Attachment B - Current Development Approval

of 10

Page text shows just the words. Original shows the document exactly as it was published.

                      Street Identification
               20.    The street address of the development must be clearly visible and discernible from the
                      primary frontage of the site by the provision of a street number and, where appropriate, the
                      building name.
                      DURING CONSTRUCTION
                      Retention of Existing Trees and Vegetation
               21.    All trees and surrounding vegetation identified on the detailed survey DWG 204099 004 DS
                      rev 0 for retention must be protected in accordance with AS 4970, Protection of trees on
                      development sites.
               22.    A qualified person * must be engaged for the duration of the works to:
                      a.      Oversee installation of all tree protection fencing prior to commencement of any works
                              onsite.
                      b.      Supervise tree protection within the development site and frontages, prior to, during
                              and following construction in accordance with AS 4970, Protection of trees on
                              development sites.
                      c.      Undertake a risk assessment of the ‘Pandanus tectorius’ that is extending within the
                              development footprint, and carry out amenity pruning in accordance with AS 4373,
                              Pruning of amenity trees to protect the tree during the construction process.
                      *(Refer to Advisory Note)
                      Water & Sewer Connections
               23.    An underground connection to reticulated water and sewerage must be provided to the
                      development site in accordance with the standards and requirements of Northern SEQ
                      Distributor–Retailer Authority (Unitywater).
                      A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the development site.
                      Services
               24.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               25.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               26.    Unless otherwise agreed in writing by the relevant service provider, any public or third-party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
                      All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
                      All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Damage to Services and Assets
               27.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:



                                                                                                       Page 4 of 9
Document Set ID: 23023144
Version: 6, Version Date: 22/05/2024
Log in to download the original file

Attachment B - Current Development Approval.pdf · 209 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.