as internal roadways and Independent Living Unit Villas are within this setback. Demonstrate compliance or provided suitable justification in this regard. 12, Car parking to the Residential Aged Care Facility is not setback a minimum of 2 metres to the front property boundary to Grass Tree Court to allow for landscaping. Car Parking / Access 13, Demonstrate car parking for the development has been carried out in accordance with the minimum requirements stipulated in the Driveways and Car Parking Code. This includes car parking for Allied Health, Domiciliary Nursing and Respite Care, which form separately defined uses lo the primary uses of the site (ie. Residential Aged Care and Independent Living Units). The following is also noted:- 13.1, The number of employees (including medical practitioners/specialists) relevant to the Residential Aged Care, Allied Health, Domiciliary Nursing and Respite Care components of the development should be made clear. . 13.2. Only 7 car-parking spaces are identified for residents of the Serviced Apartments where 20 spaces is required. Clearly demonstrate on the plans that these spaces have been provided or provide justification for any non-compliance. 13.3. An emergency vehicle parking (1 space) is required for each of the following uses; Residential Aged Care Facility, Independent Living Units and Respite Care. Clearly demonstrate on the plans that these spaces have been provided or provide justification for any non-compliance, 13.4, The location of the 14 car parking spaces (visitor) proposed for Independent Living Unit Villas is not clearly shown on the proposal plans. Similarly, the location of car parking spaces (residents) for the Central Facilities and Serviced Apartments. 13.5. The location of additional car parking on the road reserve is not supported, Car parking is required to be wholly contained within the site. 13.6. It would also assist if each car park space could be numbered and nominated as a Staff parking space, a resident space, a visitor space, a disable space, a delivery Space, an emergency vehicle space, etc, that relates to the actual uses intended to use such spaces as this will make the proposal easier to understand.
Page 52
11/88/2608 17:81 61-74471962 | NOOSA SHIRE COUNCIL - PAGE 84/89 -3- 14. Clarify the car parking area (13 spaces) / service yard adjacent to the Residential Aged Care ‘Facility. Notations on the plan suggest 13 spaces, yet only 11 spaces ‘are identifiable. Demonstrate how the service yard be used as there is no clear provision for a loading bay. Biodiversity 15. 16. 17. 18: 19. 20. The site contains known populations of rare and threatened plants species (NCA 1992) (inter alla. Acacla bauerl, Gompholobium virgata v. emarginatum, Macarthurla. complanata, Schoenus scabripes). Please provide a comprehensive flora survey and plan of the subject site, decumenting the locations of the rare and threatened plants, species of the plants, abundance, damage avoidance/mitigation strategies likely to be engaged. The flora survey is to be undertaken by a suitably qualified botanist with field experience in tha Identification of the species known to occur on the site, and with suitable knowledge of the heathiand vegetation of the Sunshine Coast. Please provide an assessment of the subject site with relation to the Environmental protection Agency's Biodiversity Assessment Panel mapping of State’ Significant Bioregional Wildlife corridors. This report is to be authored by a suitably qualified and experienced Ecologist or equivalent persons. Please provide an assessment of the ecological matters relevant to the site in accordance with the guidelines contained within Planning Scheme Policy 18 Ecological Assessment Guidelines. Targeted species are to include rare and threatened species listed under EPBC 1999 and NCA 1992. Please provide an assessment of the impacts of the proposed development on the ecological values (including edge effects) of the adjacent National Park and riparian habitat. This report is to be authored by a suitably qualified and experienced Ecologist or equivaient persons. Piease provide supporting information that documents the current run-off water quality and quantity (pre-developed) for the site. Please provide estimated nutrient loads, water quantitles and velocities expected to leave the site and detail mitigation methods should these values appear to detrimental to the local environs. Please provide details of the proposed earthworks on the hydrological regime of the site and the possible off-site impacts. Bushfire 21, 22. The plan contained within the bushfire assessment report does not clearly identify the required location of fire breaks. and any other fire mitigation measures. Please provide documentary evidence that the current bush fire management accesses and trails Is an acceptable standard for Queensland Fire and Rescue fire fighting personne! and equipment. . Cultural Heritage 23. It has been Identified that there is a high possibility that the site contains Aboriginal Cultural Heritage sites or significant objects. Their relevant location should be identified on a plan. Council recommends that you contact the Department of Natural Resources and Water Cultural Heritage Co-ordination Unit, who administer the Aboriginal Cultural Heritage Act 2003 to discuss your obligations under the ACH Act. The Cultural Heritage Co-ordination Unit can be contacted on 07 3238 3838. Land Development Rainwater Tanks 24. - There is no "Noosa Rainwater Tank Policy”. Advise Council of the actual source that was used to size the rainwater storage tanks as referred to in Section 2.6 of the Cardno Engineering Report (24 June 2008). . Nn et! og, ee
Page 53
11/08/2008 17:81 61-74471862 NOOSA SHIRE COUNCIL PAGE 25/09 -4- 25. 26. The Cardno Engineering Report (24 June 2008) indicates that rain water tanke will only be incorporated Into the “Residential Unit Dwellings" within the proposed development. Drawing 238301-SKO1 only refers to "Residential Aged Cara” and "Independent Living Units”. Please advise whether the reference to “Residential Unit Dwellings” applies to “Independant Living Units” as shown on Drawing 238301-SK01 and advise of any proposed water reuse to be incorporated into the "Residential Aged Cara” component of the development. Demonstrate that rainwater tanks will comply with the Queensland Development Code. Earthworks 27. Indicate on a plan the footprint of earthworks including the location of batters and banks required for construction. Stormwater Modelling 28, 29. 30, 34. 32, 33, & & 37, 38. 39, 40. 41. Council does not accept stormwater modelling based on rainfall data from Nambour — which Is located within a Separate tocality and catchment from the site. Council requires the stormwater modelling to be re-run using site specific rainfall data. Provide details on the infiltration rates of soils underlying the bioretention basin and provide comment whether sealing of the bicretention basin is required. Provide an indicative maintenance program for the bioretention basins. The plan must include detalls of access requiraments, Advise whether the Impact of earthworks (i.e. changed site contours) and rainwater tanks has been taken into account within the stormwater modelling presented In the Cardno Engineering Report (24 June 2008). : There ts inconsistency (due to rounding error) associated with the capacity of the bioretention basins shown on Drawing 238301-SK02 and page 12 of the Cardno Engineering Report (24 June 2008). Council requests confirmation that early rounding of figures has not led to inaccuracy of calculations. Provide comment on the suitability of the 0.3m freeboard within the Lot 1 bioretention basin — or otherwise resize the basin appropriately. Advise the anticlpated pH range of water leaving the site following stormwater treatment. Council requires certification from a RPEQ that the proposed stormwater design will achieve the required runoff velocities and water quality objectives. In order to better integrate Water Sensitive Urban Design into the proposed development, consider integration of multiple stormwater quality improvement devices throughout the development design. Overland flow paths are necessary in the event of a failure of the constructed stormwater network. Consider integration of overiand stormwater flow paths into the design. Council is concerned that the 1:2 batters on the spreader channel are too steep and may be unstable ahd / or result in scouring during periods of high flow. Provide comment regarding the suitability of the proposed batter grade. Advise of the intent to include grease and oil arrestors within the design. Please provide a preliminary stormwater management plan for drainage of basements. Within that preliminary plan demonstrate that all basements can drain by gravity means, as The Noosa Plan dogs not permit the use of pumps within basement car parks. Demonstrate how all water that lands on the driveways to the basements will be collected and rained and that overland flow drainage (from Grasstree Court for example) will not enter the basement car parks. Ecological Impacts
Page 54
ts vo 4 11/08/2008 17:01 61-74471962 NOOSA SHIRE COUNCIL PAGE 65/89 -5- 42. The discharge velocity for Q2 events in the developed scenario exceeds the undeveloped case. Council also notes that the Lot 6 bioretention basin reduces the Q100 flows to velocities experienced in Q10 events and Q10 flows to velocities experienced in Q2 evants, Due to the sensitivity of the area and number of significant species residing within the receiving environment, Council requests comment regarding the impact of such event flow reductions on the ecology on significant species. Provide ecologist comment of the impact of on site detention of water (i.e. volumes within rainwater tanks) to downstream uses. Council requests an ecologist comment regarding the impact of the concentration of flows’: ” from the site to the designated discharge areas. Drawing 0673_DA11 Dated May 2008 by Smith+Tracey Architects shows that a gazebo; and: terrace is:intended to be located within the proposed bioretention basin at Lot 6 on RP901364-© With respect to the integral function of planting densities within bioretention basins, demonstrate and provide RPEQ certification that the proposed terrace and gazebo will not ah bap eee S adversely ‘affect the MUSIC modelling results and intended water quality Improvement function Heat - of the bioretention basin. 48. The detention basin on Lot 1 SP177650 is located directly adjacent to the 20-metre buffer. It Is considered desirable to have the detention basin setback from the buffer to allow for its construction without disturbance to vegetation within the buffer. External Traffic Generation 47. It 1s noted within the Traffic Assessment Report by ARUP that a SIDRA analysis has been undertaken, however no output data or digital filas have been provided for Council to assess. Accordingly, please provide a digital copy of the calibrated SIDRA analysis with the digital data files and traffic report certified by a RPEQ specialising in traffic engineering, as Council will independently review the data. Please note that the Noosa region has been developed with a primary focus on maintaining a low stress relaxed environment and the road network has been specifically designed to avold : conditlons typically found in cities, such as congestion / delays, four lane roads, and traffic lights. There are currently only 3 traffic lights within the Noosa region, two of which are for pedestrian. movements. To maintain this standard Noosa has designed the road system with a much lower degree of saturation, with roundabouts being designed with a maximum Degree of Saturation of 0.7, which has also been confirmed through calibration of the operating conditions of a number of existing intersections within the Noosa region. i Furthermore, ithe Noosa region has a high percentage of older / slower drivers and i intersections do not handle the same capacity that Is often experienced in city areas. Accordingly, the SIDRA analysis undertaken should be based on a maximum degree of saturation of 0.7 and the results and digital data of the intersection analysis submitted for Council to review and carry out our own SIDRA analysis. In this regard there are 3 distinct scenarios that need to be analysed: a) The existing situation needs to be modelled and calibrated to reflect the manual turning movement counts undertaken on Wednesday 28 May 2008. b) The existing situation, as modelled in (a) above, needs to be projected to the design horizon year and re-analysed, And c) The existing situation, as modelled in (b) above, needs to have the development traffic added as projected to the design horizon year and re-analysed, Should any improvements to the various intersections being analysed need to be undertaken as a result of the proposed development, please provide a recommendation as to what should be done. ,
Page 55
11/88/2688 17:81 61-74471862 NOOSA SHIRE COUNCIL PAGE 97/89 -6- Please also provide a copy of the manual tuming movement counts undertaken on Wednesday 28 May, as outlined In the Traffic Report, for Council to assess against our own traffic count date. + 48, An intersection analysis shail also be carried out on all intersections within the area that result i in 9 5% increase in traffic as'a result of the proposed development, and recommendations } made as to fiow best to improve these intersections. It is noted that a 10 year horizon has been used based on all construction being completed by 2012, giving a projected year of 2022 as stated in Section 4.1.1 of the Traffic Assessment ©. li... Report by. ARUP, however at section 4.4 of the report the intersection analysis has been ., based on traffic-volumes projected to 2019, not 2022. This anomaly should be corrected and ,,. the data revised accordingly. Furthermore the completion date of 2012 for the entire” # ) development with full occupancy seems an ambitious target and it is questionable as ‘to ‘ “ of whether the 10-year horizon should be based on a more realistic completion date for the! i}; development. Lite In terms of traffic distribution It Is noted that no assessment has been made for traffic that will utilise Eenie Creek Road, Though it is acknowledged that the section of Eenle Creek Road that adjoins Ben Lexcen Drive has not been open to traffic at this point in time, this is likely to change very soon as this section of the Road network is due to be completed and open before the end of 2008. Accordingly some traffic too and from the proposed development is likely to use this route and this should be taken into consideration in the analysis. 51, In terms of the Origin / Destination split of traffic, It Is also noted that no assessment has been made for traffic that utilises the existing service road that currently cuts across the north- eastem boundary of proposed Lot 9, that is, the one-way service road that has entry off Ben Lexcan Drive south of Lipton Street. In this regard consideration needs to be given to existing traffic that take this route as well as some of the traffic that will be associated with the proposed development which will also take this route. 62, In addition to the above, also review the traffic impacts of changing the one-way service road off Ben Lexcen Drive to allow two-way vehicle movements with an exit onto Ben Lexcen Drive to avoid vehicles with a southern origin’ destination having to use the Lipton / Ben Lexcen Drive roundabout and having to travel past the Shop precinct. . Internal Traffic Generation and Vehicular Access ‘. §3. Provide a plan that clearly illustrates all of the internal road widths and whether two-way or . one-way vehicle movements are proposed. Information provided to date Is unclear and based on drawing 0873_DA16 by Smith & Tracey Architects is likely to result in drivar confusion, panic, and low speed accidents occurring. This convoluted arrangement is unacceptable and itis recommended that all circulation roads be designed to cater for two-way movements, with low volume internal roads being at least 5.5m wide, and the higher volume intemal roads being approximately 7m wide as suggested in the Traffic Assessment by ARUP. 54. Demonstrate that all internal roads can cater for the vehicles intended to use them, by illustrating appropriate vehicle swept paths. This is an issue that must be addressed up front @$ Opposed to delaying to operational works stage as vehicle turning paths and internal foadway requirements are likely to affect the proposed building focations, shapes and sizes, 55. Provide a plan that also illustrates all internal pathways and the width of such pathways. It is suggested that an intemal pathway hierarchy needs to be established, with the pathways carrying the tower volume of users being 1.5m wide (also the narrowest), and the pathways more likely to carry higher volumes being at least 2.0m wide. Consideration also needs to be given to the mobility levels of the various patrons, as it is considered that some patrons will utilise walking fames and some will be in wheelchairs. To this end the pathway network needs to be designed to cater for these users. The applicant may also choose to provide wider pathways than that which has been mentioned to enhance the standard of their development. 56. Demonstrate that service vehicle access (Ie. exit and entry) to various parts of the site will occur In & forward gear at all times. :
Page 56
” : 11/88/2088 17:01 61-74471862 NOOSA SHIRE COUNCIL PAGE 98/09
t
-7-
57. Illustrate where and how garbage is proposed to be collected on site for each of the individual
uses and where exactly a garbage truck will need to drive, showing the actual swept paths. if
it is proposed to have a central collection point, please illustrate how garbage will be taken
from thé,individual uses to the central collection area and how a garbage truck will service the
central collection area, For safety reasons and contractual reasons Council's garbage truck
must enter; manoeuvre on site, and leave the site in a forward gear, with no reverse
manoeuvres.
