1. BACKGROUND
A Development Permit for a Material Change of Use - Landing - Residential and Operational Works
– Jetty was issued on 10 September 2026
The applicant suspended the appeal period and made representations on 25 September 2026 to
the development approval conditions. The representations are detailed below but primarily relate
to re-engineering of the proposed jetty approved on the 10th of September 2026 to substitute timber
construction with alternative materials including concrete insitu piles, aluminium framing and
composite decking to improve durability, longevity and reduce maintenance requirements of the
completed jetty.
The requested doesn’t comply with Acceptable Outcome 19.1(c) of the Waterways Works Code
by not being constructed with timber. The proposal does satisfy the corresponding Performance
Outcome for the reasons discussed above.
The updated plans submitted with the representation also indicate an increased jetty head length
of 200mm that does not result in an exceedance of the permitted jetty head area or contravention
of offsets to the prolongation of boundaries. As such the proposed jetty remains compliant.
2. ASSESSMENT
An assessment in relation to each of the submitted representations is provided below:
Existing Condition 1
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
S01 C1 Drawing Schedule & Transmittal 29/06/2026
Prepared by Long View Consulting
Engineers
S02 C1 Structural notes Sheet 29/06/2026
Prepared by Long View Consulting
Engineers
S03 C1 Site Plan, Framing Plan, Elevations 29/06/2026
Prepared by Long View Consulting
Engineers
S04 C1 Jetty Framing Details Sheet 1 29/06/2026
Prepared by Long View Consulting
Engineers
S05 C1 Jetty Framing Details Sheet 2 29/06/2026
Prepared by Long View Consulting
Engineers
Applicant’s Request
The applicant has requested existing condition ‘1’ be amended and replaced with the following
amended condition:
Page 2 of 5
Document Set ID: 25242703
Version: 3, Version Date: 12/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU26 0064 & OPW26 0093 (As Published).pdfRelated documentApplication case desk ↗
Negotiated Report (Representations made) MCU26 0064 & OPW26 0093 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 126 KB (small file)
- File type
No other editions are linked here.