Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Amended Stormwater Managment Plan

Attached to the e-mail SWMP & Protected Plant Survey - 3 of 4 MCU16/0081.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5594 – Walter Hay Dr, Noosaville                                                             12




4.3      Modelling Overview
4.3.1    Methodology
The software package XP-STORM V2016, has been used to model the site in its current and post-
developed state. The modelling has been undertaken to determine detail design parameters of on-site
detention to replicate pre-development peak flow rates. As the development falls within the ‘Urban
Residential’ development category (QUDM), the minor (10yr ARI) and major (100yr ARI) storm events were
primarily sized for underground and overland design flows respectively.


All events ranging from 1, 2, 5, 10 20, 50 and up to the 100yr were analysed to compare pre/post
development discharges ensuring ‘non-worsening’ discharge. The development modelling and analysis
undertaken was based on the information provided by the detailed site survey and preliminary architectural
layouts. A rational method check of the pre-development scenario was conducted to calibrate the XP-
STORM model.


4.3.2    Catchment Areas
The subject site has been modelled in its existing pre-development and proposed post-development states
with the catchment areas illustrated in Tables 4.1 & 4.2 and Appendix A. In its pre-development state the
subject site was modelled as one hydrologic node to replicate the existing sheet flow situation for the lot.
XP-STORM model outputs are included in Appendix C of this report.


 Node                 Description                       % Impervious      Area (Ha)


 ‘PRE’                Landscape                         0                 0.900


 Total Catchment (ha)                                   0                 0.900
Table 4.1 - Pre Development Node Sub-Catchment Areas


 Node                        Description                % Impervious      Area (Ha)
 ‘BIO’ (detention basin)     Roof                       100               0.355
                             Carpark/hardstand areas    100               0.197
                             Development Landscape      0                 0.100
                             Area
 ‘201’ (no detention)        Existing Landscape Area    0                 0.518
 Total Catchment (ha)                                                     1.170
Table 4.2 - Post Development Sub–Catchment Areas
Log in to download the original file

Amended Stormwater Managment Plan.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.