. All garages need to be setback sufficiently from their intemal boundaries to allow a car to park
- on the driveways of the proposed units without protruding over the boundary, This.
i arked vehicles do not obstruct visibility or restrict vehicle. movements
ting roads/driveways. :
oo
!. Provide:plaris ‘datailing sight lines required pursuant to AS/NZS 2890.1:2004 (Partdn 4
Facilities, = Off Street Carparking) ot most recent equivalent for véhicies raversing :
driveways to the Intemal road network. ,
Advise the user-class that the car spaces are designed to pursuant to AS/NZS 2890.1:2004
(Parking Facilities ~ Off Street Carparking). : .
61. Illustrate all proposed car parking on site, including the basement car park areas, and
demonstrate how these comply with all relevant aspects of AS/NZS 2890.1:2004 (Parking
Facilitles — Off Street Carparking) or most recent equivalent. Ensure plans are provided
detailing sight lines required pursuant to AS/NZS 2890.1:2004 (Parking Facilites — Off Street
Cerparking) or most recent equivalent for vehicles reversing from driveways to the internal
road network, .
62. All car-parking areas must be separate to service/delivery/refuse areas to avoid incompatible
uses and the risks of accidents.
63. Provide turn-around facilities to all car park areas and cul-de-sacs to allow vehicles the ability ~
to turn around and drive out in a forward direction.
84, Provide an appropriate number of disabled parking spaces across the development with
consideration given to the likely patronage of the Blue Care development as well as
-
Consideration to the Disability Discrimination Act 1992 and other related documentation.
External infrastructure Agreements
‘Provide amended plans for the Lot Reconfiguration component of the development with the
north-eastern comer of proposed Lot 9 truncated such that the existing access road off Ben y
Lexcen Drive is dedicated as Road Reserve. in this regard the boundary should be located at .
o : rE least 10m from the centreline of the existing access road, and the proposed residential units. 1
t.. veahp, adjusted accordingly to comply with Council's building setback requirements from the ee
realigned boundary. '
66. Submit a traffic management plan for the construction phase of the development outlining how
traffic will be controlled and also addressing how dirt/debris carried on vehicle wheels will be
kept off the road network.
67. Illustrate appropriate external public pathway connections to Council's existing pathway
network. In this regard a 2.0m wide path should be provided along both sides of Grasstree
Court to connect to existing infrastructure and local shops where patrons of Blue Care are
likely to walk.
68. Illustrate on all of the proposal plans ail existing services on site, such as the existing sewer
maln and pump station, and any service easements that may be necessary, In this regard
easements will be required to be created over all Council services with a minimum width being
the greater of 3.0m or twice the depth to the invert level of the pipe where no structures
(buildings, retaining walls, etc) will be permitted to extend beyond these easements. To this
end consultation with Council's Water & Sewerage Capital Works Manager (07 5449 5288) Is
recommended to ensure easements are appropriate.
Page 57
““G7:et — "61-74471062 NOOSA SHIRE COUNCIL
Sewerage
69. Indicate the location of easements over the existing sewer network in accordance with the
_% Noosa Planning Scheme Policy 06 Engineering Design Standards — Water and Sewerage.
4% Water Supply i, 2:
}. . s to the Water Supply component of the Cardno Engineering Report (24 June 2008) « af ae
- Counoll considers that the recommendation for a 150mm loop main Is reasonable, howaver, ~ “-
“the scope of the report appears to be limited and Council will require its consultant (Le. Worley ve
_ Pargons) to consider the proposals impact on the Councils water supply network prior to issie*
of any” decision notice. The epplicant is responsible for all cost incurred by’ ‘Council:in. thie
regare ie cost for this analysis will be $1,520 (excluding GST) as detallog on the:
iy in
fesponse to ‘this: Information Request. You may give the assessment manager (in, this Instanct' # ;
Pounce) and each referral agency (if any): :
* all of the Information requested; or
‘ fy 2. Part of the information requested together with a letter asking the assessment manager and.
, each referral agency to proceed with the assessment of the application; or
3. @ letter:
(i) stating that you do not intend to supply any of the information requested; and
(i) asking the assessment manager and each referral agency to proceed with the
‘assessment of the application.
"+ Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant Is to
: j ispees. to any information request within 12 months of the request or otherwise, the application
i . lapses,
., Aresponse,to ‘the above is required to be submitted, prior to further assessment of the application, If
-'. any further matters arise as part of assessment of this application, you will be advised accordingly.
*» Should you have any.further queries in relation to the above, please do not hesitate to contact Tracy
“Jones on the sbove number.
Youre faithfully,
., Tracy Jones
ENIOR PLANNING OFFICER
Page 58
Appendix B Proposed Development Plans cet ge
Page 59
Revision P'1/Nov 08 1,Parking Nos added } 2.Contours added 3.Section lines added 4, Setback.dims. added / < stage 2 OK. stage 1 Lp tm— ee aN L ee ee icy Ss ae ey, ! i - ¥ . oo id ) l i, - Vm ee _— _ . et a _. oe eee \ 2Om- -- ~~ ee 7 TT ne tS Ne et meme a am—----- RE 24S] A1-28 |_| (Hols f) a FV GASEMENT CARPARK — 18 CARS FFL, 23.600m 78 9 fg OPT Zs * \ = - — pepe fe ee a —24m..——— 1S jg) 16) 171) 181 F —25m-—-- —26m —27m-- a | oN APARTMENT BUILDINGS — BASEMENT SCALE 1:500 . pe 29m a = apartment buildings - basement smith+tracey architects blue care sunrise beach @BlueCare scale: 1:500 @ A3 fob no:.0673 date: may 2008 dwg no: 0673_DA22/P1
Page 60
J Revision P1/Nov 08 x 1. Basement extended 2. Parking spaces increased Lie. Ve Fj residential aged care - basement smith+tracey architects blue care sunrise beach @BlueCare scale: 1:400 @ A3 job no: 0673 date: may 2008 dwg no: 0673_DAIZ/P1
Page 61
pedestrian connectivity ‘
: Revision P1/Nov 08
1. Parking layout
2. (LU removed
| | 3. Streets widened
—— LP fon sree
The ‘site layout has been designed to provide separate \
pedestrian access to the main areas within the site and to key
points outside the site.
The main public precincts of the Independent Living Units (ILU's)
and apartments are linked by dedicated pathways at a maximum
grade of 1:20 to the Central Facilities, the Residential Aged Care
‘acility (RAC) and the key nodal meeting points.
These pathways are extended outside the site to the adjacent
shopping centre and out to Ben Lexcen Drive to public transport.
Paths also connect the site to existing walkways in the wetland
area via bushfire management access tracks.
"in this way the resident is able to access recreational areas,
shopping and public transport in a safe convenient
manner
bus |route
459
nen
858
ON
oO publi foot
738
sommaer
ISD
woenshr
to wetlands
to
meeting place
to wetlands
0 20 40 60 80 100 200m
a
_ pedestrian circulation
smith+tracey architects blue care sunrise beach OBlueCare
!
scala: 1:2000 @ A3 joo no: 0673 te: october 2008 dwg no; 0673_DAG9/P1
Page 62
precincts The site layout has been designed to provide a Series of Clearly defined precincts of a public, private, and service nature. ‘The central facilities building and recreational area 1 provide a Central core to the residential village. All = visitors and a majority of residents arriving by + vehicle are expected to pass the central facilities - entry and porte cochere, and this sequence provides a central point of réferéence for visitors and residents alike. the apartment crescent ‘tree fin Circular crescent provides venicuiar and pedestrian access for residents and visitors to the apartment.Visitor carparking is conveniently located next to pedestrian entries on the western side of the crescent while a pathway on the eastern side connects to the pedestrian network within the site. Residents cars are located in the basements of the apartment buildings. The sweeping crescent will be landscaped with street trees and gardens. 9g 20 40 & & 10g 200m ee smith+tracey architects LM Co Lvov sitet (Ou BEN LEXCEN DRIVE Revision P1/Nov 08 1. Parking fayout 2. ILU removed 3. Streets widened Residents and visitors to the site via Ben Lexcen Drive ill pass a landscaped buffer area with screen fence behind, ‘be aware of the main village identification signage on the comer and then progress along a Tree ed Grasstree Court to the main entry staternent at e roundabout. Progress is then made to a main efitky precinct at the central facilities, to the RAC entry, 0 the church via the existing cul - de - sac praround. he village avenues precincts blue care sunrise beach scale: 1:2000 @ AZ job no: 0673 date: october 2008 dwg no:0673_DA08/P 1 lined avenues are proposed to provide front door lestrian and visitor access to the villa free of riveways and garages with residents car accéss limited to service lanes at the rear of the houses. Thy avenues aré proposed to be mainly ia ,with occasional visitor parking. they Opportunity for houses to address the lic space with the public/private interface at the orand patio. The east-west alignment of most rovides private living and outdoor areas on side with beneficial solar aspect.The venues Connect recreational "meeting place” nodes that contain mailboxes and small casual BBQ areas. ese nodes are connected into the main pedestrian network to the central facilities and to public areas outside. @BlueCare
Page 63
masterplan
The site comprises two parcels of land separated by the existing Grasstree
Court road reserve, :
Lot 6 on RP901384 is 8, 697 m? and is bounded on the east by an’existing
shopping centre, to the north by vacant land and to the west by an existing
Uniting Church. It is proposed to develop a 2 storey residential aged care
home (RAC) of 96'beds on this site. The facility would also house Blue Care,
allied health, community nursing, respite and support / hospitality services.
Proposed lot 9 being part lot 1 on SP177650 is 4.66 ha bound to the east
by existing residential development, to the north by Grasstree Court and the
existing church and to the west and south by a reserve.
It is proposed to develop an aged care facility comprising a central facilities
and recreation building, 20 serviced ‘apartments and a total of 108 indepen-
dent living units in the form of either singlé storey semi-detached villas or
four 2 storey apartment buildings within this site.
Staging
The proposed development is In 2 stages?
Stage 1
residential aged care 96 beds + respite 2 beds
central facilities & 20 serviced apartments
19 Independent living units.
22 apartments
Stage 2
35 independent living units
32 apartments
+ ge {
lot 5 on RP890947
esidentis
lot 6 on RP901384
96 beds (aged care)
2 beds (respite)
aged persons home site
Revision P1/Nov 08
4. Parking layout
2. LU removed
” 3, Streets widened
<7 Ca Pron siete
r {_
_ [) Dif | vacant land _
i | ‘| lot 7 on RP890947
i : ) '
a” f
Aan
Pp ) bee § |
“yt : i 2 = existin
. ee e s a fot 8 on RP901384
pd
. 5
LAYo lL | I 2
q =
Wie 1 a,
! Ee Wy te F —
E Guage tare COL UW
aged care facility site ©
central faciliti tviced.apartments |
function room & recreational facilities
20 serviced apartments i,
&
apartments 768 %,
23 x 2 bed oat
31 x 2 bed + study
54 total ous
yA bearers 8, ‘sy
national park meee isa dine ee
lot 147 on — eto uit thers
NPW889 » —~ ; 76¢
3 A
0 2 © 9 #8 19 200m i vacant land 163
ee i remainder lot 7 on “ie
§ SP177650 &
<__stage 1 DK a
masterplan
smith+tracey architects
blue care sunrise beach
~ fob ne: 0673
scale: 1:2000 @A3
proposed lot 9, part
lot 1 on SP177650
independent living units
i x et
22 x 2 bed + study
54 total
@BlueCare
date: october 2008 dwg no: 0673_DA07/P1
Page 64
APARTMENTS Revision P41 Nov-08
23 X2BED CARPARKING SUMMARY RESIDENTS: 65 SPACES 1- Visitor parking updated
31X2BED+STUDY TOTAL 82 SPACES VISITORS: 17 SPACES 2- Totals.included in caics
54 TOTAL
- APARTMENT TYPE No OFF BEDS/ BEDS ENCLOSED [ENCLOSED [BALCONIES7 |BALCONIES) BASEMENT [CIRCULATION [CIRCULATION [PORTE
APART. APART. TOTAL APART m2 DECKSm2 |DECKSm2 {CARPARK |ENCLOSED |UNENCLOSED {COCHERE
m2 TOTAL. TOTAL m2 m2 m2 m2
BUILDING 1 656 54 437
TYPE A1-28 7 2 14 99 693 17) 119
TYPE A2-28 1 2 z 85 a5 17 7
TYPE A3-28+S 8 2 16 118 920 17 436
SUBTOTAL 16 32 1698 272 656 54 437
BUILDING 2 " ; 657 50 345 ”
TYPE Al-28 7 2 14 99 693 7 719
TYPE A2-28 1 2 2 85 85 17 47.
