Original source · versioned page text
Amended Stormwater Managment Plan
Attached to the e-mail SWMP & Protected Plant Survey - 3 of 4 MCU16/0081.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5594 – Walter Hay Dr, Noosaville 16
Flows from minor storms up to and including the 10 year ARI are to be conveyed in the underground
drainage system from the Bio-retention basin. Major storm events exceeding the ARI10 year, up to and
including the peak ARI 100 year events will overtop the Bio-retention basin weir and flow overland into
Council’s road reserve.
A concept drainage layout plan has been included as Appendix A of this report.
4.4 Modelling Results
A node layout plan is included in Appendix C of this report and the resultant peak flow rates are displayed
in Table 4.3 & 4.4.
ARI Design Storm (min) Peak Flow (m3/s)
1 90 0.101
2 60 0.150
5 60 0.208
10 60 0.247
20 60 0.289
50 60 0.335
100 60 0.383
Table 4.3 – Pre-Development Peak Flow Rate Results
3
ARI Design Storm (min) Peak Flow (m /s)
1 60 0.100
2 60 0.129
5 60 0.158
10 60 0.179
20 90 0.223
50 90 0.304
100 90 0.381
Table 4.4 – Post-Development (mitigated) Peak Flow Rate Results
As can be seen in Tables 4.3 & 4.4 the post-development peak flow rates to the existing drainage system
compare well to that of the existing pre-development site discharges. This is due to the large volumes of
on-site detention proposed to be included as part of the development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.