5.0 Conclusions
This report has outlined a total water cycle strategy to be adopted in the construction and operational
works phase of the development which satisfies the acceptable solutions set out in Councils planning
scheme policies.
Wastewater minimisation strategies will be adopted to reduce the demand on Council’s existing
infrastructure;
Best practice and practical water quality improvement devices are proposed which includes a Bio-
retention area of 100m2;
A combined 404m3 of detention volume is proposed to mitigate peak flows to that of the pre-
development scenario to ensure a situation of ‘non-worsening’.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.