TYPE A3-264S 8 2 16 115 920 17 136
SUBTOTAL 16 32 1698 272 657 50 345
BUILDING 3 47 24 243
TYPE A128 4 2 3 99 306 17 68
TYPE A4-28 1 2 2 90 90 17 17
TYPE A3-25+S 7 2 14 115 805 17 119
SUBTOTAL 12 24 1291 204 347 24 243
BUILDING 4 471 24 330
TYPE A1-28 1 2
TYPE A2-28 1 2
TYPE A3-28+S 8 3
SUBTOTAL 10
TOTAL Ee 54
SERVICED APARTMENTS & CENTRAL FACILITIES
? SPACES
@BlueCare
11X14 BED CARPARKING SUMMARY RESIDENTS:
9X2BED TOTAL 30 SPACES VISITORS (CENT. FAC.): 16 SPACES
20 TOTAL STAFF: 5 SPACES
EMERGENCY VEHICLE 4 SPACE
SERVICE VEHICLE 4 SPACE
TYPE SA-1B-M-GROUND 3 1 3 63 189 16 48
TYPE SA-1B-M-UPPER 6 1 6 63 378 16) 96
TYPE SA-1B-E-UPPER 2 1 2t 65 130 10) 20)
TYPE SA-2B-M-GROUND 1 2 2 79 79 24 24
TYPE SA-28-M-UPPER 2 2 4 73 158) 24 48
TYPE SA-2B-E-GROUND 2 2 4 80 160 16 32
TYPE SA-2B-E-UPPER 4 2 8 80 320 16 64
COMMUNITY FACILITIES 1017 1017 219 219 24 325 80
TOTAL 20 29 2431 §51 24 325 80
area schedule - apartments
smith+tracey arcnitects blue care sunrise beach
job no: 0673 date: may 2008
dwg no: 0873_DA06/P1
Page 65
smith+tracey architects
masterplan / carpark layout
blue care sunrise beach
RAC
ant
Staff Parking
54
(Including basement with disabled x 2)
Visitor Parking
(including disabled
Emergency Vehicle
Service vehicle
20
x 2)
Central facilities & serviced apartments
-
Oeal
Staff parking
Visitor Parking dx) 16
led x
(includes di:
Residents
Service Vehicle
= Emergency vehicle
Apartment ILUs
Cc] Residents (basement parking) 65
Visitors
17
{includés basement x 3 & disabled x 2)
Villa ILUs
a Residents (garaged) 74
2 Visitors
_
900 90.0675
Qate woventies 2008
30
@BlueCare
twg 99 0673 DA ADD Ps7
Page 66
Appendix C Traffic Impact Assessment Report
Page 67
Arup Arup Pty Ltd ABN 18 000 966 165 Arup Level 4 108 Wickham Street, Fortitude Valley QLD 4006, GPO Box 685 Brisbane QLD 4001 Tel +61 7 30236000 Fax +61 7 3023 6023 www, arup.com Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment June-2008 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be. relied upon by any third party and no. responsibility is undertaken to any third” party Job number 86512/66
Page 68
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment Contents Page 1 Introduction 1 14 Limits of Report 1 1.2 Safety in Design 1 2 Background Information 2 2.1 Site Location 2 2.2 Existing Development 3 2.3 Local Road Network 3 3 Proposed Development 4 3.1 Proposed Access Arrangements 4 3.2 Internal Circulation and Road Hierarchy 5 3.3 Parking Provisions 7 3.4 Service Vehicle Facilities 8 4 Traffic Impact Assessment 9 41 Background Traffic 9 4.2 Traffic Generation 10 4.3 Traffic Distribution 12 4.4 Intersection Analysis 13 5 Conclusion 16 Appendices Appendix A Background Traffic Volumes Appendix B Generated Traffic Distribution J:\86000\86512\66\DOCUMENTS\REPORTS\REPORT Arup TITLEVFINALIOO02ZREPORT_JUNEO8_V2.00C. Issue 24 June 2008
Page 69
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment 1 Introduction Arup was commissioned by Blue Care in April 2008 to undertake a traffic impact assessment for the proposed Blue Care Facility to be located at Grasstree Court, Sunrise Beach. This report details the tasks and findings associated with this assessment, which included: — Site visits to investigate the proposed development site and the surrounding road network; - Areview of access to the site; - Areview of the internal car park layout and circulation; — Anassessment of the internal servicing arrangements; and ~ Anassessment of the impact of the site on the surrounding road network. 1.1 Limits of Report While Arup has taken care in the preparation of this report, it neither accepts liability nor responsibility whatsoever in respect of: — Any use of or reliance upon this report by any third-party; and ~ Any third party whose interests may be affected by any decision made regarding the proposed development. 1.2 Safety in Design Within the scope of our design activities, we have identified safety in design issues and potential hazards, whenever reasonably practicable within our field of expertise. Due to our limited and upfront role on this project, it is not considered reasonably practicable to identify all potential hazards which may occur throughout the life of a project, including during construction activities. For any ensuing design stages, it is strongly recommended our advice regarding safety in design be reviewed and revised as required, to reflect any changes to the current design. . 41860001865 12\66\D OCUMENTS\REPORTSIREPORT Page 1 “Arup TITLE\FINALIQO02REPORT_JUNEOB_V2,D0C : Issue 24 June 2008
Page 70
Blue Care Property Development Unit Blue Care Sunrise Beach
Traffic Impact Assessment
2 Background Information
2.1 Site Location
The subject site is located at Grasstree Court, Sunrise Beach as shown in Figure 2.1a.
Existing Lot 6 on RP901384 (6 Grasstree Court) will remain as is and be the site of the
“aged persons home" or RAC. “Precinct 4”
Existing Lot 1 on SP177650 (Ben Lexcen Drive) will be subdivided to create a new Lot 9
and be the site of the remainder of the development, the “retirement village" which contains
independent living units (ILUs), apartments and the central facilities building. The balance of
existing Lot 1 will remain undeveloped as part of this DA. “Precinct 2”
“Noosa cA
\ Aquatic!
Centre + - ff] ys
\ skate mm GIRAWEEN
r
Sunshine
secsenseseseseseseers Beach
High
Schot
Dect e ree eecsee
™~
~y: ak
" Unly a
Comm Ctré
bo venel C. : 9
SITE)" \
CLUIAINIOr:
Figure 2.1: Site Location and Surrounding Road Network
Source: UBD
Not to Scale
ca.
JA\B6000\865 1 2\66\DOCUMENTS\REPORTS\REPORT Page 2
Arup
TITLE\FINALIO002REPORT_JUNEO8_V2.D0C issue 24 June 2008
Page 71
Blue Care Property Development Unit Blue Care Sunrise Beach - Traffic Impact Assessment 2.2 Existing Development The subject site is currently unoccupied. 2.3 Local Road Network 2.3.1 Ben Lexcen Drive Ben Lexcen Drive is a two lane road which is designated as a District Collector by the Sunshine Coast Regional Council. Ben Lexcen Drive carries in the order of 400 vehicles during each commuter peak hour, based upon manual traffic counts undertaken for the purpose of this study on Wednesday 28 May 2008. 2.3.2 Grasstree Court _ : Grasstree Court is a local access street providing access to a small neighbourhood shopping centre located adjacent to the north east corner of the site and a church located at the western end of Grasstree Court. ‘ An existing left stip lane provides access from Ben Lexcen Drive to Grasstree Court for northbound vehicles. We understand that the existing left slip lane is not gazetted and was constructed over private tand'which is the subject of this application. The architectural plans indicate a realignment of this left slip lane to be fully contained within Council’s road reserve. We understand Blue Care are currently attempting to resolve this encroachment with Syd Jerram (Manager, Works Planning North) and Michael Hagan of Council's Assets and Infrastructure Department. JASBODO\BBS 1 2\8EIDOCUMENTSIREPORTSIREPORT Page 3 Arup TITLE\FINAL\OOO2REPORT_JUNE08_V2,00C tssue 24 June 2008
Page 72
Blue Care Property Development Unit , Blue Care Sunrise Beach Traffic Impact Assessment 3 Proposed Development The proposed aged care facility will comprise of two precincts Precinct 1: Located on the northern side of Grasstree Court ~ 96 single bedrooms (units) in a residential aged care (RAC) facility — Two (2) single bedrooms (units) in respite care as part of the RAC. Precinct 2: Located on the southern side of Grasstree Court - 55 independent fiving units (ILUs) in villa style accommodation — 54 independent living units in four (4) apartment buildings ~ 20 serviced apartments and a central facilities building Please refer to the full set of drawings prepared by Smith & Tracey Architects which accompanies the development application. The foltowing sections discuss the key traffic elements and principles of the design. Further refinement of the design will take place during operational works (e.g. based on detailed swept path, sightlines, drainage etc) 3.1 Proposed Access Arrangements All access to the development is via Grasstree Court. Three (3) crossovers are proposed to provide access to the residential aged car facility located on the northern side of Grasstree Court: — the eastern most crossover provides access to 13 parking spaces and also provides access to the service yard (refuse collection and deliveries); — the central crossover provides access to approximately 21 visitor spaces and includes a porte-cocher and 1 emergency vehicle space; and — the western crossover provides direct access to 41 spaces to be designated for use by staff. Two (2) crossovers are proposed to provide access to the independent living units and apartments on the southem side of Grasstree Court: - _ the eastern crossover will be the principal entrance providing access to the Centra! Facilities Building and Independent Living Units; - the western access will provide access to the apartment buildings and serviced apartments. The proposed development will effectively result in the full build out of land surrounding Grasstree Court. Grasstree Court is a cul-de-sac and does not service through traffic. The only vehicles that will use Grasstree Court will be associated with Blue Care or the existing Church. For this reason it is not unreasonable to propose multiple access points to Grasstree Court. J:\86000\865 12\166\DOCUMENTS\REPORTSIREPORT Page 4 Arup TITLEVFINAL\QOOZREPORT_JUNE08_V2.D0C tssue 24 June 2008
Page 73
Blue Care Property Development Unit Blue Care Sunrise Beach
Traffic Impact Assessment
3.2 internal Circulation and Road Hierarchy
The intent of the internat road network is to create an attractive and functional streetscape
for the [LUs. This will be achieved by creating three (3) hierarchies of roads within the site
as depicted in Figure 3.2a
22. as aS
we
| i AL)
steer] atte
SITE MASTERPLAN
me oe
‘rbot SPINE ROADS = Ih ;
RESIDENT ONLY a .
>> PUBLIC. STREET (one wry)
i
Figure 3.2a — Internal Hierarchy of Roads
J\BBOODI8ES 1 2\66\DOC UMENTS\REPORTSIREPORT Page 5 Arup
TITLEVFINALIOOO2REPORT_JUNEO8_V2.D0C issue 24 June 2008
Page 74
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment Spine Roads The spine roads are two-way and provide connectivity from the main entrance points on Grasstree Court. These roads will be used by all (residents, visitors, refuse collection etc) having a width of approximately 7m. Resident Only “Roads” These roads are intended for use by residents to access their individual garage and for service vehicles to collect individual wheelie bins. They are essentially “back of house” with individual garages turned to face each other. These roads are generally approximately 4 metres wide, with additional width provided at garages and at strategic points to allow vehicles to pass each other. They have been designed to facilitate a Heavy Rigid Vehicle. An example of this type of configuration is shown in Figure 3.2b Figure 3.2b —- Resident Access Roads Public Streets “One-Way” Turning the garages of the ILUs to face each other results in the front of the ILUs presenting to a “no access” street. These streets are intended to be a low speed shared environment with parking opportunities for visitors. The street will comprise of one moving lane “one- way” with indented parallel parking. This street will generally be in the order of 4.5m wide with additional width provided locally for the indented parallel parking. An example of this type of street is shown in Figure 3.2c Figure 3.2c — Public Street “One-Way” JA8600018651 2\66\DOCUMENTSIREPORTSIREPORT Page 6 Anup TITLE\FINAL\OO02REPORT_JUNEO8_V2.D0C Issue 24 June 2008
Page 75
Blue Care Property Development Unit Blue Care Sunrise Beach . Traffic Impact Assessment 3.3 Parking Provisions . The parking requirements have been calculated based on Table 14-49 “Minimum vehicle parking requirements” of Noosa Shire Council's Driveways and Carparking code. Table 3.3: Proposed Parking Provisions Component | Use Quantity Suggested Required Parking Rate Carparks High Care Beds 98 beds 1 per 5 beds 20 . Employees 55 staff 1 per 2 staff 28 WRT ALR) Independent Living 55 units 1 per unit 55 Units Apartment Buildings 54 units 1 per unit 54 Serviced Apartments 20 units 1 per unit 20 Visitors ‘ tper4units _ 33 Precinct 1 requires a minimum of 48 parking spaces. A total of 75 have been provided including 35 at grade and 40 in the basement. Precinct 2 requires a total of 162 parking spaces. 184 have been provided on site, with an additional 13 spaces available on street in Grasstree Court. Parking for the residents wilt be provided at a rate greater than 1 space per unit. Resident parking will be provided in individual garages for the ILUs and secure basements for the Apartments. Visitor parking is provided on-street. The proposal therefore complies with Council requirements. 48600018651 2\66\DOCUMENTS\REPORTSIREPORT Page 7 Arup TITLE\FINALIOOO2ZREPORT_JUNE08_V2.D0C Issue 24 June 2008
