Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Amended Stormwater Managment Plan

Attached to the e-mail SWMP & Protected Plant Survey - 3 of 4 MCU16/0081.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5594 – Walter Hay Dr, Noosaville                                                               11




4.0 Stormwater Quantity Management
4.1      Background
The proposed development has the potential to alter the existing hydrologic and hydraulic characteristics of
the subject site unless suitable mitigation is achieved via careful hydraulic design of the proposed
stormwater management drainage system. With urbanisation there is potential for sites to create or
exacerbate drainage problems to downstream areas and/or drainage infrastructure. The purpose of this
section of the SWMP is to determine the general requirements for bulk stormwater management for the
proposed development. The design shall ensure that rainfall event discharges are mitigated and conveyed
from the site in a manner that complies with Council’s Urban Stormwater Planning Guidelines and does not
result in a worsened drainage situation to downstream infrastructure, without causing a nuisance or
annoyance to residents/property owners.


4.2      Site Drainage Constraints and Opportunities
4.2.1    Drainage Constraints
The increase of impervious areas will impact on the existing downstream boundary condition compared to
pre-development peak flows. Therefore, a volume of detention will be required to limit flows to that of pre-
development.


4.2.2    Drainage Opportunities
The second existing swale off the western boundary is deemed the lawful point of discharge for the site as
this is where the majority of site surface flows concentrate under existing conditions. The swale has
adequate depth for Bio-retention basin and detention volume.
Log in to download the original file

Amended Stormwater Managment Plan.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.