Original source · versioned page text
2017-02-07 Planning and Environment Committee Agenda
The original of this document is very large (19.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
Certification
39. Upon completion of the work and prior to the final inspection a certificate must be
issued by an RPEQ certifying that the works have been constructed in accordance
with the Operational Works permit and applicable engineering standards.
40. A final inspection and approval of the completed works by Council’s Inspector is
required. Please contact Council on 5329 6291 to arrange for the inspection.
As Constructed Plans/On Maintenance
41. All municipal works must be accepted ‘On Maintenance’ by Council in accordance
with Council’s relevant Planning Scheme Policy. To achieve ‘On Maintenance’, the
supervising RPEQ must submit to Council:
a. Certification that all works have been undertaken and completed in accordance
with the requirements of this Permit.
b. As Constructed details in accordance with Council’s Planning Scheme Policy.
OPERATIONAL WORKS - SIGNAGE
Nature and Extent of Approved Development
1. This approval authorises the following signs as defined by the planning scheme and
shown on the Approved Plans:
a. 1 pylon sign
b. 3 wall signs
2. The approved signs must not be used for the advertisement of goods and/or services
not sold or conducted on the site (ie. third party advertising).
3. The approved signs must not exceed a maximum sign face area of 4m² (per sign)
and must not exceed a total sign face area of 10m² (a combined total of all signs on
site). The tank and stand pylon sign must not exceed 5m in height from the natural
ground level.
4. The approved signs must be positioned wholly within the property boundaries of the
subject site, and must not be located within or across any easements.
Illumination
5. The approved signs must not be illuminated in any way except for 2 wall signs, being
1 sign located on the north elevation and 1sign located on the western elevation.
6. The approved illuminated signs must not incorporate flashing lights nor involve
illumination by any means other than:
a. an internal light source
b. a down light, if externally lit.
7. Illumination resulting from direct, reflected or other incidental light emanating from the
approved signs must not exceed a luminance of 300 candelas per square metre.
8. All conduits, wiring, switches or other electrical apparatus installed on an advertising
device must be concealed from general view.
Movement
9. The approved signs must not revolve, move, contain moving parts, change its
message, flash, have a moving or flashing border, or give the impression of
movement in any way.
Page 23 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.