Page 76
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment 3.4 Service Vehicle Facilities Adequate servicing facilities have been proposed on-site to ensure that such activities do not occur on the street.and will not compromise the performance of Council's road system. A centralised service yard (refuse collection and deliveries) is proposed at the eastern end of the Residential Aged Care facility. This area will be designed to facilitate a Large Rigid Vehicle. These larger vehicles will need to perform one reverse manoeuvre to access or egress the site from Grasstree Court. This is appropriate considering Grasstree Court is a local access cul-de-sac which does not service through traffic. The only vehicles that will use Grasstree Court will be associated with Blue Care. A second loading bay is proposed on the westem side of the central facilities building within precinct 2. . Regular access is required for refuse collection vehicles. The strategy for refuse collection is as follows: Precinct 1: Residential Aged Care A centralised bin store area would be located adjacent to the service yard. Precinct 2: independent living Units and Apartments Each independent living unit will have their own wheelie bins. The internal road network has been designed to accommodate the swept path of a Heavy Rigid Vehicte traversing the site. For the serviced apartment complex and each of the 4 apartment buildings there will be a centralised bin store area located adjacent to the internal Spine Road. JA86000186512\66\D0CUMENTS\REPORTS\REPORT Page 8 Arup TITLE\FINALIO002REPORT_JUNEO8_V2.00C Issue 24 June 2008
Page 77
Blue Care Property Development Unit . Btue Care Sunrise Beach Traffic impact Assessment 4 Traffic Impact Assessment An assessment of the trip generation and distribution has been undertaken for the proposed development. Where necessary, intersection analyses have been carried out using the software package SIDRA Intersection 3.2. 41 Background Traffic Manual! turning movement counts were undertaken on Wednesday 28 May for the purpose of this study at the following intersections: » Ben Lexcen Drive / Grasstree Court / Lipton Street; * Ben Lexcen Drive / Girraween Court; and « Ben Lexcen Drive / Eenie Creek Road (to be constructed) / Heathland Drive. These counts were undertaken during the following periods, to capture the peak periods of the surrounding road network: * 7:00am to 9:00am; and » 3:00pm to 5:00pm. It was determined that the peak periods for the surrounding road network are as follows: " 7:45am to 8:45am, and « 3:00pm to 4:00pm. Appendix A shows the observed volumes during these peak periods. 4.1.1. Background Traffic Growth Rate The estimated time of completion of all stages of the development is 2012. To determine forecast 2012 and 2022 background traffic volumes for ensuing traffic analyses, a growth rate of 3% per annum was applied. JNG6000\8651 2\66\DOCUMENTS\REPORTS\REPORT Page 9 Arup TITLE\FINALIOOO2REPORT_JUNECS_V2.D0C Issue 24 June 2008
Page 78
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment 4.2 Traffic Generation In determining the predicted traffic generation for the site, reference has been made to the RTA Guide to Traffic Generating Developments, 2002. Using the rates Stipulated in this document combined with engineering judgement, we have estimated the predicted traffic volumes at each of the access points during the morning and evening peak periods. 4.2.1 Serviced Apartments The RTA stipulates a rate of 0.1-0.2 peak hour vehicle trips per dwelling for housing for ages and disabled persons. As such, we have adopted a rate of 0.2 peak hour vehicle trips per dwelling for the Serviced Apartments proposed within the site. 4.2.2. independent Living and Apartments For the Independent Living and Apartment land uses, we have conservatively assumed a rate of 0.4 peak hour vehicle trips per dwelling. This has been assumed to account for the higher usage of private vehicles amongst occupants of these land uses when compared to the Serviced Apartments. 4.2.3. Aged Care The RTA Guide to Traffic Generating Developments, 2002 does not provide specific guidance on the calculation of vehicle trips associated with Aged Care facilities such as those provided by Blue Care. Whilst the abovementioned RTA rate is appropriate for application to the Serviced Apartments, we believe the trip making characteristics of the Aged Care facilities during peak hours will be more closely related to staff numbers due to the generally long stay nature of such beds. Based on discussions with Blue Care, it is understood that the proposed Aged Care facility's staffing schedute (incorporating community services and hospitality) is to be as shown in Table 4.2.3 below Table 4.2.3 ~ Staff Numbers Total Hour Arrivals | Departures Trips 6:00 - 7:00 8 0 8 7:00 - 8:00 23 1 24 8:00 - 9:00 20 0 20 9:00 - 10:00 4 0 4 10:00 - 11:00 4 0 1 11:00 - 12:00 0 0 0 12:00 - 13:00 0 0 0 13:00 - 14:00 0 0 0 14:00 - 15:00 3 10 13 15:00 - 16:00 12 21 33 16:00 - 17:00 2 22 24 17:00 - 18:00 0 5 5 73 59 132 In accordance with the above table, it has been assumed that a total of 20 vehicle trips are generated by staff employed by the Residential Aged Care facility during the AM peak period (7:45am - 8:45am). Similarly, a total of 32 peak hour vehicle trips has been assumed for the PM peak period (3:00pm - 4:00pm) In addition to the above, anticipated traffic generation by visitors to the Aged Care facility has been accommodated for by the application of a rate of 1 peak hour vehicle trip per 10 beds. J:\86000\8651 2\66\DOCUMENTSIREPORTSIREPORT Page 10 Arup TIFLEVFINALI0002REPORT_JUNE08_V2.D0C Issue 24 June 2008
Page 79
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment 4.2.4 Total Trip Generation A summary of the abovementioned trip generation rates applied to the respective land uses is shown in Table 4.2.4 below. Table 4.2.4 — Total Trip Generation “Blue Care” Use Number Rate AM Peak PM Peak Independent Living _ 55 _units 0.4 __ trips/unit 23 23 Apartments 54 apart. 0.4 _ trips/unit 23 23 Serviced Apartment 20 apart. 0.2 _ trips/unit 5 5 Staff (Total) N/A 20 32 Aged Care Generation . Visitors (central facility) 98 | beds 0.1 | trips/unit 10 10 TOTAL 81 94 As shown in the above table, it is anticipated that the subject site will generate 87 trips in the AM peak period and 94 trips in the PM peak period. , J:\86000\86512\661DOCUMENTS\REPORTSIREPORT TITLE\FINALYOOOZREPORT_JUNE08_V2.D0C Page 11 ‘Arup Issue 24 June 2008
Page 80
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment 4.3 Traffic Distribution The assumed distribution of trips generated by the site is determined based upon the anticipated arrival / departure split and the origin / destination split of trips. 4.3.1. Arrival / Departure Split For the purposes of this study, it has been assumed that the Serviced Apartments, Independent Living Units, Apartments and visitors to the Aged Care facility have the following arrival /departure splits. " 20% arrivals / 80% departures during the AM peak period; and * 80% arrivals / 20% departures during the PM peak period. The application of the above distributions results in the number of arrival and departure trips shown in Table 4.3.1 below Table 4.3.1 — Arrival and Departure Split AM Peak | PM Peak Use Number Rate Arr. Dep. | Arr. Dep. Independent Living 55 __units 0.4 __ trips/unit 5 18 18 5 Apartments 54 apart. [| 0.4 __trips/unit 5 18 18 5 Serviced Apartment 20 apart. | 0.2 trips/unit 4 4 4 i Staff N/A 20 0 12 21 Aged Care Generation Visitors (central facility) 98 beds 0.1 _ trips/unit 2 8 8 2 TOTAL 33 48 60 34 4.3.2 Origin / Destination Split The distribution of site generated traffic, or the assignment to the surrounding road network, has been assumed based upon an understanding of the nature of the proposed development, the surrounding road network, and local residential catchments. The following assumptions were made accordingly: * 60% of trips generated will access the site from the north via Ben Lexcen Drive; * 15% of trips generated will access the site from the east via Lipton Street; and = 25% of trips generated will access the site from the south via Ben Lexcen Drive. In addition to the above, it has been further assumed that of the 60% traffic accessing the site from the north: " 6% will access the site via Girraween Court: * 11% will access the site via Heathland Drive; and = 43% will access the site via Ben Lexcen Drive further to the north. The resulting volumes are shown in Appendix B. J\B5000\865 12166, DOCUMENTSIREPORTSIREPORT Page 12 Arup TITLE\FINALIO002REPORT_JUNE08_V2.00C tssue 24 June 2008
Page 81
Blue Care Property Development Unit Biue Care Sunrise Beach : Traffic impact Assessment 4.4 Intersection Analysis Based upon the background and development traffic volumes in 2019 (predicted in sections 4.1 and 4.3 of this report respectively), it is estimated that traffic generated by the subject site will only increase traffic through the Ben Lexcen Drive / Eenie Creek Road / Heathland Drive intersection by approximately 2.4% in the AM peak period and 4.6% in the PM peak period. Given the low impact of development-related traffic, detailed intersection analysis is not considered warranted. This approach is supported by the Department of Main Roads’ Guidelines for Assessment of Road Impacts of Development. As such, detailed intersection analysis has been undertaken for the following intersections only. * Ben Lexcen Drive / Grasstree Court / Lipton Street; and = Ben Lexcen Drive / Girraween Court. Detailed analyses of these intersections have been undertaken by superimposing the predicted site generated traffic volumes and background traffic volumes for the 2019 design scenario (for both the morning and evening peak periods). It has been assumed that the geometry of the two intersections in 2019 witl be the same as those currently in operation (i.e. both will be single lane roundabouts with single lane approaches and exits). The results of these analyses have been summarised in tabular form below. Each table makes reference to three intersection performance criteria. A description of each follows: Degree of Saturation (%) — This is the ratio of demand flow to capacity. Average Delay (sec) - The average delay per vehicle in seconds incurred by vehicles over the modelled time period. 95" %ile Queue — A queue length measured in metres for which only 5% of queues are equal to or greater than this length. JABEOOO\W8ES 1 2166\DOCUMENTSIREPORTSIREPORT Page 13 Arup TITLE\FINAL\O0O2REPORT_JUNEO8_V2.00C Issue 24 June 2008
Page 82
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment Table 4.4a —- Ben Lexcen Drive / Grasstree Court / Lipton Street Intersection Analysis Results: 2022 Design Year Peak Approach Movement Degree of Average 95" Percentile Period Saturation (%) Delay (s) Queue (m) Left 44 9 28 Ben Lexcen Drive (South) Through 44 7 .. 28 Right 43 15 28 Left 8 8 3 Lipton Street (East) Through 8 8 3 Right 8 13 3 AM Peak Left 36 6 20 Ben Lexcen Drive (North) Through 36 5 20 Right 36 12 20 Left 20 8 10 Grasstree Court (West) Through 20 7 10 Right 20 14 10 Left T°) 9 10 Ben Lexcen Drive (South) Through 20 7 10 Right 19 14 10 Left 6 7 2 Lipton Street (East) Through 6 7 2 Right 6 13 2 PM Peak Left 31 6 15 Ben Lexcen Drive (North) Through 31 5 16 Right 31 12 15 Left 25 6 12 Grasstree Court (West) Through 25 5 12 Right 25 12 12 JAG6000\86512\66\DOCUMENTSIREPORTSIREPORT Page 14 Arup TITLEVFINALWOC2REPORT_JUNEO8_V2.D0C Issue 24 June 2008
Page 83
Blue Care Property Development Unit Blue Care Sunrise Beach Traffic Impact Assessment Table 4.4b — Ben Lexcen Drive / Girraween Court Intersection Analysis Results: 2019 Design Year Peak Approach Movement Degree of Average 95" Percentile Period Saturation (%) —_ Delay (s) Queue (m) Left 59 10 43. Ben Lexcen * Drive (South) Through 59 8 43 Right 60 16 43 AM Peak Ben Lexcen Through 27 5. 14 Drive (North) Right 27 12 14 Girraween Left 18 4 9 Court (West) Right 18 14 9 Left 27 9 15 Ben Lexcen > Drive (South) Through 27 6 415 Right 27 14 15 PM Peak Ben Lexcen Through 65 ‘ 5 19 Drive (North) Right 65 12 19 Girraween Left 18 7 8 Court (West) Right "18 13 “8 The above results demonstrate that both intersections are predicted to operate well within acceptable limits during the 2019 morning and evening commuter peak, with the intersection volumes and geometries assumed. , JABG0O0\865 1\B6\1OOCUMENTSIREPORTSIREPORT Page 15 Arup TITLE\FINALWOOO2REPORT_JUNE08_V2.D0C Issue 24 June 2008
