PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
Erosion and Sediment Control
33. Sediment and erosion control measures must be in place prior to works commencing.
If such measures are not in place or are not satisfactory, “on the spot” fines may be
issued. Such fines can be issued if sediments from the site are found to enter or have
the potential to enter Council’s stormwater system, natural waterways, any
downstream stormwater filtration system or adversely impacting on other properties.
The sediment and erosion control design and measures have NOT been approved, it
is the site's Supervising Engineer who is responsible for ensuring that the sediment
and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance
with "best practise" methods,
b. Been revised by an RPEQ or CPESC to address the issues raised by changes
in the projected construction schedule and/or methods,
c. Been revised to address predicted rainfall events, and
d. Achieve the desired environmental outcomes.
Council may request further controls to be installed should the implemented
measures be found inefficient.
34. The erosion and sediment control measures must be designed, installed and
maintained in accordance with the supervising engineer instructions and the current
best practice standards (refer to advisory notes).
35. The applicant must ensure non essential exposure of soil is prevented by restricting
the extent of clearing and minimising the duration of soil exposure to adverse weather
conditions and effectively turf or stabilise any cleared area without delay and prior to
rainfall occurring.
36. The applicant must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles
and/or machinery. It is essential to implement appropriate approved erosion and
sediment control measures throughout the site during all phases of construction
including vehicle shakedown pad/grid (or similar) at the access to the construction
site.
37. Prior to the completion of the development and commencement of use, all site
surfaces must be effectively stabilised using methods which have achieved effective
short-term stabilisation and which will continue to achieve effective stabilisation in the
medium to long-term. For the purpose of this condition, an effectively stabilised
surface is defined as one that does not, or is not likely to result in visible evidence of
soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to
water contamination.(for larger sites)
Damage to Services and Assets
38. Any damage caused to existing services, streetscape and assets (including kerb and
footpath) as a result of the development works must be repaired at no cost to the
asset owner at the following times:
a. Where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. Where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Page 22 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.