PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and
traffic control measures to be installed prior to construction.
ii. Fencing to the work site during the construction phase to ensure the
safety of the public and the road users.
iii. Maintenance of safe pedestrians and cyclists access across the frontage
of the site both during daily construction and after daily construction has
ceased.
iv. Sufficient parking arrangements for trucks, machineries and construction
workers without adversely impacting on traffic flow and/or the availability
of on-street parking in the local street.
b. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures.
c. Works programme identifying key components of the works and their respective
durations.
d. The proposed dates for the commencement and the completion of the works.
e. Effective procedures and measures to minimise adverse environmental impact
on other properties and roads users including noise and dust emission.
f. Establishment of a communication protocol with the adjoining owners and any
other affected parties to advise of construction times, impacts on traffic and
services and any other relevant issues.
g. Identification of communication and complaint management procedures
including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
15. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five
business days of the change occurring.
16. Any alteration to existing services or conflict between the development and an
existing or proposed service must be referred to the relevant service authority for
determination prior to commencement of works.
DURING CONSTRUCTION
General
17. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets
must be repaired immediately where it creates a hazard to the community. In
circumstances where the damage does not create a hazard to the community, it must
be repaired immediately on completion of the works associated with the
development.
18. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit. Where municipal
works are involved (eg pathway), such confirmation must be submitted for the
respective hold points prior to any site inspection by Council Officers.
19. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans and conditions detailed in this Decision Notice.
Page 19 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.