Page 84
Blue Care Property Development Unit Biue Care Sunrise Beach 5 Traffic Impact Assessment Conclusion All access to the proposed Blue Care Facility will be from Grasstree Court. The proposed development will effectively result in the full build out of land surrounding Grasstree Court. Grasstree Court is a cul-de-sac and does not service through traffic. The only vehicles that will use Grasstree Court will be those associated with Blue Care and the existing Uniting Church. The proposed aged care facility will comprise of two precincts: Precinct 1: Located on the northern side of Grasstree Court — 96 single bedrooms (units) in a residential aged care (RAC) facility - Two (2) single bedrooms (units) in respite care as part of the RAC. Precinct 2: Located on the southern side of Grasstree Court — 55 independent living units (JLUs) in villa style accommodation - 54 independent living units in four (4) apartment buildings - ~ 20 serviced apartments and a central facilities buiiding In determining the predicted traffic generation for the site, reference has been made to the RTA Guide to Traffic Generating Developments, 2002. Using the rates stipulated in this document combined with-engineering judgement, we have estimated the predicted traffic volumes at each of the access points during the morning and evening peak periods. Being an aged care facility the site is a very low traffic generator. We estimate that the subject site will generate in the order of 81 trips in the AM peak period and 94 trips in the PM peak period. Intersection analysis has been undertaken based on the above trip generation for the 2022 design scenario (i.e. 10 years post completion of ai] stages). The analysis has been undertaken for the following intersections: ~ Ben Lexcen Drive / Grasstree Court / Lipton Street; and ~ BenLexcen Drive / Girraween Court. The results of the analysis indicate that both intersections will operate well within the acceptable limits of operation for the 10 year design horizon. We believe the proposed Blue Care Facility should be approved from a traffic engineering standpoint. 4JN86000\865 12166; OCUMENTSIREPORTSIREPORT Page 16 TITLE\FINALIO002REPORT_JUNE08_V2.00C Arup Issue 24 June 2008
Page 85
Appendix A Background Traffic Volumes
Page 86
Ben Lexen Drive
Benteen Dive] —x
JAG5000\8651 2166\Design\Data\Surveys\
SIDRA volumes.xis : Background-Report
Grass Tree Court
Lipton Street
Grass Tree Court
Background Traffic - AM Peak
Eenie Creek Road
Background Traffic - PM Peak
12 —*
102 —>
2—v) 0 75 21
2 7S{ al v
ana
131 « [4— 70
<— 106
Vv 27
Lipton Street
Heathiand Drive]
Eenie Creek Road
Heathland Drive
[N /}——
Lp
[N }——
ARUP
Ben Lexen Drive
Page 1 of 1
Printed 25/06/2008 Time 2:16 PM
Page 87
Appendix B Generated Traffic Distribution
Page 88
Development Traffic Generation - AM Peak
Grass Tree Court
\Girraween Court
Eenie Creek Road
ARUP
Ben Lexen Drive
yoo 0
Al
2 o
A_ 0
< 4
ms _}-—
Lipton Street
Development Ti
ic Generation - PM Peak
Grass Tree Court
Eenie Creek Road
8 5 4 0 0 0 0
[eileen on] —q—z—p FA __al_¥ aie
0 9 o {|A~ 36 A_ 0
<— 26
‘ [N |
[{_——-___»
Lipton Street
JNB6000\86512\66\Design\Data\Survays\
SIDRA votumes.xis : Davelopment-Report
Page 1 of 1
Printed 2508/2008 Time 2:15 PM
Page 89
Appendix D Predicted Eenie Creek Road Traffic Volumes ee eee ‘
Page 90
DRAFT Table 2-2 provides a summary of the traffic volumes used in the analyses for the four-way intersection. The pedestrian volumes used in the analyses are given in Table 2-3, These are 15- minute peak volumes. . Traffic volumes for the intersection when Eenie Creek Road opens have been calculated using data supplied by Noosa Council and the traffic surveys carried out in February 2008 by AusTraffic. Volumes for movements to and from Eenie Creek Road were determined using data from future years are a pro rata approach. An annual growth rate of 0.75% has been applied to all traffic and pedestrian movements to obtain future traffic volumes for the traffic analyses. This growth rate is from Maunsell’s recent traffic assessment for David Low Way / Solway Drive. Table 2-2 Four-Way Intersection - Traffic Volumes, 16 minute Peak Pertod . 2008 2018 2028 AM PM AM PM AM PM Ben Left 62 50 67 54 72 57 Lexcen Through | 37 30 40 32 43 34 Drive (S) TRignt [3 3 4 3 4 3 Heathland | Left 18 14 19 15 20 18 Drive (E) [Through | 110 88 116 04 126 101 Right 27 22 29 24 32 25 Ben Left 4 3 5 ‘ 4 § 4 Lexcen Through 18 14 19 15 20 16 Drive (N) Right 7 13 18 14 19 18 Eenie Left 41 33 44 35 47 37 Kn aa Wy) Through | 53 42 57 45° 61 49 Right 63 50 68 54 72 58 Table 23 Four-Way Intersection — Pedestrian Volumes, 16 minute Peak Period 2008 2018 2028 AM PM AM PM AM PM Across Ben Lexcen Drive 4 4 1 4 1 5 (S) Across Heathland 14 6 15 6 16 7 Drive (E) : Across Ben Lexcen Drive 4 1 4 41 5 4 (N) Across Eenie . Creek Road 10 16 "1 7 11 18 wm) Sunshine Beach Intersection Analyses - Ben Lexcen Drive / Heathland Drive / Eenie Creek Road \AUBNE1 FP001Vobs\Projects\60039334\4. Tech Work Ares4.3 Engineering\intersection AnalysestHeathland Drive\Reporting\intersection Analysis_RevA_20080506.doc Revision A & May 2008 Page3 MAUINSELL | AECOM
Page 91
Appendix E Intersection Count Volumes
Page 92
aaa Fs 3 BEyee
2 BRE ee = pou 2 2 Pe erny = maSead
PMPeak| 2hrTowwi|S & Sas aS a 23 AM Peak} 2hrTotal] S'S SoS a 8 o z3 VITOR Z
zzzz2z222 gm Soy «|B RBRRBRRZE gm Beess
2 . 2 FRR
- : ~ wo
Q 3+ co oN © © © 0 flight Vehicles 9] 13] & © a Nw = © © [Light Vehicles zen
_ : ££ Fe
. : 1” 8 g
o Do o 0 0 © © © oO HHeavy Vehictes he. .- Wo © © © © co © 0o |Heay Vehicles gged
: = st = ga< 8
— = 3 x oS
; 3 3 & 6g Go
of oo © 2 © © © OWNotApplicabio | § i. gy: Oo © © © © © © olNotappicanie | 3 reas
2 fi: 3 Bo 2
efPoweeg w ope e Tage oF] OO , = RoK< OB
a) :3]4. 0, 0: of © 0|Total |. Total . SABAF
“ . el coke DR TL lL. Seo. Sues &-
wR OE
go
0} “doo 0 0 Oo oO Oo o [Cyalisis Cyclists xs 3 z
o
Qa
: 2
79}. 118)> 2 Ze mo SN ¥ [Light Vehicles Light Vehicles 5
i $
: 2
oO}. ho 2 © © © © © © Hea Vehicles Heavy Vehicles z
= =
° = 3
3 $ a
oo 00 0 © © © © © © |NotApplicable | 3 Not Applicable | 3 ow
. 5 § 8
- = 7 - a
conf n v ‘bs >
oT Total. *
Q doo 9 oO 9 oO oO OO [Cyelisis oO 0 OC © © [Cyelists o
#
— ? 3
190] 3712 8 ¥ Se ® B ¢ Light Venicies i Zz BN SS ~|Loht vehicies z
7 ; 3
8 14). = w = © N © & Heavy Vehicles 18) ¢ 28} ~ om a ~ & w& ‘nN [Heavy Vehicles °
z| i —|3 a
. < . 2 2
9 , Wo o 0 © © © © O'|Not Applicable | 3 oe , 7S0 So SO SO © SC CO ONol Applicable | 3 ¢
3 j 3 &
7 — : Ae 413 —— —F 2
198) awe seesea 8 Fotat 7 s93f) oy 160.8 BR oN- Bas “
«|
0 ooo 0 0 Oo Oo oO [Cyclists 4o 40 ON NY OC CO © O [Cyclists a
‘ pi}
4] 4]o co 0 0 © Oo = w|Light Vehicles 3]. + 8m oO & & = © = 2B [Light Vehicles goit
- cE
Y go:
9 . Oo 0 0 0 0 © © © Heavy Vehicles Oo}. Wo © © © © © © © JHeavy Vehicles gui
= « z= 5 i
2 ° g| 9 :
o| t}o © © © © © © © Not Applicable | § ol lo 0 0 0 0 © © OfNotAppicatle | § | = at
3 a] ei
. ay, eee 7 = woe TS - : a g i
4 4].0° 0 0.0 © o = w/Total BBP BO a ae = On [Total - S 3
0 Moo oo oO Oo Oo O [Cyclists ote Hoo oO oO oO oO © Oo [Cyclists
157 2118 3 BRB Se Rs Bllight venicies 325] .,) 455/29 B BL YS BY |S |Light Vohicies
-- + 6] Ane Gon mo w Oo NW = [Heavy Vehicles 22) 6: Re B0LO SW Wo w @ = 4 Heavy Vehicles
z : z
i) Wo Oo © © So © © © INot Applicable 2 © © © © © © |Not Applicable 2 2
2 2
. ” . ee Ve B wo ae ‘por ® a
163 300)8 3.8 8 SRS. P| Tota B.8.8 8 RB Tota: ‘
: : ’ since ap ak vo] Fe
ye a
ae, _ ooo Oo Oo = © Oo [Cyclists coon oO [Cyclists
17 32]}0 © ma aN mw w ~ Light Vehicles a3 © © o w {Light Vehicles
: q
RO .
o] ” 0}o © © © © © © © Heavy Vehicles ous: Oo o o © © © © © |Heavy Vehicles
= =
° °
5 8
0} Vo Oo So 8 8S © © O|NotApplicable | 3 © © © © © © © JjNot Applicable | 3
8 . a
2 2
7 ; -lo st 7 >
417 y 32h oe : a Total
los + . pee
0} Wo oo 0 oO oO Oo Oo [Cyclists o 0° © [Cyclists
45 65] a o ~~ S w& 2B [Light Vehicles api L 14J- @ a © w& © © © [Light Vehicles
Q 0}0 © So & G © © © Heavy Vehicles Oo, Wo Oo © © © © © © Heavy Vehicles
5 5
es 8 3
OO; oy; 0}e © o o Go O © G|NotApplicable | 3 Not Applicable 2
wees 2
; 8 3
Th. ee we re pape= a) SN : EREA ca)
4si, weai@ a NTS wR Total: > . 2 Total
eos OEE eae Soaps yy oa! ed ‘3
4 2200 © = © Co [Cyclists Cyclists
70 16lm 5 Roe gs @ g &|Light Vehicles T4}°> 1515 Bt oF ZS ~ ©& [Light Vehicles
< . : -
QO]. OD}o © © © © CO © © JHeavy Vehicles “Bo oC © © © © © JHeavy Vehicles
, 3
0 Blo o 0 © © © o o \NotAppiicatle | 3 © © © © O|JNot Applicable | 3
2] .
2 2
7 de : — pro fe = 3
70°55 426) BY @ 2° @ |Totat : :
wey : g ne 3
a ' Wooo oo oO Oo olCyelisis Q _,yeoooooooe Cyclists
| : ecaooaa eo > » o} eocoecca a > 2
: g &
& s
, § g
Q Jao ocecoeo oc Oo Bw zB Udoocoaac oo 8 om z
3 a
3 3
0 YJoooron0o0ce oO 9 ito eo ooo oo oO a
INNOD9 NOILIISUSALINI TVANVA OLA VALSAV
(qy40u) aatig uaaxe] uag
Page 93
i i] Sz2292 2
geese evvev = See rerarnry = =
S = a = 5 3 “26
PMPeak| 2hrTota]S & Sa 8 & SG zz AMPeakl 2hrToal]S & SxS & BR z3 Euugks a
2PP2zF2222 gm ZEERREEE gm 88853?
& = 3 Srre at is
‘ant Veni By ay x
1 2]}0 0 = © © o © = ILight Vehicles 3 4}0 0 Oo = B® & © 0 |Light Vehicles Sxmmof- 8
B98 3
es 83 =
ars 8g e s
0 tla 0 © © © o © 0 fHeay Vehicles of! s]}> © © © © © © a lHeavy Vehicles a@$ses Zz
z RRLGA<
i : reERS OF
Q 0 0 © © © © © o|NotAppicabie | 8 0} Qo 2 © © © © © OINot Applicable | § S''gig m
2 - 3 S Sas 2.
° > = ZPawkt zs 4
1 Yoo +0 © © o (Total 3 440 oo a ww 4 © offotat SSAaRBS FT
ZSOuSes wg
geseei g
a Yo.0 0 0 © © © © [Cyclists o Joo 5 0 8 © o oltycists 255 a2 fo)
8 g° 5
0 Woo © © o oO Oo 0 ktight Vehicles 0 010 © © © © oO © oO fLight Vehicles 3 é Z
g a Qa
: & S
0 Wo o © O © © © 0 Heavy Vehicles a. Wo o © © © © © o Heavy Vehicles o 3
=
2 3 2 sj
0 oo © © © © © oO \NotAppiicatic 3 Q| 72 2 © © © © © O|JNotApplicabe | § g
2 a 2
s 8
0 Wo oc ce © © © © offota Q] 710000 © © © Offota a
5
Q Bo ooo Oo oO Oo 6 [Cyclists 9 Boo oo 8 Oo Oo oO [Cyclists me
- gsr
ee
269) 51718 8 YB RS F §& |Light vehicles 273] a74/2 3 SB QBN SZ R |Light vehicies 2 w
a
z &
"8 Wis oN oO = & © & Heavy Vehicles 15] 26) 2 wa a N uo w WN [Heavy Vehicles 2
5
2
0 Wo © © © © © © Oo Not Applicable 3 a Wo 6 © © © © © © |Not Applicable | 3 &
a a
2 2 ~
= e w
277 s788e8age 8 |Totat 283; 408 838.8 8 S slrota a x
te
4 oo oO oO = © o [Cyelists 2 230 N09 oO oO oO oO o [Cyelists
at *
: : ioe
79 IM}o Zo ao S a B |Light Vehicies 104] 14318 3 BS Fw a oO lLight Vehicles 2 rit Ci-s
: ar ig
gi ig
1 tlo @ © © © © © 3 |Heavy Vehicles Z 2]0 oN © © © © © |Heay Vehicles geri. tie 8
= = 3 3 3 3
g g| 9 Pog
| Qo © © © © © o oO NotApplicabie | § 0 W910 © © 2 © © © o|NotAppiicabie | 8 #344 wie f
3 a] 3° is
= = 3 i 2 3
80] Majo Goma o 8 F S]Totat 106] 45/8 8 2 5 to | ©ffota <n preg
¥ >
0 Ho oo eo 8 co Oo o [Cyclists 0| tooo oao aod © Cyclists
. atefedeencpeccboodurdeme
w
5 Sw oO oO + = % = = [Light Vehicles | 7m w N oO = & w& & [Light Vehicles aa Aw
=
0 Oo oo © © © © Oo WHeavy Vehicles oy 2 Oo 0 © © © © Oo |Heay Venicias 8
~ z = =
a Bo oo oO © © © oNotApplicable | 3 9) Bo oO 0 © © © OINotAppiicabie | 5 a
3 3 9
a i — |: wa =
5 Se oo a a ws 4 Total 6 Wy we No aw Nw ow & [Total 2
. 3
4
o Bo oo oO 8 oO © Oo [Cyclists 0} 3000S © © oO o [Cyclists ~
90) 1s51= Sa 8 AB BD S {Light vehicies 309 36/8 2S £8 BS a [Light vohices
3 410 Oo Oo = & = = & |Heavy Vehicles 3 3}0 © © & oO © © Heavy Vehicles
= z
i :
o} oo SO 0 © © Oo |NotApplicatle | 3 0] %o oo 2 © O © OINotApplicable | 3
3 5
2 2
“ bid ~_ = o 2
93 19/2 3 aR SNR. elrota 312] 38 2348 2 & afro
O} Yooeo oO co © © oO [Cyelists 7 9- mw = + 0 oO = a [Cyelists
0 Do Oo © © © © © Oo |Light Vehicles 9 Go Oo 6 oO OO © Oo |Light Vehicles
| 00 2 © 0 © © © OC Weavy Vehicles 0; 0 2 2 0 © Oo © O JHeavy Vehicles
= e
3 &
0 B12 0 S & © © © Oo jNotAppiicable | 3 0} Wo © © & © © O OINotAppiicatle | §
a 3
- 2 &
s 5
Q He oo So & © oO Offotat 0| lo ¢ 5 &o 8 © © Offotat
9 Ho FO oO oO oO oO Oo [Cyeists 0} We o0 fF Oo Oo Oo f[Cyelists
54 Ma Fo Fo @ FS F ILight Vehicles 83 127753 8 BS a R = N |Light Vehicles
0 4Jo ~ © © © © © 0 |Heavy Vehicles 3 Yo ow oS © © © Oo Heavy Vehicles
z 3
g 3
0} 010 9 & © © & Oo OC INotAppiicable | 3 | Bo oo 89 oO © © Not Applicable | 5
3 2
oo i o
51 Blo FoF © & FS S]Totat 86 WS a SS sz 3. [Tota
0} yoo + oc oO oO © O [Cyclists 1 jo Oo = 0 © © © [Cyclists
@fo j a80g
Page 94
NNO) NOLLOASUSINI TVANVA Dd VULSnV
(uj40u) aatig uaxay vag
2 ? = ODrure
" jg@eeeaeee EL ‘ -|e ree rerxrxy E seeker
PMPeak| 2heTotallS & Sa 8h 8 a zz AM Peakt JS ASSESS z3 Euyok se
rTVyeVPVMVVVYV om : PRBBRE a Bae af
ESeeSe LE 3 BrEz2222 g SEES.
