Original source · versioned page text
Amended Stormwater Managment Plan
Attached to the e-mail SWMP & Protected Plant Survey - 3 of 4 MCU16/0081.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5594 – Walter Hay Dr, Noosaville 9
Parameter Value
Rainfall threshold (mm) 1
Soil storage capacity (mm) 500
Initial storage (% capacity) 10
Field capacity (mm) 200
Infiltration capacity coefficient (a) 211
Infiltration capacity exponent (b) 5.0
Initial depth (mm) 50
Daily recharge rate (%) 28
Daily baseflow rate (%) 27
Daily deep seepage rate (%) 0
Table 3.4 – Rainfall-runoff Parameters Adopted (Urban Residential)
TSS Log TP Log TN Log
Flow Type Surface Type
Mean Std Dev. Mean Std Dev. Mean Std Dev.
Roof N/A N/A N/A N/A N/A N/A
Baseflow
Driveways 1.00 0.34 -0.97 0.31 0.20 0.20
Parameters
Ground Level 1.00 0.34 -0.97 0.31 0.20 0.20
Roof 1.30 0.39 -0.89 0.31 0.26 0.23
Stormflow
Driveways 2.43 0.39 -0.30 0.31 0.26 0.23
Parameters
Ground Level 2.18 0.39 -0.47 0.31 0.26 0.23
Table 3.5 – Pollutant Export Values Adopted (Urban Residential)
3.3.3.1 Rainfall Data
Rainfall data for the site was chosen to give the best representation of actual conditions. A time period of
10 years between 1973 and 1983 was selected from the Cooroy Composite station, using a six minute time
step. The Mean Annual Rainfall for this period is 1595mm, and the Mean Annual ET is 1201mm. See
attached Appendix B for details.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.