Council archive · source document
08/1128 - Response to Information Request [As Published] · 132008.1128
Very large file (18.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Page 5 25. The term “Residential Unit Dwellings” refers to independent living units, apartments and serviced apartments. The Queensland Development Code requires at least 3000L for a Class 1 building other than a detached Class 1 building. Based on 129 dwelling units including the independent living units, apartments and serviced apartments, 387 kL storage would be required. The Residential Aged Care facility has a roof area of 3768 m?*, Based on the QDC storage requirement of 15 Lim? roof area, this equates to 55kL. A total storage capacity of 387 + 55 = 442m? is required to comply with the Qoc. The re-use demand for the proposed development was determined as follows: e¢ Maximum Hour (MH) potable water demand (Noosa Planning Scheme Policy 6) = 3.3 L/sec/ha. « Assume 80% site area developed = 4.676 x 0.8 = 3.74 ha. « MH potable demand = 12.34 L/s. e Assume MH peaking factor = 4.5 x Average Day demand (in accordance with the Natural Resources and Water Planning Guidelines for Water Supply and Sewerage), thus AD = 2.74 L/s. « Based on 20% toilet consumption, 15% laundry consumption, and a 5 kLUday allowance for external use, the adopted re-use demand was 88 kLiday. « Based on rainfall data for the 10 year period, from 1989 to 1998, the adopted re-use demand would provide a 37% potable demand reduction with 95.6% reliability. 26. Please refer to above response demonstrating compliance with QDC. Earthworks 27. Detailed design of batters and banks will be undertaken as part of the Operational Works application. Primary retaining has been identified on the master plans and Site Cross Section no. DA_LADD 44 by smithttracey architects. This plan shows typical cut and fill requirements to achieve the requisite 1:20 gradients. Stormwater Modelling 28. Nambour rainfall and precipitation data was used only for water quality modelling. Stormwater quantity modelling undertaken based on site- specific Noosa IFD data. Gu
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1128 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 18.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.