= : “ 2 BARR
. . , a aw
Q slo o © © © © © o ltight Vehicles ql joo occa 0 Light Vehicles §$mresg-
- : - = 9 a
eee
oy 288
qj Oo 0 © oO © © © © |Heavy Vehicles ol. jooaooaoao eg Heavy Vehicles @8°s oo
5 z BR ReS
3 g pea gy
0 Oo © 0 © © oO © 0 \Not Applicable 3 ol* Yoooacoe INot Applicable | § grtg =
. 2 - 3 a = 2
; en 7) F o ; : : © SAT 6
9 Woo 0 © oe © offotal f Jo oo oo o Total 6° GESnk EE
vos Spe . wo. . ZBOuee
; SRSes
ol. Bo oe 0 0 oo a lCyoists o| * Yooacan Cyclists aS 2
. % 9
ra - 8 Z
46 s~ SS Bo & GZ iLighi Vehicles 56] * so Stages Light Vehicles 3 &
— - 3 g
2]- Je 2 © © © = © = |Heavy Vehicles z 3}i so OO ea NS Heavy Vehicles S
1 - is : =
2 g 4
3 i. &
a Q]o 0 © © & © © O|NotApplicable | 3 of s fo ooo oo Not Applicable | 3 x
: 2 : 2 a
- 7 + Doe pee Ve 3 i ” 3 (EB
48] ~ Bn Ss 2 die © BS Biro iE Blo B 2s SS a efrotar ‘
_ |. : us ~ |i 2M Vt |? x 2
j a
0 Woo 0 0 oO oO Oo Oo [Cyclists o]5 Joocoao oo Cyclists SF
? 8
° 7 ; a wD
22% 4s £2 S38 S S Blight vehicies 445] % = 3S FS SN lugnt venicies 9 g
$ 8 6
7 oS
12 Hho a = 2 a a = © |Heavy Vehicles 19] z. Nao a Heavy Vehicles 2
- z a = e
2 g
& a . s z
a B}o © © © © © © O|JNotApplicabie | 2 0}: Wooo aooo Not Applicable | 3 e
2 “ : 2 2
. ar z oft 2 § ao ; 2
aif at A SB SR BYro : 2-823 8 BERS
can = Le | oe o
x 5 tfedees|ececbercbefew
8 Bho oo Oo = © = @ [Cyclists 34] Borogew Cyclists
‘ of 4
0} so © 59 Oo © O © O |Light Vehicles o) i Joococan Light Vehicles 2
Fi
al Moo OC oO SO O OC O HHeavy Vehicles 2 a Yooscodcnd Heavy Vehicles 3
=
Spcowe | 3 : | §
0 B]o © © © © © © © |Not Applicable | 2 9 i Jo ooo co o Not Applicable | 3 z
2 : 2) ¢
oe 8 ae c ja] 2
0 Dlo:e © © © © 0, offotal ...” Do 0-5 o 5-0 Total = :~; >
“he To gee ge 84 2 MR =
ol: Wooo oO oO oO Oo O [Cyclists Boooacaond Cyclists
=
| Wo oo oO S OC OC O flight Vehicles os Bio occ oo Light Vehicles awa w
eas . =
ae - O) hi OokotOo7"o Go © © © |Heavy Vehicles -+—70 COD oO Oo Heavy Vehicles 8
5 5 5
= 3 3 5
ol - Wo oo 0 Oo © © © \NotApplicable | 3 Yisococcoond Not Applicable | 3 a
: sos : Ef
7 ; ? ree “ a pt : : e 4
9 Jo o 10.0 o © © o/Total | lo o co o.cise Total. - gg
nn i std : g
Gq Moooooao oo Cyclists Gocco oo \Cyctists ~
9 Do oo oO Oo © oO O [Light Vehicles Joeocaooo fo Light Vehicles
a Dlo © o © © © © Oo |Heavy Vehicles | 4 Mocooa ed Heavy Vehicles
- z =
: : ;
o} - Wo oo © O © © O Not Applicable | 2 a toocecaooa Not Applicable | 3
zo 3 ~ 2
Pr. - Ta * 3s 5 - ; =
9 Woo @ © © © 0:0 [Total if cooeco Total
a} ho oo 0 © 0 o olcyists of jWooeco0 0 cyclists
0} Boo co © co © © Oo |Light Vehicles Boo o oO ao Light Vehicles
0 tooo © © © © © Heavy Vehicles} — a t Joococao a Oo Heavy Vehicles
z ‘ 3
$ E é
0 Bo © © © © © © O|NotApplicable | 3 Oo} Moooooe Not Applicable | 3
a 3 e 3
3 3
a :
. BFo- co.
) Bo oo Oo Oo oO Oo Oo [Cytlists O}- dooce a © Cyclists
5
sR y : ‘ ,
0 B}o co oO oO © © © 0 flight Vehicles Q} ; Joocoo co 8 Light Vehicles
ol. lo oc Oo © & © © © |Heavy Vehicles = ooo o Heavy Vehicles z
: ;
Blo © © © © © © o|Not Applicable | 3 ecco Not Applicable | 2
2 : 2 2
. eo eS te] & a
Q ool eS
. ty Pee) akgethey
Q dooce oO 8 Oo Oo Oo Cyclists ooco Cyclists
ooccooco > oye Yjooaoocco >
3 a
ecco ooo ow e Woccaan oS
5 Ss
3 *
oooo oo Oo oO ° Joa ooo eo fo} .
2 2
3 =
a Wooesceec coc o o 0 tococaccndc 0
fo z aBug
Page 95
3 . = O9Eg
Bees = 22 ee = 2a 8
* a . = a
the Tol] S & 8B z3 thrrota® 8 a 8 ze BuRzZ
om gm gs oS
Bzes a 2222 2 gaBS
#22
Do o © a [Light Vehicles Oo © © o [Light Vehicles S 8 es -
oes 5s
BAe 8
Dho © © © |Heavy Vehicles 019 © © o Heavy Vehicles = $ a =
= 3 8a< 8
3 , 2 a’n8
fo © © © Not Applicable 3 Qo © © © [Not Applicable 3 gg Os
a
2 °
2 4 Bae S8
Yo o © olfota Oo o 6 ,0|Total ge Se
: Son
= = SB aea”
58 3 oy
Wo o © © |Cyelists Do © © © |Cyelists noe OS
S a. oO
e 3.
ae &
24 o © — [Light Vehicles 4]= & © © Light Vehicles 5 3
s 3
a a
Dho © © © |Heavy Vehicles Bo © © © {Heavy Vehicles 3 3
= z= y a
2 3 3 ”
Yo co © © |Not Applicable | 3 019 © © «© INof Applicable 3 a
& a oO
§ 3 oO
2 od N nN 2
Ya eo o &!Total 4)—- w © © [Total 5
m ¢
= g
Oo o © © [Cyclists 1J~ 2 © © [Cyclists a 5.
= 6
, So wo
Oo © © © ILight Vehicles Do © © © |Light Vehicles Q g
g &
Qo © © o IHeavy Vehicles O10 © © © [Heavy Vehicles a
z z g
i i 29
Oo © © O|Not Applicable | § 90 © © Not Applicable | 3 ge
i i £3
7 ° o
Do © © Offotal Wo © © © fTotal Se
a
stibee. >
Do o © © |Cyelists . Oo oo o [Cyclists ‘ a
, , wo :
Bo © © © |Light Vehicles Oo © © @ ILight Vehicles g it 3
a | i
gf i
Q]o © © © [Heavy Vehicles 0] © © © |Heavy Vehicles 8 _ -—
: = 3 3 3
5 g|} os } :
x : i
Qo o & Not Applicable | 3 Do © © © \Not Applicable | § = nm : nu
3 2/ @ } i
* “| 2 i :
Oo © © © {Total Wo o © offotal 5 i Fe
; y >
Oo o © © [Cyclists WoO o © o |Cyelists
0] © © © [Light Vehicles OQ] © © © Light Vehicles
D}o © © © |Heavy Vehicles O12 © © © |Heavy Vehicles
: ;
O10 © © © |Not Applicable Fi 0]}5 © © © INot Applicable 2 2
2 2
ow wn
Wo © © © /Total Go © © 0 fTotal
Wo o © © (Cyclists ‘ Wo o © o [Cyclists
Go o © © [Light Vehicles WS © © © [Light Vehicles
Qo © © © [Heavy Vehicles Oo © © © Heavy Vehicios
; 3
2 2
Oo © © © |Not Applicable 3 019 © © © INot Applicable 2
3 2
a : o
Goo oe ofTotal Oo o © © [Total
Wo o © oO [Cyalists Oo © © o [Cyclists
Oo © © © [Light Vehicles Wo © © © [Light Vehicles
Ofo © © © |Heavy Vehicles ' Qa © © © jHeavy Vehicles
=
g 5
fo © © © \Not Applicable 3 Q}0 © © a |Not Applicable a
2 2
x ° x
Dfo © © © |Total Oo © © o&/Total
Bo © © © [Cyelists Do o © © Cyclists
0] © © © [Light Vehicles - 00 © © © ILight Vehicles
Oo © © © [Heavy Vehicles Oo © © © [Heavy Vehicles
z =
2 2
3
Of} © © © |Not Applicable a 0}0 & © © JINot Applicable 2
2 2
® : =
do o © © ffota Wo © © ofTotat
Woo © © [Cyclists Bo o © o |Cyelists
Joooe > 2 Ho a0 0 > »
z 3
3 d
Jooco w 2 looas ow =
3 3
3 3
Do aoe oO €aoooodo oO
LNN09 NOLLOASAALNI TVANVIA DIG VaLLSAV
(4400) aatiq uasxa] wag
Page 96
EIN10O9D NOLLOASUALINI TVONVA OLAVYLSAV
(q)40u) aalig uaexay vag
= : s Zroren
GRR RE RE 5] Ti |e @ @ @ ean a = SZ&ss
PMPeak} 2hrTotafS & 8 28S Sa ze AMPeal|! 2hrToa}S & SASF Sa zz week z
22222222 3* UO IBEEEEEEE gh ggzeeé
3 i =* 3 Fes at
7 w
0 (lo oo 8 © © © Oo light Vehicles ay. “.4fo 0 = © © © © o ILight Vehicles nz é Sw
ay 33
: = ee ee
o| * 030 oC &@ © & © © © |Heavy Vehicles Qi ' Po o © a 6 © @ © |Heay Vehicles g g S 9
. : z : z Ra< §
=
. 5 ma ; 3 RABY
Ao oo & Oo oO © © Not Applicable 3 Fo 2-- Wo oo © o & © OYNof Applicable | 3 tee g
: 3
a 2 2 Be g
~~ 4 = oe : - = a OS & =
9 lo oe © © © © offotal’ tfo'o 4.6 © © ©. 6 fTota esBuz
: . . . eSsen
Sk OS 4
. ‘ nw
oo. Wooo oO 8 oO oO Oo Cyelisis Oe flo oo 0 © o Oo Oo [Cyelists x gs
. Ba
: a 3
7 11a 8 SSS st A Bltioht vehictes sa), S88 SOE OG A © & = [Light Vehicles z
:
. 2
: a
4 4]2 © 9 @ © © © & |Heavy Vehicles 42] 2 1930 w NN N ow 4 4 |Heavy Vehicles g
i = , = QO
2 — i 2
Q d}o © © © © © © ©|NotApplicable | § oi do © © © © © © o|NotApplicable | § 5
4 3 2 wu
weer oe he * N . : x . : x 5
a1 wssha 8 sg 2 Sta 4 lteter Tole ea8 22 8 © slroa 2
| . > my Wak . spa tk Cony ed 2.
Oe Yoo oo 6 © © [Cyclists yo. oe © + oo © a [Cyclists wo
2 §
~ > ~ 2
ara] - aa]8 2 8 & PAB Bltight Vehicles alt. /- 136442 ER Ag = © o@ [Light Vehicles 8
os 3
po . : a
5] ‘Mo a my = oO NW @ w& |Heavy Vehicles aye +. 94 = © oO = w& = [Heavy Vehicles 2
= ; = a
a e
3 2 5
_ Oe oo & © © © © \NotAppiicabic | § © 0 0 © © © O\NotApplicable | § é
L 3 Si. 2.
7 v ots, o aloes we
479). a7 8 8 Total". gy SBRaR
: & sie E o
; > tb odieefecesbershobow
al: 330 = © oD ON © O [Cyelisis o9o9 09 0 © © 6 [Cyclists
ot 4
42 Ble + + Sm © x F [Light Vehicles 26} » 35) ~ wo bw o @ w [Light Vehicles g
a
; :
0 —o oO Oo oO S © OC OC |Heavy Vehicles Wi: Yo o Oo = & © © © |Heavy Vehicles a
. 3
5 é| 9
2 5 3
0 | Mo oo © © © © oO jNofApplicable | 3 ol. Io oo So o © oO olNotApplicable | 3 €
2 a] ¢
vfs ot ae a 3 cae s g
aan. Total: : Total ¢ S
1 4 r vat =
al* tooo 6 6 oO Oo [Cyclists Cyclists
1 oo Oo G6 Oo Oo © & jLight Vehicles Light Vehicles
QC
2 299 9 © © 6G Heavy Vehicles * Heavy Vehicles ooo
z z 5
9 c]
3 8 2
Oy. Wo 02 9 © & S © O|JNotApplicable | 3 ‘Not Applicable 3 a
g a
3 3 s
sot par pe v8 a =
1 iJo so oo Total's * Total 3
: 8. : Tht . wet °
7 s
oO, “ Wooo oo Oo © Oo [Cyclists Cyclists
13]. 2)my Ow vw N & & w fight Vehicles Light Vehicles
9 90 © © © & O © © |Heavy Vehicles Heavy Vehicles
= 2
) o
3 3
0 Bo © © o GO © © OjNotApplicable | 3 Not Applicable Z
3
3 3
ae : Te a . "| @ 4
co 2) ny ose: Total Total ~
: a MES 4 , :
0 Wooo o Oo O © Oo [Cyelists Cyelists
7 Blo a a = NO NK = [Light Vehicles Light Vehicles
4 jo oo © & = © © |Heavy Vehicles Heavy Vehicles
= =
° 2 2
0 Q]o © © © © © © @INotApplicable | 3 ot Applicable | 3
3 3
a “, "fun. 3 ~
a of Mlo a, .2 oN & N28 1Tolal.*
. wy mr Herc tg .
= 7 = .
0 ascaaec ec © o [Cyclists Cyclists
3 §fo = = © += ON @ |Light Vehicles Light Vehicles
oO]. fo o oO = & © © © |Heavy Vehicles Heavy Vehicles
i z : =
2 2
i és
0 t}o © © © © © © @|INot Applicable | 3 Not Applicable | 3
3
2 2
a - o sR. o
3 26) oe im :
yoy OSs 5 .
oj ' _itfo @ = 6 0 © & a [Cyisis Cyclists
Zfo [ a8og
Page 97
i 3 = ZProra
eee eee Ee SB, Se me exw e] Bs22s3s
' SRe Sa & & oO x a a
PMPoakl 2hrTotaps & Sa 8 & 8 a zz AM Peal 2hrToalfS & Sa 8 & 8 ao ze Suakz
22222222 gf BEEELEE: 3h gases
2 3 Frei
; , 2g
1 Jo © 9 8 oO © © & Light Vehicles 2 Jono + © © © {Light Vehicles mre fw
ogo
a
Seay
4 lo Oo 9 9 © © = © JHeavy Vehicles Qi 90 0 0 & © © © © fHeavy Vehicles gg Bo
= = &a< 8
2 Q SS NO uv
- 8 . 8 0@ 0 oa
0 0 © oo © © © © Not Applicable 3 0} Woo fo © © © © O|INot Applicable | 3 rd 2.
