PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
h. Ensure permanent irrigation is not installed within the road reserve.
i. Ensure all weeds and debris are removed from planting areas prior to planting.
j. Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free
of foreign matter including anthropogenic waste, rock, soil / sediment
contamination and is applied to ensure a minimum 100mm depth once settled.
6. Soil provided for landscaping must provide for the site specific vegetation
performance objectives.
7. All landscape works must be completed prior to the commencement of use.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
8. At least 5 working days prior to any works commencing, written advice must be
provided to Council detailing:
a. The name, contact details and ACN for the supervising Registered Professional
Engineer of Queensland (RPEQ) and Principal Contractor.
b. Proposed dates for commencement and completion of construction.
9. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to
ensure that any subcontractors also have the appropriate insurance and public
liability documentation. Certificates demonstrating currency of public liability
insurance and works insurance covering the works must be submitted to Council prior
to the prestart meeting.
10. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart meeting*. The contact number to arrange a prestart meeting is
5329 6291. The prestart meeting must include the relevant parties for the following
aspects of the works:
a. Civil engineering works.
b. Landscape works.
c. Erosion and sediment control works.
* (Refer to Advisory Note)
11. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction at the “prestart” meeting.
12. A detailed existing condition report and photographs of all frontages of the site
including existing footpath, kerb line and road pavement must be completed and
submitted to Council prior to the prestart meeting.
13. A condition report including photographs of all existing fences and retaining walls
bordering the site and any buildings, structures, pathways, landscaping features etc
on adjoining properties that could potentially be impacted on by the proposed
earthworks and construction works must be completed and submitted to Council prior
to the prestart meeting.
14. A Construction Management Plan must be submitted to Council for approval prior to
the prestart meeting and must specifically include/address the following:
a. Traffic Management during all aspects of the construct phase including:
Page 18 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.