Original source · versioned page text
Attachment B - Current Development Approval
Weather Protection
6. Street awnings must be provided along the full length of the western, eastern and southern
frontages as shown on the approved plans. The awnings must have a minimum width of 2.4
metres from the building line or the same unless otherwise approved and must be designed
to provide continuous solar and rain protection and promote all weather activity.
7. All ground floor shopfront glazing must be protected against vandalism by the use of a form
of safety glass such as toughened or laminated glass.
8. The eastern balcony area above ground floor must not be enclosed by permanent fixtures
such as shutters, louvres, glass panelling or the like.
9. During operating hours, pedestrian areas and entrances/exits to all stairwells, lifts, foyers
and public toilets must be well lit with vandal resistant lighting and with intensities to satisfy
the requirements of Australian Standard AS1158 “Public Lighting Code”. Lighting must be
designed to reduce the contrast between shadows and well-lit areas.
10. The approved use must not operate outside the hours of 6am to 10pm seven days a week,
except for Food and Drink Outlet which may operate on Friday and Saturday until 12
midnight.
11. The requirements of this condition must be included in the Community Management
Statement for any body corporate for the subject site.
Operations
12. The operation of the food and drink outlet and associated activities must not result in
environmental nuisances such as noise, visual or odour impacts that unreasonably diminish
the amenity of the area or surrounding uses.
13. Any live music must be contained within an enclosed acoustically treated environment.
14. Acoustic live music (not reliant on electric or electronic equipment) must cease to operate in
outdoor spaces by:
a. 9:00pm Sunday – Thursday and public holidays
b. 10:00pm Friday and Saturday
15. Amplified live music must cease to operate in an outdoor space by 7:00pm seven days per
week.
Currency Period
16. This development approval lapses if the use has not happened by 16 February 2028 unless
an application to extend the currency period is approved by Council.
Building Height
17. The maximum height of the development must not exceed RL17.36 as detailed on proposed
elevations DA203-A.
18. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Performance Bond
19. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any costs
incurred by Council in respect of enforcing performance of this permit. Council reserves the
right to call upon the bond or guaranteed sum to effect compliance with conditions.
Page 3 of 9
Document Set ID: 23023144
Version: 6, Version Date: 22/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original