3
2 3 a g
3 o aAw< a
2 2]o0 6 oo © o & =/rotat 2 3Je =o 4 = © © offota sso
o : Sess
ym 5
9 Hoof Oo © oO Oo @ [Cyclists 9 Hoo FO 0 © Oo Oo [Cyclists gs 2
. &
S
2 4[o Ny Oo © © © = & [Light Vehicles 9 1]o 2 © © © © & © {Light Vehicles Q
Oo 0119 6 © © © © © © |Heavy Vehicles ol: Q}o a © © © © © a |Heay Vehicles . g
g e 2
3 3 2
0} Go o © © © o © 8 Not Applicable | 3 0 Bo © Oo & © © © © |Not Applicable 3 5
—# 2 wn
z <
: S Ss 5
2| 4fo ~ 9 © © © = = 1Total 0) lo 0 89 © © © & © [Tora 2
--|- . =
o
0} Moo oo © © oO Oo \Cyelisis 0} Wo oo 9 © © © 0 [Cyclists w
a
@ 8
° a
100) 190/53 3 SB RV BW & lhignt venictes a1 9715 3 SB 2 EN = hhignt Vehicies a
&
a
2 2]0 6 6 © © = © = Heavy Vehicles 5] Mom mn + mw & 4 4 Heavy Vehicles @
z 5 a
3 3 z
0 Wo o © © © © © @INot Applicable Fy 0 Io oO © © © © GO |INot Applicable 2 i
3 $ 4
3 + 3 .
102 ws 3 SNR RD Sirota 276) 48 22288 8 glrota seas
. a
Z| S}o a = = 1% oO © © [Cyelists 3 530 wo OC ON © 0 Cyclists
of 4
oi 3
” B)- 0 = © © wm = w Light Vehicles 49] 31fe mw NV wm @ 8 [Light Vehicles £5 i Ci.
mE i
9 3 :
. . x : :
1 1}o © © © + © © @ [Heavy Vehicles x 1 2} © & + © + © © [Heavy Vehicios say hin
z 5 3 i
; i) 5
0 }o © © © © © © © INotApplicable | 3 Oj 9.9 © © © © © © © \Not Applicable | 3 z st te
a Rl a ft i
* - —» oS 3 3
. N N c z i
12] 1442 o a2 @ & w = wl/Total 20) Blo ~w sm N NN KN Total $°To fre
. > t :
y ia
0 Yoo oo oO Oo © oO [Cyclists 1 Yo +2000 060 [Cyclists
deh edencepoedpacdeotoge
aR
0} 09 00 6 © © © © [Light Vehicles o 9}0 2 © © © © © Oo [Light Vehicles Od Aw
c
Ql Do © © Oo © © © © Heavy Vehicles x 0} Wo © 0 © © © © © JHeavy Vehicles 3
: 3 g
n
0 W}o © © © ©o © © © Not Applicable ; 0} ‘ Wo © Oo & © © © © INot Applicable 3 a
2 = s
: o 3 e
0 to © 2 © © © © Offotal 0 We oo & © © © Offotal B
‘ -
Q| foo oF 8 8 oO Oo © [Cyclists 9 Yoo a Oo © © Oo oO [Cyclists
Tal 13013 So SR FS Blight Venictes 21 Bit we Ny ww & o w [Light Vehicles
1 1fo 9 9 © © © © & |Heavy Vehicles 1 4 oo += © © © © © |Heavy Vehicles
5 z
8 8
0 Yo 9 © © © © & © I\NotApplicable | 3 0 FO Oo ao Oo © © © © {Not Applicable 2
: 2 3
: 7 . z z
75 34/8 2338 2 f Blrota 22 4} wo & a on a o w fora
0} SO 0.90 9 © © © Oo [Cyelists 0) Ho ® So 8 oO Oo © 0 [Cyelists
21 o> & 2 ww w © o@ [Light Vehicles 7 14m Oo wy Nm = & WV [Light Vehicles
0} 010 2 © © © © © © Heavy Vehicles 0 Wooo 6 © © © © |Heavy Vehicles
5 5
3 3
0} oo © © & © © © |Not Applicable | 3 0 Oo © © © © © © © \NotApplicable | 3
3 3
= =
a : a
21 Dio a ea ww w © o/Total . 7 14)n ow NN + NW NI Total
0} Moo eo Oo 6 Oo Oo Oo [Cyelists q| Bo oo oo Oo © Oo [Cyclists
63] BIS oF &@ S ~ & B |light Vehicles Ea as 3 S B © N w & |Light Vehicles
0) Wo 0 9 © © © © oO |Heavy Vehicles 2 2]o Oo = = © © © © |Heavy Vehicles
e s
3 3
0 }o 9 © © © © © © Not Applicable | 3 0) Bo oo © © © © © Not Applicable 2
3 3
a =
: a ‘ a
63 ws S223 ~ s yBlrota 83 Me gt fo ~ & affora
0 Joo O09 © © © © [Cyclists 6 Hoe DOO © Oo 8 [Cyelisis
0 tocococo ooo > Q Mooccxneea oe >
: .
a a
9 Wooeeo000 0 wo 2 Q Yoee eof oo ow g
= 5
a =
3 3
a Wooeeoaoa00nd oO ° Q MAsccocncaooaang QO .
2 2
a o
0 Mocean ae ao 3 9 WDomxn eB oO eo oo o
INNO) NOLLOFSHALNI TVANVI DIAAVaLsaVv
(q3400) aalig uasxe7] uag
Zfoz aBog
Page 98
Appendix F Swept Path Analyses
Page 99
= TREE COURT
———t
"TYPE J
> 3BIG |
————
TYPE HITYPE H!
see TANDE H ae 2B1G
_—!
—
YPE HITYPE H
TAPE H TYPE H fest 2816 |
4
1 TYPE D/3B2G
wea
TYPE C/3B2G
HE - - -- - ~
4
‘TYPE C/2B1G
FL
“TYPE C/3B2G
- HL di
TYPE D/3B2G
-
Le
I~ TYPE C/3B2G
TYPE pisezs
I~ TYPE C/3B2G |
{ —_ |
TYPE cnB1G~
— Aa
| TYPE D/3B2G
a
TYPE D/3B2G_ |
TYPE C/3B2G
TYPEE -
/2B1G
a
- HE
— ;
raure. Attach ment F 1
31/1008
JOB NUPMBEPC 8651 2166
FREFAFED By: JM M
BAT CHICK DY: R Q
not to scale
SCALE:
MILE LOSALION:
ITYPE H} TYPE H; ||
2816 2816 "
PS
TYPE HITYPE H | [rye HiTyPE H,
2816 ene 2B1G |2B1G |
ro. - > L _
to
TYPE D/3B2G |
TYPE C/3B2G
ae
TTB.
! |
I--TYPE C/2B1G
i - :
i |
TYPE D/aB26 |
|
TYPE C/3B2G
| an
TYPE D/3B2G
j
Il
ee ed
— TYPE C/2B1G
Page 100
2BiG |2B1G | 451%
ro
\“ oO
—
TYPE HITYPE H
CENTRAL EE
FACILITIES
_- oe Ll
TYPE H| TYPE H
2B1G |2B1G
1
4
7
re qe
|
|
5
' mi
SERVICED
APARTMENTS |
Jt jj
ls
TYPE ‘D/s826
2 2
ll a TYPEE
2B1G
er
ma
TYPE C/3B2G
—
|
tT |
[TYPE GI2B1G
J_
TYPE C/3B2G
se
_
sey |
TYPE HITYPE Hi
i
TYPE H TYPE H
2B1G |2B1G {llopiG |2B1G
a
a
I,
|
fr"
1
:
TYPE D/3B2G
-.
TYPE C/3B2G
ill
! r ; Lowa ‘| ‘ : . | |
; {| ] | “TYPE C/2B1G TYPE D/3B2G TYPE C/2B1G
TYPE D/2B1G | | TYPE D/3B2G |
ae ee! po ~~ — =
a _. T ll r . ted
TYPE F | |: TYPE D/3B2G_ | TYPE C/2B1G TYPE oer
> | (2BIG | TYPE C/2B1G a i 7 -
ee es = Ty ml
\ HW TYPE D/3B2G -
. TYPE D/3B2G i _ Tre C/SB26 — oy TYPE C3626 |
Ss b= “TLE fe di
oS ‘TYPE G/2B1G TYPE D/3B2G TYPE C/3B2G TYPE D/3B2G
I | TyPEE
. 5! roure: Attach tF2| rrcereoay, IMM
TYPE C/3B2G _-(BIG Se be bee Ra
wa ; ™ = — sense 8651 2/66 scae notto scale
TRL LOSAION:
_ ttl
———;
———
Page 101
~ = e Attachment F ore 34/1008 JOB NUF MEEPS 8651 2/66 RN 22 — FREPSRED RY: JMM cxuccemor RQ acte NOttoscale ——~
Page 102
roure: Attachment Fa | erearen ev. JIM - owe §=31/10/08 anckoor RQ venue: 8651 2/66 | sexe notto scale HLL LOSANION: -asy TYPES iI. ‘le -|| || TYPE H|TYPE 3B1G TYPE HITYPE H: Type H Tyre H\|| ||,2B1G_ |2B16 2B1G |2BiG ||281G |2BIG 9) I ye _ tL |_|. ke . | TYPE H|TYPEH |} || TYPE H/TYPE 2B16 | 2816 2B1G |2B1G ||| ||2B1G | 2B1G 4 TYPE D/3B2G EDN EE ret | | "TYPE C/3B2G | TYPE C/3B2G ~ a rot | ' TYPE C/2B1G TYPE D/3B2G LG ‘ TYPE D/3B2G TYPE C/2B1G: TYPE C/3B2G TYPE D/3B26. = _ . SSR J eT J TYPE D/3B2G TYPE C/3B2G i _ r ——— 5 ( — TYPEE ik, TYPE C/3B26 | | «BIG | —
Page 103
BUNS
rroereoer, SMM
CHICKED OY RQ
eau: not to scale
Wein)
nure, Attach ment F6
we 31/1008
sone: 8651 2/66
Swept Path Analysis
FRAY SS
HOW SARE SARAH}
XX SES
RQ) SP SSB QRZ
Seen rE SAO RSOS
SENXS RK REE
SSS
Sees
YZ
SERS
S 2X6 ey.
SSS
xX
|
y
i =
Page 104
= -
| | — i | LL
Lu | :
4 E Z\¢ 3 > |
etl ae INK A : RRS , QS C X Ze
CIR SESE RR QAI
ST f >> OS SN SOQ),
RE POOR
SS SES
RT RRR R
| oe
Ni
aS A A 4B A A A 4 <=? O we
% WY 2 . yw 7 7 2 7 >. fy .
Ny
— x yAN SY
TSA z %
SS AN A 6 %
Z YZ QZ Y ox SS
aS Da”
J
1
'
\ ae | —_—— ._+-__,
Page 105
LTE
Page 106
SSK
SEEZPLLLL IR
CLF
LIP DADA A LLG Prhende
ct
Swept Path Analysis
UNO maciel te Maelo (3
=~ rue Attachment F 8] encascoe. IMM
ooo oc 31/1008 cucexcoor RQ
semmaer 8551 2/66 ccs: MOL tO scale
VILL LOCAICR:
ARUP
Page 107
Appendix G Typical Sightline
Page 108
| [3B2G ee = /2B1G || 1 ‘Bom CRES sioHruned nourad> TYPE C/3B2G <+—— acme: RQ we | 24/11/08 K SOm (RES SLCRTUNG) . aBL6 & oy. . A, | ET TYPE D/3B2C 1 | Lt 2 | TYPE C/3B2G ——— . /2B1G — j | typeeE Ly A le not to sca jonunser 8651 27/66 SCALE: i TRLLOCAUION: =~ ' Porn aeshy
Page 109
AVENUES The Avenues are a further expression of the unique feeling of this facility. Cars are relegated to the laneways behind with only short stay visitor parking permitted. The result will be a generous and inviting streetscape with pedestrian priority, like the suburban streets of old. Canopy and clear trunked small trees will be employed in combination to provide a rich and varied streetscape. LANEWAYS Laneways are the service accessways for the development. They are high on function and essentially serve as private roads. The concentration of service facilities in these areas frees up the balance of the development from the domination of car and parking requirements. VILLAGE CENTRE This area will showcase quality open space, recreation ic Swimming pool and water feature. Pristine lawn will be provide runaround space for young grand children and great-granchildren. Natural rock will be expressed in walls and pavements THE APARTMENT CRESCENT The Crescent is a sweeping tree lined roadway servicing the higher density portion of the masterplanned community. Trees for this section are to be selected to provide shade and seasonal color to the streetscape. PRIVATE OPEN SPACE Private open space areas between bui considered to be critically important to lifestyle and choices for this development. Outdoor areas are carefully considered to afford appropriate solar access, privacy screening and outlook. Individual gardens will be designed to enhance the indoor/outdoor experience. LANDSCAPE CONCEPT PLAN - Masterpla aoe n @BlueCare fe vas: Landscape Masterplan Page 01 ARRIVAL PRECINCT The arrival precinct features a combination of dramatic architectural and open space design, quality finishes and wel resolved circulation network. Advanced Pandanus ( screw pines) will reinforce the coastal theme and remind visitors of the uniqueness of this coastal retirement facility. Visual axis will be critically considered with recreation facilities clustered around the primary avenue of the development. ENTRY PRECINCT The Single lane entry provides a unique opportunity to exploit the road verges with generous and inviting landscape planting. Entry Experience will be encapsulated in a formal application of stately native trees. The larger trees can, including native cypress will be well set back from the pavement edge to provide a feeling of welcome while smaller boutique plantings of Grass Trees (rescued from site prior to clearing operations) and native heathland species will be distributed in formal and informal arrangement closer to the road edge. c a d LANDGRAPHICS pedi cecns en st fe as) ete www.landgraphics.com.au
Page 110
@ BlueCare Ati Nh Lt ENTRY PRECINCT The Single lane entry provides a unique opportunity to exploit the road verges with generous and inviting landscape planting. Entry Experience will be encapsulated in a formal application of stately native Public Arrival Precinct Grass Trees 4 Plant rescue operation to salvage grass q trees for re-use on site. isd. san} Signage and Entry Statement Rock wall with pillar style entry signage provides site identification without dominating the surrounds. trees. The larger trees , including native cypress, will be well set back from the pavement edge to provide a feeling of welcome while smaller boutique plantings of Grass Trees (rescued from site prior to clearing operations) and native heathland species will be distributed in formal and informal arrangement closer to the road edge. LANDSCAPE CONCEPT PLAN - Public Arrival Precinct cage me SEIS HeSrae SE RA SS Sa pt een ee be aT Ee c a d LANDGRAPHICS usmREBce 1 Page 02 oar = www. landgraphies: com.au
Page 111
@BlueCare eee a Rc LANDSCAPE CONCEPT PLAN - Central Faci VILLAGE CENTRE ~ This area will showcase quality open space, recreation facilities and a dramatic Swimming pool and water feature. Pristine lawn will provide runaround space for young grand children and great-granchildren. Natural rock will be expressed in walls and pavements Pool, BBQ Area & Playground Recreation and lifestyle area. A meeting place for visiting families Feature Wall & Hedge To achieve privacy and containment within central facilities area. Eucalyptus ‘Summer Red’, a flowering, native bird attracting, is a colourful street tree. Cordyline rubras and Solitare palms make a striking combination as well as low maintenance for pool area. lities <keecmmea o Central Facilities Grass Trees Plant rescue operation to salvage grass trees for re-use on site. ARRIVAL PRECINCT The arrival precinct features a combination of dramatic architectural and open space design, quality finishes and well resolved circulation network. Advanced Pandanus (screw pines) will reinforce the coastal theme and remind visitors of the uniqueness of this coastal retirement facility. Visual axis will be critically considered with recreation facilities clustered around the primary avenue of the development. Sitting area and meeting place for visiting families. « a d Page 03 LANDGRAPHICS ete a = www. landgraphics.com.au
Page 112
Fire buffers, fire breaks and assembly areas Pathway Link for therapy, respite and cafe outdoor areas with seating and hardy decorative garden beds to maintain open air opportunity for residents Garden beds of easily maintainable shape break up open spaces and buffer private spaces from care units Therapy room accesses outdoor area for walking and sitting. Fire Truck Access Feature trees to entry carpark areas define the building frontage and enhance a sense of space. LANDSCAPE CONCEPT PLAN - Residential Aged Care + eeceearnisee 2 7 oe Le Residential Aged Care Timber boardwalk to partly roofed shelters over fenced detention basin area. Courtyard Area including a circulation track, a raised sensory garden , art node, feature tree and seating areas. Endemic palms and trees will be incorporated in the development. The mechanism of altering canopy heights will provide a dynamic elevation of canopy and reduce the height perception of built form. Assembly areas. Shade tree planting to carpark areas. c a d LANDGRAPHICS ae Page 04 ee
Page 113
LANDSCAPE CONCEPT PLAN - Village Avenues
@BlueCcare ee a
Village Avenue and Meeting Places
The Avenues are a further expression of
the unique feeling of this facility. Cars
are relegated to the laneways behind
with only short stay visitor parking
permitted. The result will be a generous
and inviting streetscape with pedestrian
priority, like the suburban streets of old.
