Council archive · source document
01072015144724 · MCU10/2065
Attached to the e-mail MCU10/2065.01 Request to Extend the Development Approval 17 Grant St Noosa Heads.
MCU10/2065 Approved Plans . Plan : Rev. | Plan Name Date Drwg No. A-01 Cc Site Plan Level 7, prepared by EPS Design | 14/07/11 Drwg No. A-02 c Site Plan Level 2, prepared by EPS Design | 14/07/14 Drwg No. A-03 - C | Level 7, prepared by EPS Design __ |. 14/07/11 Drwg No. A-04 Cc Level 2, prepared by EPS Design 14/07/11 Drwg No. A-05 D Southeast. & Northeast Elevations, | 14/07/11 prepared by EPS Design Drwg No. A-06 B Northwest & Southwest Elevations, | 14/07/11 prepared-by EPS Design These Advisory Notes do not form part of this approvai or the conditions attached thereto. ' The. following Advisory Notes are intended to provide guidance to the applicant where necessary and inform the applicant of actions that Council may take with respect to the development site or the approval: CIVIL ENGINEERING 1. In this document, an effectively stabilised surface is defined as one that does not: 1.1." ‘have visible evidence of soil loss caused by sheet, rill or gully erosion or 1.2. lead to sedimentation, or 1.3. - lead fo water contamination. 2. Diverting clean stormwater runoff into a sediment basin is an inferior option to diverting clean stormwater around or through the site because it will cause an increase in the volume and frequency of contaminated releases from the sediment basin. For this reason, diverting clean stormwater into a sediment basin is not acceptable unless the proponent demonstrates that diverting clean stormwater around or through the site is not feasible. : — 3. Compensatory controls are erosion controls, flow controls and sediment controls which compensate for the lack of sediment basin and are applied such that the type, timing, placement and management of controls. minimise the potential for water contamination and environmental harm. This is primarily achieved by reducing the risk of erosion and : subsequent sediment release, for example by turfing or mulching and managing concentrated flows in the area. . 4. Research has shown that sediment basins designed on a “batch” or total storm capture approach are only capable of treating a small percentage of the annual runoff volume without basin size becoming excessive. Innovation in sediment basin design to incorporate continuous flow treatment is likely to occur in the future and as this technology becomes available in-best practice guidelines it is required that this technology be adopted where a better water quality outcome will result. In the interim the minimum basin size is as specified in the condition. PD-DA-FM384/1-13/04/2010 Page 8 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
01072015144724.pdfRelated documentApplication case desk ↗
01072015144724.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.