Original source · versioned page text
2017-02-07 Planning and Environment Committee Agenda
The original of this document is very large (19.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 FEBRUARY 2017
2. Trunk Park Types
The current PIP includes all levels of parks under the Local, District and Regional (Shire-wide)
categories, however for the new LGIP, it is proposed that only parks at the District and Shire-
wide levels be included. The considerations in making this proposal to exclude Local parks from
the new LGIP is derived from review of sections 2.3 and 2.5.5a of the current Statutory Guideline
03/14 as follows:
Section 2.3:
“Infrastructure may only be identified in an LGIP if that infrastructure is development
infrastructure which the local government has also determined is trunk infrastructure.
Non-trunk infrastructure is generally infrastructure that is internal to a development,
connects a development to external infrastructure networks or necessary to protect or
maintain the safety or efficiency of the infrastructure network of which the non-trunk
infrastructure is a component.
To assist local governments in making a determination as to whether infrastructure is trunk
infrastructure, the following matters should be considered:
function – does the infrastructure provide a distribution function, collection function or
service to a wider catchment comprising multiple development sites?
number of users – does it service multiple development sites or catchments of users?
development certainty – can the planning of the infrastructure be undertaken without
knowing the details of individual developments? For example, can the infrastructure be
planned without knowing the detailed layout for lot reconfigurations or the design of the
development?”
and
Section 2.5.5a:
“When deciding what infrastructure to include in the PFTI and consequently what is defined
as trunk infrastructure, a local government must consider:
(1) the matters stated in Part A, section 2.3 (Infrastructure identified in a local
government infrastructure plan) of this guideline;
(2) whether the infrastructure:
a) is necessary to service assumed growth and urban development or an increase in
the standard of service inside the PIA;
b) provides an affordable, yet adequate standard of service to development;
c) is the most cost effective means of servicing assumed growth and urban
development, having regard to not only the capital cost, but also the maintenance
and operating costs of the infrastructure going forward;
d) reflects a consistent servicing strategy across all trunk infrastructure networks
(3) its ability to fund the infrastructure.”
In examining local parks, it considered that these are generally:
created as a park internal to a lot reconfiguration development and do not generally satisfy
the distribution, collection or service the wider catchment functions;
only services small numbers of users and not multiple development sites or catchments of
users;
cannot be planned without knowing the detailed layout for lot reconfigurations;
not the most cost effective means of servicing assumed growth and urban development;
Page 71 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.