Amended Stormwater Managment Plan
Attached to the e-mail SWMP & Protected Plant Survey - 3 of 4 MCU16/0081.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5594 – Walter Hay Dr, Noosaville 10
3.3.3.2 Treatment Nodes
The following devices have been used in the treatment train to reduce these pollutant loads to achieve WQO’s.
Bio-Retention Basin – An area of 100m2 of designated Bio-retention to treat carpark, landscape, and
roof catchments to achieve the WQO’s was modelled. An extended detention depth of 200mm with a
filter media of 200mm/hr sandy loam hydraulic conductivity has been modelled. The location of these
devices is shown on the attached Appendix A.
3.3.4 Effectiveness in Pollution Reduction
The water quality development model was set up with the incorporation of the above devices to reduce
pollutant export to WQO levels. Table 3.6 indicates the predicted pollutant mean values of stormwater
discharged as calculated by MUSIC:
Pollutant Percentage Load Reduction
Total Suspended Solids (TSS) 87.1%
Total Phosphorus (TP) 61.8%
Total Nitrogen (TN) 55.5%
Gross Pollutants (>5mm) 100%
Table 3.6 - Flow Based Pollutant Load Reduction
The MUSIC modelling results shown above indicate that the treatment train will adequately treat TSS, TP
and TN generated by stormwater runoff in accordance with the targets required under the water quality
objectives stated previously.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.