Canopy and clear trunked small trees
will be employed in combination to
provide a rich and varied streetscape.
4
Example of BBQ & Bin Storage &
+
Paved area with pergola
cover provides a
meeting point away
from the built form.
MEETING PLACE - Area 1
Pergola and shelter allow for an
internal meeting point.
Circulation paths connect homes
to meeting areas.
MEETING PLACE - Area 2
Example of street tree planting
Footpaths connecting internal
communal areas and allowing for
circulation through the external
space. Garden bed planting, fencing
and pergolas encloses the area and
seating within shaded areas provides
for relaxation and meeting
opportunities.
MEETING PLACE - Area 3 Example of shelter
c co d
Page 05 LANDGRAPHICS
ae = _— = meee
www.landgraphics.com.au
Page 114
@BlueCare _ a — Typical Independent Living Unit 700 wide access path of natural stone pavers \ in coloured cement with expansion joints. \) \)/ (Nh Dividing fence and garden beds buffer private spaces from the road and adjacent care units. PRIVATE OPEN SPACE Private open space areas between buildings are considered to be critically important to lifestyle and choices for this development. Outdoor areas are carefully considered to afford appropriate solar access, privacy screening and outlook. Individual gardens will be designed to enhance the indoor/outdoor experience. Gardens beds of easily maintainable shape break up the open spaces from the road. ¢ a d LANDSCAPE CONCEPT PLAN - Typical ILU Page 06 LANDGRAPHICS 2a vaipneeremenne 047 ae -atravasrmeeiren ee sae TRIS + Som ‘ eee See SUAUNES TRADER Se EA ed ib omerees ommenraat www. landgraphics.com.au 2c PRS SRR ALUEk ae
Page 115
Q BlueCare _
Apartment Crescent
The Crescent is a sweeping tree lined roadway servicing the higher
density portion of the master planned community. Trees for this
section are to be selected to provide shade and seasonal color to
the streetscape.
Bioretention basin with gabion
retaining walls to be built fo
stormwater collection 4
A fire trail buffer will exist
between the proposed
development and the basin
and the vegetation buffer
to the boundary.
Existing vegetation buffer
to western development
boundary of development.
Planting areas in formal
configuration break up open spaces
and buffer private spaces from
adjoining units and passing traffic.
Fire Trail
Access to on-site fire trail.
c a d
LANDSCAPE CONCEPT PLAN - Typical Apartment and Crescent Not to Scale Page 07 LAND GRAPHICS
fe Oe een geeEE Se fs a
www.landgraphics.com.au
to ee FS a
Page 116
SU N RISE BEACH THE NOOSA PLAN - Division 17 - Landscaping Code
As per Table 14-52 - Lancscaping under The Noosa Plan $3.28) Tr ngs proposed except b) 14.156 Environment protection and
please note the following responses to Spectic Outcomes and some bose group plantings of Livistona spe
" conservation
Probable Solutions relevant to the Streetscape works. ings. These Watercourses and drainage lines - 024
° e pbanited ion a) Landscaping works along watercourses and as
14.152 General requirements part of drainage solutions retains and enhances
ere are no palm pls
Streetscape and amenity - 01 $33 s xisting riparian vegetation including understorey
a) Landscaped areas have been provided to 101 be planted b) Existing riparian zones will be rehabilitated by
en @ the natural landscape character reas tha! may be revegetation works that filter stormwater run off
P LA NT I N G I NT E NT b).¢) Natural features such as existing trees will be damaged and Improve and provide native wildlife habitat
retained and including in buffer areas where <) Lawn areas have been avoided at waterway and
Wetland Planting appropriate Solely and seourity 04 drainage line edges to prevent mowing damage
t d),e),f) Landscape areas have been designed to a) Safe sight distances to and trom road corners Seige
veway entries will be maintained
he building bulk from the road and
4) Engineering solutions to drainage have been
species have:been selected for hetghiand form 0656.1 Street trees and caroark areas wil pied where poustle wit lontacaring
responsive to the buildings and to screen and ¢ nisior a 20nh solutions implemented
shade roads. carparks and visable service areas Be UCONN Natural materials have been used where possible
@).h) Existing vegetated buffering is to be retained and = S6.2 eimaxkrum of 0,?mifrom in order to blend with the natural environment
improved through selective undergrowth Gearing finished road pavement level (not top of kerb).
and reinforcement plantings to major roadways Wildlife habitat protection - O25
and new buffering is to ed where this Services and utilities -O7 a) Landscaping retains and e .s habitats
cevelopment interfaces with adjoining existing s7.t Any landscaping adjacent ‘0 substations or native wildlife corrkiors by replicating adjacent
cevelopments. electriaity transmission line easements are to be
remnant vegetation including understorey
$1.2 Landscaping has beer designed e s than 4m high 3 ity and wal not vegetation
eaicaive Punt SeWoton hes bene encroach within 3m of any substation boundary, lL eitecapediareasfive:Geen:atied io:
7.2 Ani ler than 4 lanted at te ped
the Woodlands / Open Forest Areas f y, trees tamer tran 4rn we be’ pt a eae complement and integrate with existing
as far away from the eleczictty transmission line vegetation
Species Selection - 03 ‘exithey are expecied:to:be' hight matur ¢ Old trees including dead trees will be retained
a) Plant species are appropriate to the biophysical $7.3 Wis exnected that all power connections to where possinie to retain nollows f cal native
conditions and locality landscape character duildings wil be unde fauna
must follow the
uttined In this sector
) Species have beer selected for the space s7.4
available, visual and climatic exposure, as a
) Vegetation links will be created or enhanced
through garden planting between existing
Indicative Plant Selection lation fo the scale othe develope eee Cals - averse ees on koalas wl be mores by
¢) Species provice a 12 levels of shade $7.6 Species with Invasive not planting koala food species near roadways
Isolepsts nodosa
sunlight to the occupants and users of Ine Jar enough to Sorvices and facilitating movement in koals habitat areas
cao alan cevelopment roadway access throughout tne
Species for Perimeter Planting and Species for Riparian Planting ° seasons 14.155 Open space areas and road reserves Water Management - 026 - 26.1
Open Space Zones qd) The species selectec will require minimal Road reserves - 023 a) The infiltration and conservation of water is
a additional watering as they have Deen selected e) Landscaping enhances optimised through the selection of native plant
from species currently thing on urally “ species from PSF3 Landscaping Plants and
res Botaicl Name Cemmen sn PLANTING INTENT » estoy , goer memtn on
Botanical Name Common Name Casuarina glauca ‘Swamp She-Oak ites ncaa WA ive and b) Plants have been group in mulch garden beds
Rr eNe en pee ee Mem iee GUNG HepemenkT ae Tree Street Trees to Infrastructure maintained for venicles anc for pedestrians and Impervious surfaces have been minimised in the
ronychia i e rds Eye
2 " oN) Street Trees species are consistent with the bicycles through a share road reserve
oe , ae ae else ; peas pe ita ee GROUNDCOVERS & SEDGES locality and natural setting of this specific h) All suitaple existing ¢) Hard surfaces will be drained to landscaped
iAngaptiora:iiocer Smooth Barked Anph jotanical Name Common Name cevelopment and the developed Lots as a whole. will be retained and incorp areas rather than the street drainage system
Bichhouse myo Grey myrte Baumea articulate sointed Twig Club Rush Species will reflect adjoining developments streetscape st
rachychiton bitwi Busiy Kursiong Boures rubtinose Soft Twig Rush species though will be low maintenance and ) Lawn E allows forthe opening of 44.457 Carparking areas
, L800 Back Twe Blechnum sp Water rar selected as appropriate for this area and car doors along the roadw On-street car parks - 029
f lus ;wamp Callistemon Crum pedunculatum iver Lily landscape character. i) Landscaping allows for maintenance and $29.1 ’A ip hauin af SoOdim from Baekonker:of kaw
lustemon salgnus Weeping Whke Bottle Brush Eleochans sp Spikerush Species have been selected for specific “ Ki re i
Calitrrs columelians Cooloola Cyp ine Isolepsis nodosa Knobby Club Rush uses throughout the development, such as Pee Gera cde
Casuanna glauca Swamp She-Oak Juncus ustatus Common Rush Elaeocarpus eumundi reinforcement plantings in Buffer/Open Space h) a
eicigdinh a Methuen Areas, Shade and Feature Planting. Each rees are planted a mir
Oe 9 Species fulfils a spectiic function and is n of kerb in the road reserve verge
plectus litoral SI b Rush sultable for Landscaping main
validus River Club Rush
planted near structures that may cause damage
and dangerous species will not be located near
high pedestrian areas. Species in pedestrian
to avoid ponding to
Melaleuca quin
Melicope elleryana
e haroy plants lolera $23.1
Tristan Species for Streetscape and Internal e evel of ee eta ree Bm of frontage
Waterhousea floribunda Precinct Planting Syzvahimmecsum $3.18) Plant species have been selected from $23.2 Lawn and low plar
SHRUBS Woodlands / Open Forest Areas form PSP3. 18 back of kerb to
Botanical Name Common Name SPECIES SELECTED FROM NOOSA SHIRE COUNCIL'S os Tees ain Unsimaehie Beenies prenesed pcan A aol ea
‘Acacia suaveoiens Sweet Wattle LIST OF PREFERRED PLANT SPECIES PLANTING INTENT - Trees ae ae ahora a
Baeckea virgata Twiggy myrtle
Banksia robur Swamp Banksia TREES
Banksia spnubse Gokden Candlesticks Botanical Name Common Name
Baurea rubwoides Why Dog Rose Acmena smith Lilly Pity
Enostemon australe Cooloola Wax Flower Elaeocarpus eumundi Eumundi Quandong
Hovea acutifolia Hovea Flaeocarpu: ovatus Hard Quandong
Jacksonia scopana Dogwood Livistona australis Cabbage Paim PLANTING INTENT
Leptospermum specosu Wallum Tea Tree Syzygium oloosum Lilly Pilly
Leptospem Lemon Scented Tea Tuckeroc
Lep Wild May Weeping Lily Pily
Melastoma affine Blue Tongue
Pultenea sp Bush Pea SHRUBS & GROUNDCOVERS
Botanical Name Common Name
Adiantum hispidulum Malcenhal Fem Malkcope.okacyena
GROUNDCOVERS Alpina caerulea Native Ginger
Botanical Name Common Name Anigozanthus ‘Bush Gem’ Kangaroo Paw mollane « ,
Austromyrtus dukes Mid yim Calitris columoteris
Maidenhair Fem Banksia spinuiosa Gokien Candlesticks
Native Ginger ssus antarctca Water Vine ‘Cordyline rubra nen
Austromyrt Mid yim C ne rubra Red-Frultec Palm Lily Kemnendes contertton
Blechnum sp Water Fem Ci pedunculatum River Lity
Crssus antarctcs Water Vine Dianella caerulea fax Lit
Broad Leave Palm Lity Helichrysum aprcutatum Evertasting Paper Daisy
Reo-futied Palm Lily Pointed Leaf Hovea
Banksia spinviosa
Wild May
Dianesa caeruia Lomandra taniha Fine Leaf Mat Rush
Gahrua aspera Saw sedge Melaleuca thymufoka Thyme Honey Myrtle
4 - (c yenerva
Hardenbe! x Native Sarspacila Putterea sp Blue Tongue Melaleuca quing
Hipoerna scat Twaning Guinea Flowe: Kicnocarpus pindohus prostrate Prostrate Weddirg Bust
Juncus ustatus Commor Rush
manara contertus Mat-Rush
Mat-Rush
Mat-Rust
Resto cetapnylia
Entostemon spo.
Viola nederacea
Xartharhoes
NOTE :
for this
listed are a selection of plants sukable
lication, Not all plants wall
incorporated. Additional species may be added at fnal
design stage. A comprehensive plant schedule will be
prepared for Operaticnal \Varks application stage of the
assessment process.
LAaNDGRAPHICS
Melastoma affine
ivistonia australs
Backhousia myrtfoe eens
Hardenbergia volacea
Used in these records
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.